ML18086B151
| ML18086B151 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 12/15/1981 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18086B149 | List: |
| References | |
| NUDOCS 8112290054 | |
| Download: ML18086B151 (3) | |
Text
- c UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-311 PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY, DELMARVA POWER AND LIGHT COMPANY, AND ATLANTIC CITY ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE 7590-0*1 The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 3 to Facility Operating License No. DPR-75, issued to Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees),
which revised Technical Specifications for operation of the Salem Nuclear Generating Station, Unit No. 2 (the facility) located in Salem County, New Jersey.
The amendment is effective as of November 9, 1981.
The amendment was authorized by telephone on November 9, 1981 and was confirmed by letter on the same date. The amendment changes an Action Statement for the Emergency Core Cooling Systems to permit an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to complete repairs to No. 22 Charging Pump and, upon satisfactory verification of pump characteristics, permits the required flow balance.testing to be conducted during the next time the unit is in COLD SHUTDOWN.
The amendment was authorized on an expedited basis to maintain the p1ant at a steady-state condition and avoid a shutdown transient shown by our evaluation to be unnecessary but required by Technical Specifications unless amended.
81122900548112151 PDR ADOCK 05000311 I p
PDR 1
-c 7590-01 The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),.and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations.
in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR §51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection *With issuance of this amendment.
For further detai 1 s with respect to this action, see ( 1) the request for amendment dated November 9, 1981, as confinned by letters dated November 9, 1981 and November 18, 1981, (2) the Commission's letter dated November 9, 1981.,
authorizing the Technical Specification change, (3) Amendment No. 3 to License No. DPR-75, and (4) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C. and at the Salem Free Public Library, 112 West Broadway, Salem, New Jersey.
A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C, 20555, Attention:
Director, Division of Licensing:
- 7590-01 3 -
Dated at Bethesda, Maryland, this 15th day of December, 1981.
~HE N~C 1
AR ~GUL~TORY COMMISSION lJ\\cLLtt
(,]*a~~
Steven A.
arg, Chi f
'Operating Reactors,B anch #1 Division of Li cens1\\