Docket No. 50-311 MEMORANDUM FOR:
FROM; THRU:
SUBJECT:
o*
NOV 18 1980
-_,)
~
Cv rocc:
- o~<}s
- P.p......
.~z~
D. Eisenhut, Director, Division of licensing:.=~<'>
- .Q J. Kerrigan, Project.Manager, Licensing Branc~3, R. Tedesco~-Assistant Director for Licensing, DL SALEM 2 LICENSING STATUS
-\\£.l ;
© DL.~ -
There are still several outstanding issues which must be resolved prior to issuance of a full power license for Salem 2..The status of each of each Qf these issues is discussed below.
The issues are discussed in order of increasing significance;
- A.
FIRE PROTECTION J *
. The local fire department voted.on* November 5, 1980 to not respond to onsite fires.
The PNO that was issued.by OIE on this event (PNO-I-80-161) stated that the reasons given by the fire company for this action were that training and identificatiqn. of-hazards had been inadequate. - NRR is issuing a letter cisking-PSE&G to" identify the impact of this event *on the Salem fire protection program and their etnergency planning effort. OIE recent 1 y inspected the Sal em fire ;,protection program and i dent i fi ed two i terns of noncornp 1 i an<;:e:
, \\\\. ':* '.
f
- 1)
Failure to keep fire door.shut
- 2)
Failure to train orsite fire brigade The second item resulted not from an inadequate number of trained personnel, but from PSE&G's designation of l)ntrained personnel as fire brigade members.
There has been fairlj active press interesi in the local fire departm~nt's allegations. -
B.
GDC.51 I:,...
The staff has determined that Salem 2 is in compli.ance with GOC 51 Cton-tainment pressure boundary fractute toughness) with one exception :,-,main
- j feedwater piping.
We are* issuing a letter to PSE&G asking the111,.-to.'~~i(her:
- 1) provide fracture toughness data for this piping; 2) show by* analysis, that the piping would not become brittle; or 3) justify an exempt.ion/f'.rom..
Goe 51.
I
/
,/.*
(
\\
__ OFFICE
- .; ******** h
- * ************************** *.*. f.*.........
\\
SURNAME...................... *...,~............
- ** ~- ********** <! ***** ~ ********* ;*
- DATE~....................................
~
-~. *......... *..... :..................... *...... ~..
~-
NRCFORM318(9-*7_6_).N_R_c_M_o_24_0~~~~~~-*-*_u._s._G_o_v_ER_N_M_E_NT-~~R-i_~T~*'_NG~O-FF_1c_E_=_~_7_9*-28~9-*36-9~~~~~~~----------~
- NOV 18 198b C.
MASONRY !~ALLS D.
E.
The licensee',s response to I&E Bulletin 80_-ll (Masonry Wall Design) dated July 2, 1980 stated that the masonry walls are! heavily reinforced in both directions and. are not used to support seismic category I piping.
On November 7, 1980, the licensee verbally notified the resident inspector (Leif Norrho l m) that there are some wa 11 s with no hori zonta 1 reinforcement and that safety-related control air piping is supported by masonry walls.
There are three walls in question:* one wall between the two units and one wall in each of the units which is a 001,mdary of the.control room.
The 1 icensee* has submitted an LER for Unit 1, but has *not yet notified the NRC that the situation i$ i_dentical* for Unit 2.
The staff is developing a request for information that wi 11 all ow us to assess the impact of this issue* on the Salem 2 licensing process.
EQUIPMENT QUALIFICATION As a result of a staff audit of the Salem 2 equipment qualification study, the staff has requested that Salem 2 re-evaluate the test reports that were used as the basis for the licensee's 'study.
The revised study is.
expected to be submitted December 5, 1980.
The staff pl a*ns to conduct another audit after receipt of the licensee's submittal.
EMERGENCY PLANkING
- 1) Site Plan The staff n6tified Salem.in September 1980 that the Salem site plan was acceptable pending satisfactory resolution of 14 deficiencies.
- PSE&G subsequently re so 1 ved five of these deficiencies.. Of the
- remaining deficiencies, most are expected to be resolved by early to
- mid-December 1980.
The staff is work'ing clos.ely with PSE&G in this area.
- 2). State and Local Plans Delaware held a 11table-top,u exercise on November 7, 1980.
New ;J.ersey.*s 11table-top 11 exercise is expected to take place November 17; 19$0., Jhe.
NJ exercise was delayed because of unavailability of emerg~nc:Y pe{sonnel due to higher priority work (e... g., monitoring of chemical spil1$l...
- After completion of "table-top" exercises, the States will.parti~fpate
- in.drHls and a practice exercise prior to participating in'th~*'PE¥A **
- exercise...
The utility is reluctant to estimate-the date. of.the.... f'EM,~
exercis~ b.ecause the situation is very dynamic.
However,- the st,<l,ff, currently**estimates that* an exercise could be conducted_ in *Jari'l.i.ary:.. \\l~9,8l **.
'... \\
\\;
... \\
t
- \\.: -
OFFICE ** *.. * *.,:.<.. :................ *.......... *
[\\.
. SUR~AME~ **.**." ***,,.;............. **'*..***...**. :: : : : :: : : : ::: ;.:.:: :: :: :: :.:::: :: :::.: :: : :*:: ::.::: :: : :: : :': ::.::: :: ::: : :1~\\~. <
DATE.,.* *****. **:!*:.'............... *........................ :*.,..... *.*............... *.. *.... *............."............::.~\\.. ':'>-,,,:_.*.
/I ~
- ..1 NRC FORM 318 (9-76) NR<;:JVI 0240 '
- u.s. GOVERNMENT PRINTING OFFICE:'l979*289-369 *.
~I
...... NOV 18 191)
In.addition to the above-mentioned issues, there are two additional areas which are relevant to the Salem 2 licensfog process.
These are discussed below.
A.
SALP The results* of the regional SALP review indicated that of 19 functional
- areas.evaluated, increased ins_pection frequency was required in eight*
areas.
Four of the eight A)reas i-;ere rated as unsatisfactory: reactor operations, reporting, securitY1 and IT)anagement controls~ NRR is working -
- t-Jith I&E.to develop a staff position on these results in the event that
--the Commission i-ncludes the results of SALP in their consideration of the iss~ance of the Salem 2 license.
- B.. NUREG"'.'0737
.-;~-i}i
,..I
- _*,
- *q;A f.. draft* of the Sa1em_2.SSER has *been available for se~er.al ~teeks* :since the draft was originally written, c.J number of TMI-related r~quirements wer~ revi~ed with the issuance o~NUREG-0737. The staff is working on a comparative* study of the -draft SER with the new requirements.*
The *c-urrent *estimated.date for closeout of all issues with the exception of an_ emergency drill 'is early Jafll!ary 1981.
fl. maDagemcnt *meeting is scheduled for November 21, 1980 to discuss these issues~
cc: - H. Denton E. C_ase B. Grimes R. Vol 1mer
- o. Ross T. Murley
- s. Hanauer
~!~TRI:~~~
~~cketji]L_
LB #3 Rdg RTedesco
- FMiraglia JKerri gan
.. o/...
- /
- pKerdgan, Project Manager Licensing-Branch #3 -
Division of Licensi~g