ML18085A260
| ML18085A260 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/20/1980 |
| From: | Schneider F Public Service Enterprise Group |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-06, IEB-80-6, NUDOCS 8011200282 | |
| Download: ML18085A260 (1) | |
Text
Frederick W. Schneider Vice President Public Service Electr.ic and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Octobet 20, 1980 Mr. Boyce H. Grier, Director Office of Inspection and Enfo:i:;cerrierit
- USNRC Region 1 631 Park Avenue King of Prussia, JA 19406
Dear Mr. Grier:
NRC IE BULLETIN 80-06 ENGINEERED SAFETY FEATURE. (ESF) RESET.CONTROLS SUPPLEMENTAL RESPONSE SALEM GENERATING STATION UNIT NOS. 1 AND 2
.Sf)
(,')
-I
- ti t"O coc
- o
- :r~
- U-o...,.,
z~~-:
(")\\'.Ji) ;:tJ
- i::m ("~
~
~
~
...;..,~
~
0 -
~'""
(/1:
t_."'.)
h**-
~.~... ;
~:._*~:
61~
~
~~:::!_,)
~a:;
'°
'4\\;*
~~ -
\\.n Cl
~
An additional containment isolation valve *has been identified which could reopen upon a res'et of the isolation signal.
This valve (1SJ53 - Unit 1 and 2SJ53 - Unit 2) is for the test lines of the safety injection system.
The valve is located outside of the. containment and is normally closed during power operation.
It is only used for tes*t purposes.
The circuitry for the SJ53 valves will be *revised to eliminate the potential for reopening upon a reset of the isolation signal.
The change will be accomplished on Unit 1 during the present refueling outage and for Unit 2 prior to full power operation.
If you have any further ques.tions, we *will be pleased to discuss them with you.
Si.ncetely,
.j c.,,.l/ ___ /L£--~---<----.-~.
)J--;.-~
CC Director, Office of Inspection and Enforcement USN RC Washington, DC 20555