ML18087A606

From kanterella
Jump to navigation Jump to search
Responds to 821202 Telcon Re Emergency Operations Facility Survey.Facility 7.5 Miles from Generating Station & Consists of Concrete Block Facility within Concrete Block Bldg. Protection Factor Is 13.Ventilation Sys Isolable
ML18087A606
Person / Time
Site: Salem  
Issue date: 12/06/1982
From: Liden E
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8212130212
Download: ML18087A606 (2)


Text

'~

PS~G, Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department December 6, 1982 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention:

Mr. Steven A. Varga, Chief Operating Reactors Branch #1

Dear Mr. Varga:

EMERGENCY OPERATIONS FACILITY SURVEY SALEM GENERATING STATION DOCKET NOS. 50-272 AND 50-311 This letter confirms the information provided to Mr. William J. Ross of your staff by telephone on December 2, 1982 in response to an Emergency Operations Facility Survey being conducted for the NRC Commissioners:

0 EOF Location:

a Structural Type:

0 Protection Factor:

° Construction Start Date:

Approximately 7.5 miles from Salem Generating Station.

Concrete block facility within a concrete block building.

Calculations indicate a protection factor of 13.

Construction commenced in the Spring 1981 and was completed in September 1982.

0 HEPA Filtration:

The EOF ventilation system is isolable /J. 0 '/ S' and contains HEPA filters.

~

--8212130212 821206 PDR ADOCK 05000272 F

PDR The Energy People 95-2169 {4M) 3*82

Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 12/6/82 o Interim EOF:

The interim EOF was located in Quinton, New Jersey, approximately 7.5 miles from Salem Generating Station.

Should you have any questions do not hesitate to contact us.

Very truly yours, Manager -

Nuclear Licensing and Regulation