Person / Time | |
---|---|
Site: | Diablo Canyon, San Onofre ![]() |
Issue date: | 03/26/1981 |
From: | Lowery B HOUSE OF REP. |
To: | Kidd G AMERICAN SOCIETY OF MECHANICAL ENGINEERS |
References | |
NUDOCS 8105120344 | |
Download: ML18086B696 (1) | |
Similar Documents at Diablo Canyon, San Onofre | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999
[Table view]Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy 1999-09-03 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20216H7321997-09-10010 September 1997
[Table view]Ack Receipt of Disagreeing W/Some Conclusions Stated in from NRC in Response to .Nrc Has Exclusive Jurisdictional Authority Over Discharge of Radioactive Wastes & Seismic Safety at SONGS ML20117M5461996-08-27027 August 1996 Requests Authorization for Matl Change in Discharge of SONGS Units 2 & 3.Effluent Limits & Monitoring Requirements for Chemical Metal Cleaning Wastewater at Station,Encl ML20086B2361995-06-22022 June 1995 Forwards Notice of Filing Application in Listed Proceeding, a 95-05-049 Re Energy Cost Adjustment Clause Application (U 338-E) of Sce,For Filing W/Ca Public Utilities Commission ML20083C9361995-05-16016 May 1995 Requests That CA Public Util Commission (Cpuc) Relieve CA Energy Co (Cal Energy) & Luz Intl of Any Cost Responsibility for Expenditures Incurred in Const of Transmission Line ML20062J8311993-11-10010 November 1993 Forwards Certificate of Service of Notice of Filing Application of SCE (U 338-E) for Filing W/Commission,Per Rule 24 of Commission Rules of Practice & Procedure ML20006F6411989-08-11011 August 1989 Summarizes 890808-10 Meeting in Rockville,Md Re Diablo Canyon Nuclear Power Plant ML20237L5761987-08-0606 August 1987 Advises of Favorable Impression Re Competence of People, Thoroughness of Approach & Robust Resilent Methodology Which Allows for Introduction of New Data at Any Time,Per PG&E 870715 Workshop on long-term Seismic Program ML20237L5571987-07-27027 July 1987 Summarizes Nrc/Pg&E 870715-16 Workshop in San Francisco,Ca Re Plant Ground Motion DCL-87-121, Forwards Addl Info Re Application for State of Nv Site User Permit for Beatty,Nv Low Level Waste Disposal Site, Including Clarification Re Util Radwaste Processing, Indemnification Agreement & Procedures1987-05-28028 May 1987 Forwards Addl Info Re Application for State of Nv Site User Permit for Beatty,Nv Low Level Waste Disposal Site, Including Clarification Re Util Radwaste Processing, Indemnification Agreement & Procedures ML20211A1661987-02-12012 February 1987 Requests All Documents in Possession of Pg&E,Consultants, Contractors or Agents Re Addl Parametric Studies Conducted for Facility High Density Racks.Related Correspondence ML20207M8801987-01-0505 January 1987 Provides Summary Rept of Unusual Event at Facility,Per Rev 1 to NUREG-0654.On 870102,smoke Discovered in Area of High Pressure Turbine at Unit 1.Caused by Minor Bearing Shaft Seal Leak.Event Did Not Affect Health & Safety of Public ML20212B2341986-12-20020 December 1986 Forwards Rept of Discharge Monitoring at Diablo Canyon Power Plant During Month of Nov 1986 ML20213A3581986-11-28028 November 1986 Summarizes 861120 Meeting in Washington,Dc Re Facility long-term Seismic Program ML20197B3311986-10-23023 October 1986 Requests Reconsideration of Lack of Relevant Response Re Interrogatory 3 Concerning Dissimilar Metal Contact.Util Drawing 439504 Shows Third Dissimilar Metal (SAE 62 Bronze). Certificate of Svc Encl.Related Correspondence ML20210V2491986-10-0101 October 1986 Discusses Request to Reroute Discharge 001N Secondary Effluent from Package Sewage Treatment Plant for Domestic Sewage Only.Rerouting Acceptable Per Discharge Prohibition A.3.Revised Program Encl ML20214P4941986-09-20020 September 1986 Forwards Rept on Discharge Monitoring at Diablo Canyon Power Plant During Month of Aug 1986 DCL-86-235, Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 8701311986-08-12012 August 1986 Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 870131 ML20198J1141986-05-23023 May 1986 Forwards Rev to Radioactive Effluent Release Data for 1984, Per 860422 Request for Review.Rept Data Only Covers Last Half 1984 ML20203P5831986-05-0101 May 1986 Forwards Diablo Canyon Power Plant 316(b) Cooling Water Intake Assessment,1985 Annual Rept & Thermal Effects Monitoring Program,1985 Annual Rept, Per Provision D.4 NPDES Permit CA0003751 ML20203G0511986-04-20020 April 1986 Forwards Rept on Discharge Monitoring at Diablo Canyon Power Plant During Month of Mar 1986 ML20137N3871986-01-27027 January 1986 Advises That on 860126,earthquake Detected by Seismic Instrumentation Sys & Felt by Control Room Personnel. Emergency Notifications initiated.Post-earthquake Walkdown & Insp Determined That No Damage Occurred ML20136B7371985-10-0303 October 1985 Forwards Facility Emergency Response Plan Booklet for 1985-1986 Which Contains Consolidated Util & County of San Luis Obispo Comments.Primary Booklet Distribution to Residences & Businesses Will Begin on 850930.W/o Encl ML20136B8341985-09-0909 September 1985 Advises That 1985 Facility Dress Rehearsal Will Be Held on 850927.Participants Will Include Util,County of San Luis Obispo & State of Ca.Participants at Emergency Response Facilities & Field Monitoring Teams Will Start in-place ML20136B5151985-09-0909 September 1985 Advises That 1985 Facility Dress Rehearsal Will Be Held on 850927.Participants Will Include Util,County of San Luis Obispo & State of Ca.Participants at Emergency Response Facilities & Field Monitoring Teams Will Start in-place ML20128E4391985-06-19019 June 1985 Forwards Resolution 5684 Urging State Legislature to Hold Public Hearings Re Storage of Radwaste at Facility.Served on 850703 ML20127C9921985-06-12012 June 1985 Lists Comments Re Draft Order 85-101 Concerning Waste Discharge Requirements for Facilities ML20100D7501985-03-28028 March 1985 Forwards Thermal Effects Monitoring Program,1984 Annual Rept & Progress Rept for 1984 Heat Treatment Optimization Studies for Marine Biofouling Control.Impingement & Entrainment for 1985 Will Be in 1985 Progress Rept ML20100K2241984-11-26026 November 1984 Summarizes 841124 Malfunction of Turbine Control Sys Resulting in Opening of 10 to 35% Steam Dumps Due to Sudden Load Rejection.Safety Injection Signal Caused ECCS to Initiate & Discharge to RCS ML20082E2891983-11-17017 November 1983 Forwards Incomplete List of Citizen Questions Re Rev 1 to Emergency Plan.Timely Response Urged ML20024E0641983-08-0303 August 1983 Forwards Signed & Notarized Verification Statement for Idvp Responses to Second Set of Interrogatories.Related Correspondence ML20085E3071983-07-27027 July 1983 Forwards Independent Design Verification Program Response to State of CA Second Set of Interrogatories ML20072B8831983-03-0202 March 1983 Forwards Revised Tables Consisting of NPDES Data,Including Heavy Metal Analysis Results,Inadvertently Omitted from Annual Rept ML20070U9821983-01-28028 January 1983 Forwards Annual Summary Rept on Monitoring & Reporting Program at Diablo Canyon Power Plant During 1982 & Thermal Effects Monitoring Program 1982 Annual Rept,Diablo Canyon Power Plant ML20063E4391982-07-0808 July 1982 Lists Results of Util Review of BNL Final Rept, Independent Seismic Evaluation of Diablo Canyon Unit 1 Containment Annulus Structure & Selected Piping Sys. Use of up-to-date Info Would Obviate Instances of Disagreement ML20054L7391982-06-30030 June 1982 Requests Conformance W/Addressing & Transmitting of Independent Design Verification Program Semimonthly Rept ML20051H4081982-05-11011 May 1982 Requests That R Hubbard Contact Teledyne Re Meeting on Status of Independent Review of Plants ML20051H3421982-05-11011 May 1982 Requests That R Hubbard Contact Rf Reedy,Inc to Arrange Meeting on Status of Independent Review of Project ML20039F8531982-01-0404 January 1982 Requests Investigation of San Luis Obispo County Nuclear Power Plant Emergency Response Plan.Partial Plan Currently Available for Public Comment Does Not Assure Public Safety & Should Not Be Approved ML20039E3631981-12-24024 December 1981 Requests Insp Rept Carried Out Under Condition 2 of Nuclear Energy Liability Policy for Facilities.Opposes Licensing ML20039D1601981-12-0808 December 1981 Requests Info Re Influence of Plant on Util Request for billion-dollar Rate Increase Pending Before Public Util Commission of CA ML20116B5451981-10-21021 October 1981 Forwards Draft Preliminary Rept on Design Interface Review of Seismic Reverification Program ML20039E4631981-10-20020 October 1981 Supports Licensing of Facilities ML20010E3971981-08-27027 August 1981 Advises That Applicant Responses to First Set of Interrogatories Must Be Served No Later than 810902. Extension Until 810919 Denied Due to Inability to Compromise W/Intervenors.W/Certificate of Svc.Related Correspondence ML20009H0481981-05-26026 May 1981 Ack Receipt of Ltr of Protest Re Facility.Operational Licensing Matter Currently Before NRC ML20151Z9771981-04-29029 April 1981 Opposes Licensing of Plant Due to Site Only 2 1/2 Miles from Earthquake Fault ML19347E2461981-03-30030 March 1981 Ack Receipt of Ltr Re Facilities.Ltr Has Been Forwarded to Nrc,Ofc of Congressional Affairs for Response ML18086B6961981-03-26026 March 1981 Ack Receipt of Recent Correspondence Re Licensing of Facilities.Formal Response & Clarification of Issues Forthcoming ML18086B6981981-03-20020 March 1981 Supports Licensing of Facilities ML19289F6561979-05-0101 May 1979 Requests That CA Public Utils Commission Withhold Issuance of Certificate of Necessity for Plant Until Santa Barbara County Can Devise Emergency Evacuation Plan ML20062H2141979-04-0202 April 1979 Opposes Nuclear Facility Const 1997-09-10 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML20006F6411989-08-11011 August 1989
[Table view]Summarizes 890808-10 Meeting in Rockville,Md Re Diablo Canyon Nuclear Power Plant DCL-87-121, Forwards Addl Info Re Application for State of Nv Site User Permit for Beatty,Nv Low Level Waste Disposal Site, Including Clarification Re Util Radwaste Processing, Indemnification Agreement & Procedures1987-05-28028 May 1987 Forwards Addl Info Re Application for State of Nv Site User Permit for Beatty,Nv Low Level Waste Disposal Site, Including Clarification Re Util Radwaste Processing, Indemnification Agreement & Procedures ML20211A1661987-02-12012 February 1987 Requests All Documents in Possession of Pg&E,Consultants, Contractors or Agents Re Addl Parametric Studies Conducted for Facility High Density Racks.Related Correspondence ML20207M8801987-01-0505 January 1987 Provides Summary Rept of Unusual Event at Facility,Per Rev 1 to NUREG-0654.On 870102,smoke Discovered in Area of High Pressure Turbine at Unit 1.Caused by Minor Bearing Shaft Seal Leak.Event Did Not Affect Health & Safety of Public ML20212B2341986-12-20020 December 1986 Forwards Rept of Discharge Monitoring at Diablo Canyon Power Plant During Month of Nov 1986 ML20197B3311986-10-23023 October 1986 Requests Reconsideration of Lack of Relevant Response Re Interrogatory 3 Concerning Dissimilar Metal Contact.Util Drawing 439504 Shows Third Dissimilar Metal (SAE 62 Bronze). Certificate of Svc Encl.Related Correspondence ML20210V2491986-10-0101 October 1986 Discusses Request to Reroute Discharge 001N Secondary Effluent from Package Sewage Treatment Plant for Domestic Sewage Only.Rerouting Acceptable Per Discharge Prohibition A.3.Revised Program Encl ML20214P4941986-09-20020 September 1986 Forwards Rept on Discharge Monitoring at Diablo Canyon Power Plant During Month of Aug 1986 DCL-86-235, Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 8701311986-08-12012 August 1986 Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 870131 ML20198J1141986-05-23023 May 1986 Forwards Rev to Radioactive Effluent Release Data for 1984, Per 860422 Request for Review.Rept Data Only Covers Last Half 1984 ML20203P5831986-05-0101 May 1986 Forwards Diablo Canyon Power Plant 316(b) Cooling Water Intake Assessment,1985 Annual Rept & Thermal Effects Monitoring Program,1985 Annual Rept, Per Provision D.4 NPDES Permit CA0003751 ML20203G0511986-04-20020 April 1986 Forwards Rept on Discharge Monitoring at Diablo Canyon Power Plant During Month of Mar 1986 ML20137N3871986-01-27027 January 1986 Advises That on 860126,earthquake Detected by Seismic Instrumentation Sys & Felt by Control Room Personnel. Emergency Notifications initiated.Post-earthquake Walkdown & Insp Determined That No Damage Occurred ML20136B7371985-10-0303 October 1985 Forwards Facility Emergency Response Plan Booklet for 1985-1986 Which Contains Consolidated Util & County of San Luis Obispo Comments.Primary Booklet Distribution to Residences & Businesses Will Begin on 850930.W/o Encl ML20136B5151985-09-0909 September 1985 Advises That 1985 Facility Dress Rehearsal Will Be Held on 850927.Participants Will Include Util,County of San Luis Obispo & State of Ca.Participants at Emergency Response Facilities & Field Monitoring Teams Will Start in-place ML20136B8341985-09-0909 September 1985 Advises That 1985 Facility Dress Rehearsal Will Be Held on 850927.Participants Will Include Util,County of San Luis Obispo & State of Ca.Participants at Emergency Response Facilities & Field Monitoring Teams Will Start in-place ML20128E4391985-06-19019 June 1985 Forwards Resolution 5684 Urging State Legislature to Hold Public Hearings Re Storage of Radwaste at Facility.Served on 850703 ML20127C9921985-06-12012 June 1985 Lists Comments Re Draft Order 85-101 Concerning Waste Discharge Requirements for Facilities ML20100D7501985-03-28028 March 1985 Forwards Thermal Effects Monitoring Program,1984 Annual Rept & Progress Rept for 1984 Heat Treatment Optimization Studies for Marine Biofouling Control.Impingement & Entrainment for 1985 Will Be in 1985 Progress Rept ML20100K2241984-11-26026 November 1984 Summarizes 841124 Malfunction of Turbine Control Sys Resulting in Opening of 10 to 35% Steam Dumps Due to Sudden Load Rejection.Safety Injection Signal Caused ECCS to Initiate & Discharge to RCS ML20082E2891983-11-17017 November 1983 Forwards Incomplete List of Citizen Questions Re Rev 1 to Emergency Plan.Timely Response Urged ML20024E0641983-08-0303 August 1983 Forwards Signed & Notarized Verification Statement for Idvp Responses to Second Set of Interrogatories.Related Correspondence ML20085E3071983-07-27027 July 1983 Forwards Independent Design Verification Program Response to State of CA Second Set of Interrogatories ML20072B8831983-03-0202 March 1983 Forwards Revised Tables Consisting of NPDES Data,Including Heavy Metal Analysis Results,Inadvertently Omitted from Annual Rept ML20070U9821983-01-28028 January 1983 Forwards Annual Summary Rept on Monitoring & Reporting Program at Diablo Canyon Power Plant During 1982 & Thermal Effects Monitoring Program 1982 Annual Rept,Diablo Canyon Power Plant ML20063E4391982-07-0808 July 1982 Lists Results of Util Review of BNL Final Rept, Independent Seismic Evaluation of Diablo Canyon Unit 1 Containment Annulus Structure & Selected Piping Sys. Use of up-to-date Info Would Obviate Instances of Disagreement ML20054L7391982-06-30030 June 1982 Requests Conformance W/Addressing & Transmitting of Independent Design Verification Program Semimonthly Rept ML20051H4081982-05-11011 May 1982 Requests That R Hubbard Contact Teledyne Re Meeting on Status of Independent Review of Plants ML20051H3421982-05-11011 May 1982 Requests That R Hubbard Contact Rf Reedy,Inc to Arrange Meeting on Status of Independent Review of Project ML20039F8531982-01-0404 January 1982 Requests Investigation of San Luis Obispo County Nuclear Power Plant Emergency Response Plan.Partial Plan Currently Available for Public Comment Does Not Assure Public Safety & Should Not Be Approved ML20039E3631981-12-24024 December 1981 Requests Insp Rept Carried Out Under Condition 2 of Nuclear Energy Liability Policy for Facilities.Opposes Licensing ML20039D1601981-12-0808 December 1981 Requests Info Re Influence of Plant on Util Request for billion-dollar Rate Increase Pending Before Public Util Commission of CA ML20116B5451981-10-21021 October 1981 Forwards Draft Preliminary Rept on Design Interface Review of Seismic Reverification Program ML20039E4631981-10-20020 October 1981 Supports Licensing of Facilities ML20010E3971981-08-27027 August 1981 Advises That Applicant Responses to First Set of Interrogatories Must Be Served No Later than 810902. Extension Until 810919 Denied Due to Inability to Compromise W/Intervenors.W/Certificate of Svc.Related Correspondence ML20009H0481981-05-26026 May 1981 Ack Receipt of Ltr of Protest Re Facility.Operational Licensing Matter Currently Before NRC ML20151Z9771981-04-29029 April 1981 Opposes Licensing of Plant Due to Site Only 2 1/2 Miles from Earthquake Fault ML19347E2461981-03-30030 March 1981 Ack Receipt of Ltr Re Facilities.Ltr Has Been Forwarded to Nrc,Ofc of Congressional Affairs for Response ML18086B6961981-03-26026 March 1981 Ack Receipt of Recent Correspondence Re Licensing of Facilities.Formal Response & Clarification of Issues Forthcoming ML18086B6981981-03-20020 March 1981 Supports Licensing of Facilities ML20003D3591981-02-18018 February 1981 Comments on NRC Performance Re French Nuclear Industry Plan ML19289F6561979-05-0101 May 1979 Requests That CA Public Utils Commission Withhold Issuance of Certificate of Necessity for Plant Until Santa Barbara County Can Devise Emergency Evacuation Plan ML20062H2141979-04-0202 April 1979 Opposes Nuclear Facility Const ML19259C3871979-03-23023 March 1979 Forwards Constituent Ltr Re Facility Const Near Geologic Fault.Requests Any Info Dealing W/Matter ML20062H2101979-03-18018 March 1979 Expresses Concern Re Reactor Const Near Active Geologic Fault ML19283B6161979-01-31031 January 1979 Confirms 790207 Deposition of R Carstens,Changing 790104 Notice,To Continue Day to Day Until Completed ML19270F4561979-01-16016 January 1979 Confirms Time,Place & Date to Take Deposition of Ron Carstens ML20062F4361978-11-22022 November 1978 Forwards for Dept of Energy Response,A Memo Re an Inquiry by G Burns Into Who Inspects the Structural Steel of the Subj Facil ML20148J1541978-10-21021 October 1978 Expresses Concern Over Role of Nuc Energy in Us Energy Prog, Suggests More Res Be Directed Towards Solar Energy. Deplores Liquid Metal Breeder Reactor & the Idea of Siting a Plant on the James River Near Her Home ML20214U2961977-10-14014 October 1977 Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested 1989-08-11 |
Text
-
e.*
Bl~LLOWERY WASHINGTON Ot'PICE:
1 z::i i l..oNcawoRTH HouS1C Of"P'1cE eun..o1Hca WASHINGTON, 0.C. 2.0515 (2.02.) 225'-32.0 t .
BANK.ING, FINANCE ANO URBAN AFl'"AIRS Mr. George E. Kidd, Fellow The American Society of .Mechanical Engineers 1362 Rodeo Drive La Jolla, California 92137
Dear Mr. Kidd:
Thank you for your recent correspondence regarding the licensing of Diablo Canyon NucleaJ:: Station*. I appreciate the time you have taken to share your concern~ with.me.
Your interest in this matter is certainly understandable. I have taken the liberty of forwarding your inquiry to Carlton Kammerer, Director of the Office of congressional Affairs of the Nuclear Regulatory Commission for a formal response and a clarification of the issues involved. You may be assured that I will contact you as soon as possible upon receipt of the agency's reply.
Again, thank. you for bringing thi*s situation to my attention.
Sincerely, -
BILL LOWERY Member of Congress BL:plh cc: Carlton Kammerer J