Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/430-7373 Production March 4, 1981
- Mr. Boyce H. Grier, Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region I 631 Park.Avenue King of Prussia, PA 19604 Dear Mr. Grier SUPPLEMENTAL RESPONSE TO NRC IE BULLETIN NO. 80-24 PREVENTION OF DAMAGE DUE TO WATER LEAKAGE
((\\.!
"...-;ff 11'>~
i~at1fro/.
(~ llPR211981s..,~:
\\
U1lt N.lalAR R~T9111 / ~.t
~MMISGIOtt i * ~
";t, INSIDE CONTAINMENT (October 17, 1980 Indian Point 2 Event)
SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 In our January 2, 1981 response to the subject bulletin, we supplied a history of the type of repairs done on our fan cooler system.
This supplemental response provides a short description of the repairs to clarify the specific action taken in each case.
If you have any further questions, we will be pleased to discuss them with you.
Sincerely, Attachment CC U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC 20553
- Page l of 3 The following information is being submitted as a supplement to our initial response to Item le:
Date Action Work Order No.
' oe*s*cripti*on Action
- CompTeted
- 1.
MD-2162
- 11 FCU Motor Cooler Replaced with a spare cooler 9/3/77 Replacement
- 2.
OD-6092
- 14 FCU Moto;r Cooler Repaired Cooler 12/3/77 Repair
- 3.
MD-2319
- 13 FCU Motor Cooler Replaced with a spare cooler 12/6/77 Repair
- 4.
OP-0146
- 15 FCU Motor Cooler Replaced with a spare cooler 11/2/77 Repair
- 5.
MD-2315
- 13 FCU Motor Cooler Replaced with a spare cooler 11/3/77 Repair
- 6.
MD-2895
- 11 FCU Motor Cooler Welded copper nozzles to 8/4/78 RepaiI;"
carbon steel coupling and hydrostatically tested (ll
- 7.
MD-2948, MD-2949 #11-15 FCU ~pools These work orders dealt with In progress9 OD-10060, the repair o:t: spool pieces OP-903796 and flanges on 11-15 FCU's
- 8.
OD-10158
- 14 FCU Motor Cooler Replaced with a spare cooler 9/1/78 Repair
- 9.
MD-903366
- 12 FCU Motor Repair Cooler Replaced with a spare cooler 4,!12/80
- 10.
MD-905965
- 11.
MD-916898
- 11 FCU Repair Motor Cooler Replaced with a spare cooler 9/5/79
Work Order No.
- 12.
MD-915491
- 13.
OD-932346
- 14.
MD-912685
- 15.
MD-910204
- 16.
MD-936319
- 17.
MD-936324
- 18.
MD-912693
- 19.
MD-910210 Description
- 13 FCU Cooler (Motor)
Repair
- 15 FCU Motor Cooler Repair
- 11 FCU Motor Cooler Repair
- 11 FCU Cooler Coil Replacement
- 11 FCU Motor Cooler Repair Action Replaced with a spare cooler Replaced with a spare cooler Replaced with a spare cooler Coolers were blanked off Replaced with a spare cooler
- 11 FCU Primary Cooler Coil Coolers were blanked off
- 12 FCU Primary Cooler Coil Coolers were blanked off
- 12 FCU Motor Cooler Repair Replaced with a spare cooler
- 14 FCU Primary Cooler Coil Cooler was blanked off
- 14 FCU Secondary Cooler Coil
- 15 FCU Secondary Cooler Coil
- 11 FCU Cooler Leak
- 12 FCU Cooler Leak Cooler was blanked off Cooler was blanked off Replaced with a spare cooler Replaced with a spare cooler Page 2 of 3 Date Action Completed 10/23/79 6/11/80 7/8/80 9/3/80 9/11/80 9/11/80 8/2/80 8/8/80 8/11/80 9/9/80 11/24/80 12/24/80
_ ___J
Descripti*on
- 20.
MD-911696
- 14 FCU Cooler Leak
- 21.
MD-910187
- 15 FCU Cooler Leak NOTES:
(1)
Cooper nickel to carbon steel welding
- *A:ct;Lon Replaced with a spare cooler Replaced with a spare cooler J?age 3 of 3 Date.Action Completed 12/4/80 10/30/80