e 0 PS~G Public Service Electric and Gas Company 80 Park Plaza, T16D Newark, N.J. 07101 201/430-8217 Robert L. Mitt!
General Manager - Licensing and Environment Ref. LCR 81-14 July 10; 1981 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfork Avenue Bethesda; MD 20014 Attention: Mr. Frank J. Miraglia; Chief Licensing Branch 3 Division of Licensing Gentlemen:
LICENSE CHANGE REQUEST 81-14 FACILITY OPERATING LICENSE DPR-75 NO. 2 UNIT SALEM NUCLEAR GENERATING STATION In accordance with the Atanic Energy Act of 1954; as amended, and the regulations thereunder; PSE&G hereby requests amendment of Facility Operating License DPR-75 for the Salem Nuclear Generating Station; Unit No. 2.
Paragraph 2.c(lO) of Facility Operating License DPR-75 requires canple-tion of certain activities related to Fire Protection by specified dates.
During the performance of the review; engineering verification and cable wrapping required in paragraphs 2.c(l0)(d)(l2); 2.c(lO}(f} and 2.c(lO)(h);
it has been determined that we may be unable to meet the canpletion dates specified.
The review time has been lengthened due to consideration of new criteria identified as a result of the staff's recent site review (reference SSER No. 6).
We have undertaken a canplete review of the fire protection analysis for the purpose of providing a clear; concise report for your review.
This effort involves preparation of approximately 190 new drawings for the report, which covers both Salem 1 and 2. Additionally; the review time has been sanewhat lengthened as a result of limited J
plant access during field checks due to operation of the Salem units. I \\ "
.µ C"t.C,.oo
(!Joa\\
l 'I I/ 8107160329 810710 PPDR ADOCK 05000311 I
PDR l
s '\\'
U.S. Nuclear Regulatory Corrrrnission 7/10/81 While we are making every effort to meet the completion dates specified in paragraphs 2.c(l0)(d)(l2) and 2.c(lO)(f)~ VJe request that these dates be extended as a contingency to provide for.any additional cor-rective actions that could develop during the final stages of our review.
Such corrective actions could impact the cable wrap completion date specified in paragraph 2.c(lO)(h). Specifically, it is requested that the subject paragraphs of Facility Operating License DPR-75 be amended as follows:
2.c(lO) (d) (12) 2.c(lO)(f) 2.c(lO)(h)
PSE&G shall review its Fire Interaction analysis for any additional areas impacted by the assumptions and criteria identified in the NRC review team's report as being inconsistently applied or with which the team did not concur.
PSE&G shall report the results of this review to the NRC by July 31, 19811 and complete all additional corrective actions by August 15, 1981.
By July 31, 1981, PSE&G shall complete final engineering verification of the fire protection analysis and corrective actions.
Prior to August 15~ 1981, PSE&G shall complete all required cable wrapping.
An extension of the completion dates specified herein causes no undue risk to the health and safety of the public~ in that the review and verification activities involved are confi:rmatory in nature, and any additional corrective actions resulting from these activities would serve to further enhance Salem fire protection capabilities.
This request is administrative in nature and has no safety or environ-mental significance, and is therefore dete:rmined to be a Class II amendment as defined in 10 CFR 170.22e A check in the amount of
$1,200.00 is enclosed.
This submittal consists of three (3) signed originals and forty (40) copies.
Very truly yours~
Enclosures CC Mr. Leif Norrholm Senior Resident Inspector
Ref.
LCR-81-14 U.S. NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-311 PUBLIC SERVICE ELECTRIC AND GAS COMPANY FACILITY OPERATING LICENSE NO. DPR-85 NO. 2 UNIT SALEM GENERATING STATION Public Service Electric and Gas Company hereby submits proposed changes to Facility Operating License No. DPR-75 for Salem Generating Station, Unit No. 2.
This change request relates to License requirements for review of Fire Protection System by specific dates.
Respectfully submitted, PUBLIC SERVICE ELECTRIC AND GAS COMPANY By: ~0..;;l.Jw FREDERICK W. SCHNEIDER VICE PRESIDENT
Ref. LCR 81-14 STATE OF NEW JERSEY)
)
SS:
COUNTY OF ESSEX
)
FREDERICK w. SCHNEIDER, being duly sworn according to law deposes and says:
I am a Vice President of Public Service Electric and Gas Company, and as s*uch, I am fully familiar with the matters set forth in License Cha;nge :Request 81-14, dated July 10, 1981, for Facility L;i::cense No. DP:R,-75, which matters are true to the best of my knowledge, informati.on and belief.
~LU~*
- ~*.:<****~
REDBRICK W.~CH EIDER Subscribed and sworn to befo;r:e me th:l's }i.j-Jl!. da,y of~* *
,1981
.*?~.*~
Public of New Jersey My Commission expires on
Description of Change This change amends paragraph 2.C(lO) of the Facility Operating License.
This paragraph requires completion of certain activities related to Fire Protection by specific dates.
Reason For Change This change is required because it has been determined that we may be unable to meet the completion dates specified.
Safety Evaluation An extension of the completion dates specified herein causes no undue risk to the health and safety of the public, in that the review and verification activities involved are confirmatory in nature.
Basis For* Cl'a*s*si'fication This request is administrative in nature and has no safety or environmental significance, and is therefore determined to be a Class II amendment as defined in 10CFR170.22.