ML18086A939

From kanterella
Jump to navigation Jump to search
Commits to Use of Four Criteria for Acceptable Turbine Disc Insp Schedule Listed in NRC 810821 Safety Evaluation
ML18086A939
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/22/1981
From: Schneider F
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8109290345
Download: ML18086A939 (1)


Text

~--**

Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/430-7373 Production Director Nuclear Reactor Division Nuclear Regulatory Commission Washington, D.C.

20555 September 22, 1981 Attention:

Mr. Steven A. Varga Chief, Operating Reactors Branch No. 1 Division of Licensing Gentlemen:

TURBINE DISC INSPECTIONS NO. 1 AND 2 UNITS SALEM NUCLEAR GENERATING STATION DOCKET NOS. 50-272 AND 50-311 With reference to your August 21, 1981 letter, we have reviewed the four criteria for an acceptable Turbine Disc Inspection Schedule listed in the Safety Evaluation report attached to the letter.

We hereby commit to use the four criteria for scheduling future disc inspections at Salem.Units 1 and 2.

The Westinghouse letter of September 14, 1981 confirms that the initial inspection of the Salem Unit No. 2 Rotor Discs can take place in five years; however, in conformance with license con-dition 2.C(l7), "Turbine Inspection~~ of Facility Operating License No. DPR-75 for Salem No. 2 Unit, we will inspect the rotor discs at or befor~ the second refueling.

Sincerely,

( ~f,~9~0900345 810922 --.,_\\

I G CK 05000272 :

PDR