Summary of 800815 Meeting W/Util Re Status of Licensing Review
ML18085A256
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/06/1980
From: Kerrigan J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8011200163
Download: ML18085A256 (4)


Text

,.

i CJ,

~

NOV 6 1980 (J) z

-**l

t-:1 d <

CJ co Cc;

.. Gi

.U~(/)1

~~::::

~~;u;.

~-

i::g;o

$~-

Docket No *. 50-311 *

01
a.

APPLICANT: :Puhl ic Service Electric and Gas Company.

C).i

.rrr:J'I 0

<:J'}J

~

FACILITY:

Salem Nuclear Generating Station, Unit 2

SUBJECT:

SUMMARY

OF MANAGEMENT MEETING TO DISCUSS STATUS OF LICENSING REVIEW On August 15, 1980, members of the NRG staff met with the Licensee to.discuss.

the status of the Salem 2 licensing review. Attendees at the.meeting are listed in Enclosure 1.

At the meeting, o. E1senhut briefly discussed each of the items which would

t; r';

c.-.1

(/) ::.:.:

rn<

l
.l-rr-;

~<a

  • no

~¥!:*

=I!

~i

~

need to be satisfactorily resolved before the staff could take further. 1 icensing actions.

The items addressed included:.. fire protection, TMI... 2 qated require- -

ments, steam generator tube plugging, control room design, radiation protection organization, operator licen$ing exams, purge valve alarm, turbine inspection and equipment qua 1 if i cation.. *

. D. Ei senhut al so discussed those items, which had the potenti 9(~-6f signi'ficantly delaying the issuance of the Salem 2 license. These items were emergency preparedness and shift staffing.

O. Eisenhut and *s.-Hanauer pointed out that the *current shift staffing program proposed by the Licensee* had-several deficiencies. For-example, the proposed program did not allow for attrition.

Also, the Licensee had proposed starting a training program for J2 people in September 1980.

NRC suggested that more than 12 people should be included in that program.

The Licensee described their 1 icensed operator program.

Biisically, new people

  • are hired as Utility Operators and are eventually promoted to the position of Nuclear Control Operators.

At the maximum promotion speed, the program takes

-_.about four years.

s. HanatJer asked the Utility to resubmit their staffing pl an after incorporating comments of the meetjng.

D. Eisenhut* stated that the staff would schedule resources to revjew Salem.2 upon receipt of a Licensee letter detailing the schedule for completion of* all

, open items.

_:': ' (

/s-/

J. Kerrigan, Project. Manager Licensing Branch No. 3 Division of Licensing

  • u.s_ GOVERNMENT PRINTING OFFICE: 1979-289-369.

I

/

I

  • ~*

Mr. R. L. Mittl. General ~anager Licensing & Envfron111ent Engineeririg.& Construction Department Public Service Electric & Gas Company 80 Park Place

N12h1ark,

~.'c1 Jersey 07101 cc:

Richard Fryling, Jr., Esq.

Assistant General Counsel Public St::rvice Electric & Gas CoH:rany 80 rark rL=ice Ne1;ai*k, r.:ew lJersey 01100 f<c.d: k!ett erhahn, Esq.

CoM:1:r, l'.c*ore f( Cober Suite 1050 1747 Pennsylvania JI.venue, N.

I~.

1*.'ashington, D. C.

20006 r;':r. Leif J. Norrholm c/o lf. S. Nuclear Regulatory tonrnission Drah*~r I

9 l

Management Meeting Attendees Name A ff il i at ion D. Eisenhut NRC

s. Bryan NRC
s. Hanauer NRC D. Eckert PSE&G F. Schneider PSE&G.

T. Martin PSE&G R. Mittl PSE&G F. Librizzi PSE&G*

Docket File NRC POR Locul POf{

TIC/NS IC/Tera NRR Reading Ll3t/3 Reading H. Denton E. Case

0. Eisenhut R. Purple B.

~J. Youngblood A. Sch1*1encer F. Miraglia J. Mi 11 er G. Lainas

. R. V9llmer J. P. Knight R. Bosnak F. Schauer R. E. Jackson Project Manager J, Kerrigan Attorney, OELD J. Lee OIE (3)

ACRS. (16)

R. Tedesco NRC Particioants:

-9;.'

D. Eisennut *

s. Bryan
s. Hanauer bee:

/\\pplicant & Service List

~

G.

v. s.
v. z.

~J.

D.

R.

\\.I.

D.

P.

R.

0.

F.

H *

!*I.

R.

T.

l..

T.

l-J.

ll.

s.

\\*J.

r.

D.

M.

R. c.

K.

(i.

A.

D.

J.

D.

P.

D.

Lear Noonan Pm-Jlick*i Bc!1u l'OYil Rosztoczy Haass Mull er Ba 11 ard Regan Ross Check Satterffo l d Parr Rosa Butler Kreger Houston Murphy Rubenstein Speis Johnston Stolz Hanauer Cammi ll Schrueclcr Skovholt Ernst

.Baer Bel'*I "ingcr Knie 1 Kn*i !Jhton Thudani

-Ton1li Kramer Vassallo Collins Ziemann I

'.... *.