ML18087A564
| ML18087A564 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/22/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18087A565 | List: |
| References | |
| NUDOCS 8211090515 | |
| Download: ML18087A564 (4) | |
Text
";,UNITED STATES
- NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC"COMPANY DELMARVA. POWER AND. LIGHT. COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATTON, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE
{"~ 0
- ~---
Amendment No. 14 License No. DPR-75
- l.
The* Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
- c.
D.
. E.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated September 17, 1982 complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules arid. vegulations set forth in ULCFR Chapter I ;
t'~..
"~
--~-
The facility will operate in conformity with the application, the provisions of the* Act, and the ~ules and regulations of the Commission; There is reasona51 e assurance (.i} that the activities authorized by this amendment can oe conducted *without endangering the health and safety of the puolic, and (ii) that such activities will be conducted in-compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1he issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have 5een satisfied.
.. r-92-i 1090515 8210221 PDR ADOCK 0500031 p
\\
j
... 2.
Accordingly, the Facility Operating License No. DPR-75 is hereby*
amended by renumbering Paragraph 2.L to read 2.M and by adding a new Paragraph 2.L. to read as follows:
L.
The licensee is authorized to defer certain eighteen-month surveillance items from the dates required by Technical Specifi-cation 4.0.2(a). These surveillances shall be completed prior to startup following the first refueling outage.
The prqyisirins of Technical Specification 4.0.2(b) are not changed.
Th:i;-
- affected items are identified in the Safety Evaluation crccompanying this license change.
- 3.
This license amendment is effective as of the date of issuance.
Date of Issuance:
. October 22, 1982
\\.
! I......
~
Va ga, Operating Reacto Division of Licen No. l
ATTACHMENT TO LICENSE AMENDMENT NO. 14 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise Facility Operating License No. DPR-75 as follows:
Remove Page Insert Page 23 I
\\.
'I
~.
23
.. ~ _,:-
/;:'.~~
i!'~
- c
- H.
If PSE&G plans to remove or to make significant chan-gesin* the normal
___.,..o.peration of equipm::nt that controls the amount of radioactivity in..
effluents from the Salem Nuclear Generating Station. the NRC shall be notified in writing regardless of whether the change affects the amount of radioactivity in effluents.
I.
PSE&G sha 11 report any vi o 1 ations of the requirements. cont~; ~ed. in Section 2~ Items C.(3) through C.(25). E.. F ** and G of. this Hcense within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone and confinned by telegram. mailgram. or facsimile trarysmission to the Director of the-Regional Office. or his designee. no later than the first working day following the *
~!?
violation. with a written-Jollowup report within 14 days.
~.
J.
- Ttie 1,censees shall irrmediately notify the Corrrniss1on of~ny accident at *this facility which could result in an unplanned release ~f
~uantit~es of fission products in excess of allowable limi~s for normal operation es tab 1 i shed by the Cornni ssion.
K.
The licensees shall have and maintain financial protection of $U~h type and in such amounts as "the Commf~ion sha l1 require in accord:.
ance"with Section 170 of the. Atomic Energy Act of 1954~ as amended.
to cover public liability.cl~1ms.
- t.
ti..
~;...
The licen~ee is authorize.d to defer certain eighteen::-~iith surveillance*
items from the dates requ*ired by Technic~l Specification 4.0:2.(a).
These surveillances shall be completed.prior to.startup following the first refueling outage.
The provisions of Technical *specification 4.0.2(b) --
ar-e not -changed.
The affected items are* identified in the. Safety.Eva1u-a_tj_on accompanying this license cha_nge.,,
M.
This license is effective as o.f the date of issuance and shall expire at midnight September 25~ 2008.
Attachment:
Appendices* A & B FOR THE NUCLEAR REGULATORY COMMISSION tdson G. Case. Acting Director Office of Nuclear Reacto~ Regulatio~
- ia:e of Issuance: May 20, 1981
- . Amendment No. 14
..