MJNTH March 1981.

AVERAGE DAILY UNIT POWER. LEVEL DJCKET NO.

50-272

~~~~~~~~

UNIT Salem 111 DATE April 10, 1981 COMPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

8

... ~

9 10 11 12 13 14 15 16 Pg. 2 of 12 8.1-7.Rl (MWe-NET) 580 0

0 0

0 2

826 1072 1076 1089 1089 1092 1092 1090 1076 1032 (MWE-NET) 17 1025 18 1078 19 1072 20 1063 21 1060 22 1089 23 1083 24 1085 25 1091 26 1083 27 1072 28 206 29 0

30 0

31 0

e OPERATIN; CATA REPORl' QPERAT]N'.; STATOS

l. Unit Nane:

Salem #1 Notes:

2.

Reportinq Period:__.M.w;adr.o!r..i.c...,b~l""'9~8.,l _______ _

3. Licensed 'lllemal. Power (.!+lt):

3338

4.

Nalleplate Rating (Gross M'le):

1135

5.

Design Electrical Rating (Net !<<el :

,'". 10 9 0

6.

Maximum Dependable Capacity "(Gross ?<<el : 112 4

7.

Maximum Dependable Capacity (Net !<<el : _l_-0;..;7...;;9 ___ _

  • e IXX:KE'1' ro. : 5 0-2 72 DM'E : April 10, 1981 CXM?IEm'.) BY: L.K. Miller

'lE!EPl!:NE: 609-365-7000 X507

8.

U Changes Occur in Capacity Ratings (Items NlllICer 3 'Imough 7) Sina! Last Report, Give Reason:

NONE

9.

Power Level To Which Pastricted, U Any (Net ?-fie): _--:N;.:.;O;.::N.:.;:;E.:.._ ________________ _

10.

Bea.sons For Restrictions, If Any:

N/ A ll. I:i:lUrs In Reporting Period

u. NuirCer Of iCurs reactor Was Critical
13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line.

15. Unit Reserve Shutdown Hours
16. Gross 'Ibmnal Energy Generated (l-fiH)
17.

Gross Electrical Energy Generated (mH)

18. Net Elect::rical Energy Generated(Mta)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit capacity Factor (Using MOC Net)
22. Unit capacity Factor (Using DER Net)
23. Unit Forced OIItage Rate

'Ibis M::lnth 744 537.8 89.9 527.2.

o.o 1~854 5791)10 553,416 ZQ..2 70.9 68.9 68.2 29.1 Year to Date 21160 11899.4 89.9 11837.8

.o.o 5.575.'124 1,873.450 1,789,076.

85.1 85.1 76.8 76.0 14.9

24.

Shut:dcwns Scheduled ever Next 6 M:nths (Type, Date, and Duration of Each):

Refueling, 10-3-81. 8 Weeks Clmllative 32~

18.328.4 112.6 17.447.0 o.o

,51,482,951.8 17,019,170 16,097,899 5,,2. 0 53.0

£i5....3.

44.9 3..1..-4.

25.

U Shut Down At End of Report Periodr Estimated Date of Startup: __

4_/_2_6_/8_1_. -------------"----~--

26. Units In Test Status (Prior to camercial Cperation) :

B-l-7.R2 Pg. 3 of 12 INITIAL CRITIC11LITY INITIAL EllX:'I'RicrIY

~

OPERATION Forecast 09/30/76 11/01/7-6 12/20/76 Achieved 12/11/76 12/25/76 06/30!77

m.81-059 81-061 81-063 81-065 81-067 81-071 1

lll\\TE 3/1/81 3/2/81 3/16/81 3/17/81 3/19/81 3/28/81 F1 Forced S1 Scheduled Page -4 of 12 8-1-7.Rl TYPr F

F F

F F

F 2

UNIT Slll111XJ'INS MID PrnER REIU:Troos REPORI' M:UI'H March 1981 ME'l100 OF OOW\\TION SIRJrl'IOO

~

(IDJRS) ln'lN RFJICIUR 11.0 A

3 115.2 B

4 o.o A

5

--.o.o A

5 o.o A

5 90.6 A

1 ieason:

A-Fl::]uiprent Failure(Explain)

&-Maintenance or Test C-Refueling D-Regulator:y Restriction LICENSE EVEN!'

REFORI' I E-q>erator Training

  • License ~ation F-.1\\aninistrative G<perational Error(Explain)

IH>ther (Explain)

SYSTEM

<DfPrnFNl' cm£4 Cl.DES HH PUMP XX CB VESSEL HH FILTER HF PUMP XX A

HC HT EX CH HA TURBIN 3

~thod:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Con*tinuation of Previous Outage Load Reduction 9-0ther DOCKET NO. :_5_0..,..-_2_72~:-----

UNIT !NAME:

Salem Ill DATE: _Ap-=....:r_1_' 1_1_0_,_,_1_9_81 __

COMPLETED BY: L.K. Miller TELEPHONE: 609-365-7000 X507 Cl\\USE 1\\m CDRRECI'IVE N:TION 'IO PREVml'~

/Ill Steam Generator Feed Pump Trip Pressurizer Snubber Inspection Clean /112 Condensate Suction Strainer

/113 Circulating Water Pump Trip While

/113B Condenser Out Of Service For Cleaning ll13B Condenser Tube Leak

/113 Low Pressure Turbine High Vibratio1 4

Exhibit G - Instructions for Preparatioo of Data

&itey Sheets for Licensee Event Report (Lm) File (NURBr.-0161) 5 Exhibit 1-Sane Source I

I

~

r I l

! l

'l j

I I_

I J

t

(

i t i

t l,

i.

\\

i i. I

\\ I

I l

,* MAJOR PLANT MOOIFICA-NS REPORT MONTH March 1981

  • OCR NO.

lED-0308 lEC-0772 lEC-0783 lEC-0914 lEC-0916 lET-0935 lEC-1033 lET-1153 lOD-0042 lSC-0331 PRINCIPLE SYSTEM Met. Tower Auxiliary Feedwater Annunciators Moisture Sepa:r:-ator and Reheater Condensate Polishing Demineralized Water,.*

Radiation Monitoring Reactor Coolant Pressurizer Relief Auxiliary Feedwater

  • DESIGN CHANGE REQUEST 8-1-7. Rl Page 5 of 12 DOCKET NO; 50-272 UNIT N~---S~a-1-e~m~.l-'---~--~-----

DATE :. April 10, 1981 COMP LET En BY :

L. K. Miller


;;;:=.;=.;;;......~~----..,...;;--

TELEPHONE: 609-365-7000 X507 J:

SUBJECT Interface with RMS 1AF94 Hard Pipe Drain Line Add New Acknowledge Button Cut Opening in Shell End Plate, Install Upper Interface Sight Glass Test on Transfer Pump Temporary Dis6onnection of TB21-7*

Test Mechanical Snubbers Install Ladder on Pressurizer Relief Tank Increase Tubing Size

I L

.~OR PLANT MOOIFICATI~

REPORT MONTH March 1981 DOCKET... : _5_0~-~2~7~2~~~~~~

UNIT N Salem Ill

~~~~~~~~~~~~

DATE: ~il 10, 1981 COMPLETED BY:

L.K. Miller TELEPHONE: 609-365-7000 X507

  • DCR NO.

tED-0308 lEC-0772 lEC-0783 lEC-0914 lEC-0916 lET-0935 lEC-1033 lET-1153 lOD-0042 lSC-0331 10CFRS 0. 5 9.

SAFETY EVALUATION This design change is not safety related and does not affect any safety related system.

The design change will preclude possible spraying of water to vital components in the switch gear room and will direct discharge of the AF drain valve to the nearest floor drain.

No unreviewed safety or environ-mental questions are involved.

This is not a safety related change and does not affect safety related equipment.

The installation of internal manways does not involve any changes to safety related components.

These manways are required only for inspection purposes.

This change involves the installation of two additional sight glasses in the condensate polishing system cation regeneration vessel.

This modifi-cation does not involve an unreviewed safety question.

The installation does not constitute a new hazard not pre,viously analyzed.

The modification to this system does not affect previously performed safety analysis, nor does it create any new hazards.

The system is not safety related.

The technical specifications for this system remain the same.

At the occurance. of a 'high flux at shutdown' alarm in the control room, thE operator is to verify the accuracy of it via the source range indicators and/or recorder.

If it is a radiation problem, the operator in instructed to press the evaluation horn test pushbutton located in the control room.

This DCR does not represent either an unreviewed safety or environmental question.

This DCR is for testing purposes only and does not change any design parameters.

Installation of access ladder to pressurizer relief tank does not affect any previously performed safety analyses.

Does not affect the safe operation of the plant, and does not constitute an unreviwed safety ques-tion.

The intent of the design change is to improve system performance.

A functional change to this system is not involved.

(

Page 6 of 12 nF~TGN CHA.i.~GE REQUEST

r-*------------ --

0

  • I I

I

1.

. I

.- i '

r *\\-!

i 'f- -SORHD-BY MAR 31 '\\981 SALEM GENF.RArTNG STATION OEPARl~ENT, WORK ORDER Nn.

SAFETY MFLAlED EQUTPMENT wnMK nRDER LOG i *I WORK nRl)ER Unit 1

  • i'.1 NUMBER DEPT EQUIPMENT IOENTIFICATlON
,i

110647 M

VALVE, r3MSl67 DESCRIPTION OF PROBLEM,

CAUSE,

~

CQRRECTIVF ACTION, ql3583 M

1111 FUEL HANDLING blJILDTNG EXHAUST

.. DESCRIP.J.WN. Of_ PROBLEM,_

CAUSE,

.a l*c; cnRRECTIVE ACTinN,

i[ ____ --

'-* i:J bv q34023 M

PUMP, 15 SERVTCF WATER
.J[

DESCRIPTION nF PRDBLFM, CAUSE.,

CORRECTIVF ACTinN, q34056 M

SPENT FUEL PIT

  • **I DESCRIPTION OF PROBLEM, C II USE, cnRRECTTVF ACTION,

'142714 M

Pll"!P, 12 flflRIC ACTll TRANSFER DESCRIPTTUN OF PRO~LE~

  • Page 7 of 12 IW EXPLANATION nF wnRK PERFORMED ERRATIC OUTPUT
  • EAUL TY PILOl*DPERUED SOLENUill REPLACED SOLFNOID

.STARJING. UNIL DOES.ROT.DE'°ENERGIZE

>LOW*FLOW> ALARM FAUL TY FLOW DEVICES.AND BEL TS REPLACED FLOW DEVICES AND INSTALLtD 4 NEW BELTS WATER LEAK INTO OIL COOLER LEAK REPLACED FITTINGS ON SW COOLER PIT IS LFAKING HOLES JN PTT MACHINED 4 PLATES TO BF. 1.ISFD TO PATCH OVER HULES MUI SY 0001

Ill I

\\_SORTED HY SALEM GENFRATI~G STATION MAR nEPARTMENf, WORK OROEN Nn.

SAFETY RFLATED ErlUTPMENT WONK nRnER L!lG

. /I.

~

e WORK IJRDER NUMBER q44579 q447p.9 OEPT

.M M

Page 8 of 12 EQUIPMENT IDENTTFTCATION EXPLANATION OF WORK PERFORMED CA USE.,

A~ARJNG CAME APART CnRRECTIVF ACTION, REPLACFD liEARING

PIJMP, 11 SERVICE WATER DESCRJPTJON OF PR08LF.M, PUMP WILL NUT RUN
CAUSE, RROKEN CONTROL CONTACTOk CORRE.CTI VE ACT ION, REPLACED CONTACT.QR ____ _

PUMP, 11 SERVICE WATER DESCRIPTION OF PROALfM, BROKEN STRAINER SHEAR PIN

CAUSE, UNKNOWN cnRRECTIVF ACTION, REPLACFI) PH!
VALVE, lbSV/24 DESCRIPT.I.ON OF PROBLEM, LEAKAGE
CAUSE, AArl DIAPHRAM CORRECTIVE ACTION, REPLACED DIAPHRAM
  1. 11 PENETRATION AREA EXHAUST FAN DESCRJPlTON OF PRORLFM, ORJVE AEll~ MISSTNG CAt.JSE, UNKrmwN CORRECTIVE ACTION, REPLACED DRIV~ ~ELTS P ti MP,

1 2 r;H II~ G I NG OESCRTPTlON OF PRORLF~,

PUMP LOS TNr:: OIL

CAUSE, BAD SEATS, bfAAINGS, AND UFFLECTOR RINGS 000?

e e

- -- ------ ---- ------- _______..__...,_.,. __________ ~-----

-~--------

~

41,

4 4

],

4 41

~

~

i 4

~

4

MAR 31 1981

- SORTED BY SALEM GFNERATil\\iG STATION nEPARTMENT, WORK OROFR NO.

SAFETY

~FLAlEO EQUJPt>1ENT WORK ORDER LOG

)

    • '"i Lr\\

WORK ORDE.R NUMBER 920001 933038 DEPT p

p p

p Page 9 of 12 EQUIPMENT IIJENTTFTCATTON CORRE.CTTVF ACTION, MOTnRr 13 SERVICE WATEfl Pllt>lP DESCRJPTTON OF PROALF.M,

CAUSE, CORRECTIVF ACTION,
  1. 12 SERVICE WATER NUCLEAR HF.ADER DESCRIPTION OF PROBLEM, CAUSt.:,

Cf1RRECTJVE ACTION, VALVE, lPSl DESCRIPTION OF PROALFM,

CAUSE, CORRECTIVE ACTION,
VALVE, 1 CV1 Oq OESCR lPT JUN OF PR1JALl'M,
CAUSE, CORRECTIVE ACTION, PRESSURE GAUGE, PA07311 OESCRIPTJON OF PROALF.M,
CflUSE, EXPLANAIION OF WONK PERFORMED REPLACF.IJ SEATS, BEARINGS, AfllD DEFLECTOR RING COOLFR LF.AK FAIJLTY MfHOR REPLACED MOTnR REPAIR DAMAGED INTERIOR PIPE LINING lll~K NOWN REPAIRED LINING VALVE WILL NOT STAY IN AllTO MODE FAllLTY SUPPLY REGULATOR TO POSITIONER REPLACED SUPPLY REGULATOR OPERATOR LEAKING FAUL TY DIAPHRAM REPLACED DTAPHRAM CHANNEL 2 FAILfO LOW FAUL TY PRESSlJRF TRANSMITTER 0003
l. '.

~

!,~

SORTFD IH 11EPARTllllENT, WORK URllf~ Nil.

MAR 31 198'1 SALfM GF.NFWATTNG SIATION SAFETY HFLATEO fQUJ~~tNT ~OHK n~nER LO~

llORK ORDER NUMSF.H DEPT EQUJPllllENT IOENTJFJCATION FXPLANI\\ TTON OF wnRK PERFnRMEO

)

p VHT HEATER lib?.~

TOTAL LINES

000071 TOTAL A-REr.S : 000016 LAST UPDATE q

. t 23932 ENTER COMMANOS END OF RIJN iilBRKPT PRINU

. ~

  • .*:\\

Page 10 of 12

.. l.....

cnHRECTJVf ACTION, DESCPIPTION OF PRORLFM, READING LOW

CAUSE, THF.h'MIH'.OllPLE pnsTJIONEr> TNrURlffCTLY co~RECTIVE ACTION, RELOCATED THFRMOCOUPLE l

j 00011 1

3/1/81 3/6/81 3/7/81 3/15/81 3/16/81 3/19/81 3/20/81 3/28/81 3/28/81 3/29/81 Page 11 of 12 0000 1301 945 1925 1700 2130 0034 0745 2240 0900 1200 0336 0518 2331 0612 e*

SALEM UNIT #1 OPERATING

SUMMARY

MARCH 1981 Rx operating at steady s-tate 100% RTP.

Rx trip, feed pump trip Unit goes to cold shutdown to change snubbers on pressurizer.

Rx Critical.

Turbine on line increase power to 100%.

Rx at 100% steady state power.

Decrease power to 70% to clean condensate pmjip strainers.

Increase power to 100%.

Steady state power at 100%.

Decrease power to 93% -

Condenser problems (Intake screens plugged).

Increase power to 100%.

Steady state power at 100%.

Decrease power -

High vibration on 13 L.P. turbine.

Power at 0%; unit shutdown.

Unit in Hot Shutdown.

Unit in Cold Shutdown.

T l>

  • ~UELING INFORMATION DOCKET NO.:

50-272

~~~~~~~--

UN IT:

Salem fll DATE: April 10, 198c£:.-

COMPLETED BY : L

  • K
  • Miller TELEPHONE: 609-365-7000 X507 MONTH:

March 1981

1.

Refueling information has changed from last month:

YES NO X

2.

Scheduled date of next refueling: ~o_c_to~b~e-r~3._.1_9~8~1.._~~~~~~~~~~

3.

Scheduled date for restart fallowing refueling: November 29, 1981

4.

A.

Will Technical Specification changes or other license amendments be required?

YES NO ---

NOT DETERMINED TO-DATE March 1981 B.

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO x

If no, when is it scheduled?

August 1981

~~~~~~~~~~~~~~~~~~

5.

Scheduled date(s) for submitting proposed licensing action:

August 1981 (If Reguired)

6.

Important licensing considerations associated with refueling:

NONE

7.

Number of Fuel Assemblies:

A.

In-Core B.

In Spent Fuel Storage

8.

Present licensed spent fuel storage capacity:

Future spent fuel storage capacity:

9.

Date of last refueling that can be discharged pool assuming the present licensed capacity:

Page 12 of 12 8-l-7.R4 193 104 1,170 1 170 to the spent fuel September 1996