ML18086A990
| ML18086A990 | |
| Person / Time | |
|---|---|
| Site: | Salem (DPR-75-A-002, DPR-75-A-2) |
| Issue date: | 10/15/1981 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18086A991 | List: |
| References | |
| NUDOCS 8111030677 | |
| Download: ML18086A990 (4) | |
Text
.:...._. --~--...-::-h. __ *--
.. -. -- _....... -. -..,.: ____..:;.,__ **-'--*~-
~.:.,. *--*--**. *-*- --
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PUBLIC SERVICE ELECTRIC AND GAS COMPANY "PHILADELPHIA" ELECTRIC* COMPANY
- DELMARVA.POWER AND.LIGHT COMPANY
- 'ATLANTic*ctTV AND ELECTRIC COMPANY DOCKET NO.
50~311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2
. AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 2 License No. DPR-75
- 1. The Nuclear Regulatory CoJ1111ission (the Commission) has found that:.
A.
The application for amendment by Public Service Electric and Gas Company, Phi 1ade1 phi a Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated September 23, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility.will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comnission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted im compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the corrmon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 mf the Comnission's regulations and all applicable requirements..
have been satisfied.
( Wt~ 1030617 01101 s 1 p ADOCK 05000311 PDR
. -----.. ------;-*--------~~-
.. ~
.. ~-..
---:-~
-~**-----*.--_,-.,....,...-,.,-.....,.,.,.,.~
._.: __.:~~--***--
-*~:.. __,_. __...;.*.:..... --~-.. ;:..._. ~ ___._-.: ____,_..;,,_._*_~~~----"-*..... _..... *:..-.. ***-* ******-** -**-* *-*~-.
r
_, -~,
I.
-~-
-2~,
. 2., Accordingly~ the 1 icense is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2)' of Facility Operating License.
No. DPR-75 is hereby amended to read as follows:
(2) ~ Technical Spet:ifications
- The Technical.Specifications contained in Appendices A and B, as 'revised through Amendment No. 2s are'
. hereby incorporated in the 1 icense. The 1 icensee shall operate the facility in accordance with the Techn i ca 1 _ Speci fkat ions.
- 3. T.hiiS license amendment is effective as of the date of its issuance.
Attachment:
Changes to the Techni ca 1 Specifications-Date of Issuance:
October 15, 1981
-~----"'*-"" -~-----:.-:... -.::. ~-*--* - -,.:.,:
- ATTACHMENT TO LICENSE AMENDMENT N0.1 2 FACILITY OPERATING LICENSE NO*~ DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:
Remove Page *
' 3/4 6-9
.Insert *Page 3/4 6-9
~ -----;---:::-_=~----*--- **
- -*-.**--*-***~--*--* *.... * ---**-n*-~ *****--* * -** -
- CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR.OPERATION 3.6. l."7 The containment purge supply and exhaust isolation valves:i1r shall be closed.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With one containment purge supply and/or exhaust isolation valve open, close the open valve(s) within one hour or be in at least HOT STANDBY within the neXt 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and *in COLD SHUTDOWN within the fo 11 owing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.1.7 The containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.
- the containment pressure-vacuum relief isolation valves may be opened on an intermittent basis, under administrative control, -as necessary to satisfy I
the :requirement of Specification 3.6.l.4.
SALEM - UNIT 2 3/4 6-9 Amendment No. 2 i
J i---------. -;----------. ---~-~-----~--------- --- --- -- --. ------------ ---*----------* *- -----*-----*-** ----*---;--*----------*--~-~ ~