UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 9 License No. DPR-75
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Elec~ric Company, Delmarva Power And.
Light Company and Atlantic City Electric Company (the licensees) dated May 28, 1982 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in comformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance With 10 CFR Part 51 of the Commission's regulations and all appl.icable requirements have been satisfied.
8207200021 820708 PDR ADOCK 05000311 P
\\
- 2~ Accordingly, paragraph 2.C.(25)(h)(v) is hereby amended to read as follows:
(v)
Noble gas effluent from each potential release point from normal concentrations up to 105 uCi/cc (Xe-133) no later than prior to startup following the first refueling outage.
PSE&G shall provide the capability to continuously sample gaseous effiuents and analyze these samples no later than prior to startup following the first refueling outage.
Until the above installation is completed, PSE&G shall use interim monitoring procedures and equipment.
- 3.
This license amendment is of its issuance.
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 8, 1982
- 1
ATTACHMENT TO LICENSE AMENDMENT NO. 9
~ACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise License No. DPR-75 as follows:
Remove Page 19 Insert Page 19
(g) Containment Isolation Dependability (Section 22.3, 11.E.4.2)
(i)
PSE&G shall reduce the containment setpoint pressure that initiates containment isolation for nonessential penetrations to the minimum compatible with normal operating conditions no later than July 1, 1981.
(ii)
PSE&G shall install a high radiation isolation signal on the containment purge and vent isola-tion valves no later than July 1, 1981.
(h)
Additional Accident Monitoring Instrumentation (Section 22.3, 11.F.l)
PSE&G shall install and demonstrate the operability of instruments for continuous indication in the control room of the following variables.
Each item shall be completed by the specified date in the condition:
(i) Containment pressure from minus five psig to three times the design pressure of the containment no later than January 1, 1982; (ii) Containment water level from (i) the bottom to the top of the containment sump, and (ii) the bottom of the containment to an elevation equivalent to a 600,000 gallon capacity no later than July 1, 1981; (iii) Containment atmosphere hydrogen concentration 2.C(25)(h)(iv) from 0 to 10 volume percent no later than January 1, 1982;
- Containment gamna radiation up-to 107 rad/hr;_ at the first outage of sufficient duration but no 1_ater than prior to startup following the first refueling outage; and 2.C(2S)(h)(v)
Noble gas effluent from ~ach* po.tential release point frm nonnal concen-.-
trations to 10SuCi/cc*(xe-133"}. at the first.outage of.sufficient duration
- 1. but no later than prior to startup foll owing the first refueling outage.
PSE&G shall provide the capability to continu.ously sample gaseous effluents a!,ld analyze. these samples no later* th~n.Prior t!Jstar~upfoffowingthe ___ _
f~rst refueling outage.
Until the* above installation is complete, PSE&G shall use interim monitoring procedufes and equipment.
Amendinent No. 9 I