MEMORANDUM FOR:
Steven A. Varga, Chief, Operating Reactors Branch #1, DL FROM:
G. C. Meyer, Project Manager, Operating Reacto1'!S Branch #1, DL
SUBJECT:
FORTHCOMING MEETING HITM PUBLIC SERVICE ELECTRIC AND GAS COMPANY" RELATED TO SALEM UNITS 1 AND 2 Date and Ti me:
niu:rs~d.ay!~:',. October 15-, 1981
- 10:00 a.m.
[ocation:
Phillips Building Room 436
Purpose:
To preview the planned organizational changes related to the management of Salem Units 1 and 2 P.arHtl4:pants:
NRC Requested Participants G. C. Meyer L. Crocker ORIGINAL S!G'ITT!!D PSE&G J. Zupko, et al G. C. Meyer, Project Manager Operating Reactor.s Branch #1, DL
~~~
05a01101a I
'p_
00272
~~..,..._--..,..._~..,...-~---.i.::_PDR~~~-.-~~~..,..._..,..._..,..._~~~-.,.-~~~~-.-~~~~--.~~~~~
ORB#l:DL OFFICE~ **~(\\'
- er*ds SURNAME!f.......... :.........
I DATE~ *.J.~/.t,;./.~.1......
_ NBC-FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
L MEETING NOT! CE OPERATING REACTORS BRANCH NO. l DIVISION OF LICENSING DISTRIBUTION Docket File NRC PDR Local PDR ORB No. l Rdg File J. Olshinski e.
B. Grimes (Eme~gency Preparedness)
S. Varga Project Manager OELD I &E ( 3)
Receptionist NRC Participants NSIC TERA ACRS (10)
/
-~---
SEP 11 '\\99~
MEMORANDUM FOR:
Steven A. Varga, Chief~
Division of Licensing FROM:
Olan D. Parr, Chief, Auxiliary Systems Branch Division of Systems Integration
SUBJECT:
SALEM AUXILIARY FEEDli!ATER SYSTEM RELIABILITY Supplement 5 to the Salem Unit 2 Safety Evaluation Report identified the following concerns related to the auxiliary feedwater (AHJ) system reliability:
(l) Availability of the spool piece for lining up the service water system to supply AHJ during and right after a tornado; and (2) Time available for operator action to prevent pump damage in the event of tornado-induced loss of suction to the AFW pumps.
In response to the first concern, PSE&G modified plant procedures to require spool piece installation in the event of a tornado warning and a Sl!rveillance requirement was placed in the Unit 2 Technical Specifications to require that the spool piece be verified as on-site once per 12 months.
For the second concern, PSE&G committed, to install in Unit 2 an automatic low suction pressure t.rip for each AFW pump. This modification is to be installed during the ~irst refueling outage.
The above concerns apply to Salem Unit l also. It is therefore our position that the licensee should implement the above procedural changes and modifications for Salem Unit l.
cc:
R. Lobel G. Meyer Olan D. Parr, Chief Auxiliary Systems Branch Division of Systems Integration DISTRIBUTION:
Central File ASB Reading File
Contact:
- o. Parr B. Mann f8109230785 8109~'.
B. Mann X27065 I CF ADOCK 05000~f2 R. Lobe 1 OFFICE~.* A?.~l.P.?.L........... ~~~!.P.?J.........A.s.a..~s.x..................................................................................................
suRNAMEtl-
- 8.M9..nn;.c.t.~J(.~.... Rl..9.b.~J.~~/, &:-: *** 0~~~1'412.r................................................................................................