ML18086A971
| ML18086A971 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/02/1981 |
| From: | Liden E Public Service Enterprise Group |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8110210284 | |
| Download: ML18086A971 (2) | |
Text
e OPS~G Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 P.O. Box 570 October 2, 1981 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention:
Mr. Steven A. Varga, Chief Operating Reactors Branch 1 Division of Licensing Gentlemen:
AUXILIARY FEEDWATER SYSTEM RELIABILITY UNIT NOS. 1 AND 2 SALEM NUCLEAR GENERATING STATION DOCKET NOS. 50-272 AND 50-311 Your letter of September 17, 1981 requested PSE&G to provide a commitment and schedule for resolving two concerns related to Auxiliary Feedwater System Reliability for Unit 1.
The first concern, availability of the spool piece for lin-ing up the Service Water System as a backup auxiliary feed-water supply in the event of a tornado, has alieady been re-solved for Unit 1 by modifying plant procedures to require spool piece installation in the event of a tornado warning.
A surveillance requirement will be placed in the Unit 1 Technical Specification to require that the spool piece be verified as onsite once per twelve months.
For the second concern, PSE&G commits to install a control grade automatic low-suction pressure trip for each auxiliary feedwater pump, during the 1982 refueling outage of Unit 1.
8110210284 911002 PDR ADOCK 05000272 )pie P
PDR 95-0942
Director of Nuclear Reactor Regulation 10/2/81 Should you have any questions in this regard, do not hesi-tate to contact us.
Very truly yours,
',q;;i: *:/. -,, '
/ /._, r 1:.-1--*tL---'---
\\,,,.--
/E. A. Liden
/
Manager - Nuclear Licensing FM:gs CC:
Mr. Leif N6rrholm Senior Resident Inspector GTll 1/2