ML18082A818

From kanterella
Jump to navigation Jump to search
Forwards List of Documents from NRC Files That Were Provided on 800701 for Use in Util Fuel Rate Case.Nrc Retained Exhibit Numbering Sys Developed for Case
ML18082A818
Person / Time
Site: Salem, Hope Creek  
Issue date: 07/14/1980
From: Russell W
Office of Nuclear Reactor Regulation
To: Decker R
MARYLAND, STATE OF
References
NUDOCS 8008010128
Download: ML18082A818 (10)


Text

c July 14-, 1980

  • Mr. Ronald A. Decker, Staff Counsel Pub 1 i c Service Cammi ss ion of Maryl and 231 East Baltimo~2 Street Baltimore, Maryland 21201

Dear Mr. Decker:

Enclosed is a list of documents from the NRC fi.les that were provided to you on July 1, 1980. for use in the Delmarva Power and Light Company Fuel Rate Case.

I have retained the exhibit numbering system that was developed for this case.

Enclosure:

As stated cc:

W. J. Ross S. Sohinski Service List DISTRIBUTION Docket 50-272 NRG PDR LPDR WTRussell WHazelton TSB R/F Sincerely~

Original signefJ bj William T. Russell, Chief Technical Support Branch Planning and Program Ana,1ysis Staff Office of Nuclear Reactor Regulation S \\tO 8 0 1*0 /2g oFFrcE~.--.NRR.:O.R,.1.... r~J~-~:!.~~-=-~.*....

tHRussell SURNAME

.. *'*!~.-oss*. :lfo.':l*...................

DATE~.... JI.j8!) * * * *

  • 7 j. \\ * -81} * * * * * *
  • u,s. GOVERNMENT PRINTING OFFICE: 1979-289-369

Mr. Ronald A. Decker, "quire cc:

Mark J. Wetterhahn, Esquire Conner, Moore and Corber Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Service Electric and Gas Company 80 Park Place Newark,_ new Jersey 07101 Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch--Road Trenton, New Jersey 08628 Mr. Hank Midura, Manager Salem Nuclear Generating Station Public Service Electric and Gas Company 80 Park Pl ace Newark, New Jersey 07101 Mr. R. L. Mittl, General Manager Licensing and Environment Public Service Electric and Gas Company 80 Park Pl ace Newark, New Jersey 07101 Salem Free Library 112 West Broadway Salem, New Jersey 08079 Lief J. Norrholm, Resident Inspector Salem Nuclear Generating Station U. s. Nuclear Regulatory Commission Drawer I Hancocks Bridge, New Jersey 08038 41it July 14~ 1980

lJ.1':>"J.* U.lf JJV\\.iU~"l'i:> ru!ilJil."l".1.Mi "J.V i:>.lU.11!"'1.I.

UU"J."AU~

r. i 1*

HIBI'l' N01 TYPE OP' DOCUMENT

!ill!!

TO DOCUMENT DATE BRIEF.

SUMMARY

OP CONTENTS 1

License Amendment, Safety NRC PSF.&D 10/J0/79 Amendment No. 20 to Facility Operating License, with Bvaluation, w1 th covering* letter SU.-ev ~~l?t!!>n_~pporl_i.ng_,4mendnie11t_No. 20

.2.

Letter NRC PPUSC 05/19/80 Transmf ts def'ini t:lons that were requested in PPUC letters Of 5/5 and 5/23/80.

3A License Event Report 79-ld4/0JL NRC 6/1/79 Damaged grid 1traps on core aasembliee observed during refueling.

4 Lioen*o EveQt Report 7~-44/0JL-l J>6E&G RRO 7/J0/79 luthll' 1valut1on ot rrt4 1t:r:ap pxoblom Lioenue Event Report 79-47/0)L PSF.&G NRO 6/30/79 Failed spider tingere on 6 control rod~

4'B

. Minutes ot Meetblg held.7 /17 /79

  • lletween PSE&G & NBC 7/2S/79 Diaouaaion of rod.let.failure during initial operating oycl 40 Supplemental Licensee EYent Beport PSF.&G BBC

,7/30/79 Further enluation or rodlet failure p~ble*

79-47/03~1 S1 Ill Bulletin 79..02 3/8/79 Pipe Support !aae Plate Deeigna SB 79-02,Redrdon.1 6/21/79

  • Additional information end olar:!.tioation oi initial
Bulletin 1

~.

79-02 Borieion 10 Supplement l

.B/20/79 Ori teria tor interia aooeptab111 tr with load than originu l

.;1 '::

design taotora

.. e 79-02 Bevtoion 2 11/8/79 ClarifJ intent ot 79-02 and establish NM positions on minimum safety taotors, bolt p1-eload an.a completion dateu SB Letter*

PSF.&G NBC.

7/679 Lioeneee :response to 79-02 vith ~

ot' program

  • .r _:.*

atatua and oonoluaion SJ Letter PSF,&G

RRC 7/10/79 Confirmation of verbal report to JmC reaident inepeotor ooncerning defioienciee in anchor embedment so Lioenaee Event Report 79-49/0lT PSF.&G

. NRC 7/24/79 Anchor bolt embedment defioienoieo SH Letter NRC PSF.&G 8/28/79 Licensee proposed actions oonoern!ng lE Bulletins 79-02

\\

and 79-07

\\.

PAGE 2 TO DOCUMENT DATE BRIEJ' SUMMA.RY' OP CONTENTS EXltmI'l' NO,

'l'YPE OP DOCUMENT

~

SI Letter

. PSF.&G NBC 9/24/79 Teat Program Outline tor testing anchor bolt inatallationn 6A IE Bulletin 79-07 4/14/79 SeiSllio.Stresa Analysis ot Sa.f'et7-Related Piping 6B Report with covering letter PSE&G HRC S/J/79 Re8'11ts and licensee proposed actions 6C Minute* ot Telephone Conversation

Between PSF.&G & IRC 6/18/79 Results of pip* etreas analyaia calculations & eTBluationD 6D Lettoi- '11th data request RRC
  • PSF,&G 7/S/79 Request for additional information to~ 1nteria operation 9*

ot Salem I Lett@J" 7/24/79 Diacuasion ot l!IRC benchmark "ntrifioat1on p:rOblems to be 6E pertol.'m8d b7 licen*ee 67 Lioetw09 lvwnt Report 79-SJ/OlT PSF.&G JmC '

8/23/79 Results or pipe npport atrea11 oaloulations outeide 11tatiatical liaits 6G Miml.WI ot Meeting OD 8/17/79

>>etVeen PSE&G & BRO 8/27/79 Beeulta of lioenaee'* initial eva.J.uati.on of pipe support.

6H Lett.>1 PSF.&G llfC 10/11/79

!greementa reaohecl at aeeting on 10/9/79 relative to lE :Bulletin 79-07 6I Lettei:'

PSE&G lllC 10/18/79 To amend Phaee III program aa 4eacribed in 10/11/79 letter

. 6J Licen*** lhent Re~rt 79-S3/0lX-1 PSE&G BBC 3/Jl/80 hrther diaouaaion ot detioienoieeib pipe support atreaso11 96X Lioeraefio hent Beport 79-S3/0U-2 PSFAG BRO S/30/80 Completion ot all requirements. ot II ihtlletin 79-07 7J.

IB lu.1letin 79-13 6/25/79 Cracking in 1eedvater Syatem Pip!ntt 7B 79-i3 hY.t*iOll 1 8/30/79

!otiona to be* taken by deaisnated a~~licante tor Operating Licensee (include* Sallllt* 2 70 79-13 llevbd.oo. 2 10/16/79 Reduction of scope in examinatJ.ou at pipe l!IJ'Btem welda1 cracking in Salem I steam genemto~ 11ozzle identified 7D Lioeneee hent Report 79-46/0l'l' NRC 6/28/79 Linear indications (cracks?) ~ veld areas on reedwate~

nozzles discovered

  • ~*

PAGE J

t.

I

1. J EXliI.Hl'l' ~O
  • 1'YPE OF oocu~T FROM TO J)()CUMfilN'r DATE B~

SUMMARX O~ CONTENTS 7E

.l'linutee of Meeting on 7/12/79 Between PSF.&G &.NRC 7/2*7/79 Evaluation of weld problem and actions intended by licensee 7F Licensee Event Heport 79-46/0X-l PSE&G NRC 11/10/79 Cause of failure and corrective actions planned are discussed 7G Safety Analyo:Ls vi th covering letter

.NRc.;

PSE&G 2/25/HO Safety analysis ~r interim actions..Lntegri tll or feedwater piping vas okayed until evaluation of I

recommendations v

ettA IE Bulletin 79*14

'f /2/19 Seismic Analysis !or !1-lSU.ilt Sat'etf-Related Piping S7etems HB 79-14, ltlvieion 1 7/17/79 ularification of applicability' of actio~ items in original bUlletin

\\

'19-14 Supplement l and 2 rj/15/79 Additional guidance and derinition of certain action items in original*bUlletin

./JJ

.Bepor,-.vtta-oovering-htte~

.fSJ!:diG.

BBC

.. tJ/16/79

-Reapouae_oLlioenaee -to.t. tem-111* ot.. /9*14 bulletin 8g Report "1 tn oovor!Dg letter

.t'Sl!l..G RBu 9/14/79

.ttesponse ot licensee to Item #2 of 79*14 bulletin

\\.

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Ju 1 y 14 ' 1 9 80 Mr. Ronc~l d A. Decker, Staff Counsel Public Service Commission of Maryland 231 East Baltimore Street Baltimore, Maryland 21201

Dear Mr. Decker:

Enclo~ed is a list of documents from the NRC files that were provided to you on July 1, 1980 for use in the Delmarva Power and Light Company Fuel Rate Case.

I have retained the exhibit numbering system that was developed for this case.

Enclosure:

As stated cc:

W. J. Ross S. Sohinski Servtce List Sincerely, l(,ujh". *-. T: ~

William T. Russell, Chief*

Technical Support Branch Planning and Program Analysis Staff Office of Nuclear Reactor Regulation

Mr. Ronald A. Decker, !quire cc:

Mark J. Wetterhahn, Esquire Conner, Moore and Corber Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esq~ire Assistant General Solicitor Public Service Electric and Gas Company 80 Park Place Newark,_ new Jersey 07101 Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch--Road Trenton, New Jersey 08628 Mr. Hank Midura, Manager Salem Nuclear Generating Station Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101 Mr. R. L. Mittl, General Manager Licensing* and Environment Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101 Salem Free Library 112 West Broadway Salem, New Jersey 08079 Lief J. Norrholm, Resident Inspector Salem Nuclear Generating Station U. S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, New Jersey 08038 e July 14, J980

!1.1.l:i'J.' UJr JJVliUMC.irn*i:) W!i.l.A'J.'.1.W 'J.V iJA.l.&l!il'l.1. UU'J.'Aul!i r. I

\\'

lll>>I'l' NO, TYPE OP' DOCUMENT

!fil!!

TO DOCUMENT DATE

BRIEF. SUMMAR!' OF CONTENTS 1

Lioenae.Amencbnent, Satev imc PSF.&D 10/30/79 Amendment No. 20 to Faoilitr Operating License, with Evaluation, with covering* letter SU.-ev ~~?t!!>n

__ ~ppqrt~_.Amendmeq:t

__ No 20

.2.

Letter NRC PPUSC 05/19/80 Transmits definitions that were requested in PPUC letters Of 5/5 and 5/23/80, 3A License Event Report 79-h4/03L NRC 6/1/79 Damaged grid 1trapa on core aasembliee observed during refueling.

9 Lioea110 Event Report 7~-44/0JL-l PSE&G mw 7/J0/7~

Jw:tber 1valution ot fri4 1tnp pi:obl@11 4A License lhent Report 79-47/0)L PSF.&G no 6/30/79 Failed spider tinsera on 6 control 1:0d~

I.

I. 4D

_Minutes ot Meeting held -7/17/79

  • Between PSF.&G & NBC 7/2S/79 Diacuaaion ot rodlet failure cluring bi tial operating oyc.~ l 1'0 Supplemental Lioemee lnnt Jleport PSE&G lmC

,7/30/79 J\\lrther eftluation of rodlet failure px-oble*

79-47/0JJr-1 Si II Bulletin 79-02 3/8/79 Pipe Support Ease Plate Desi~

SB 79-02,Be"fi&ion.l 6/21/79

  • Additional inforsna.tion and olar.ltioation ot initial
Bulletin

.. : so 79-02 ReT.t1ion 1 1 Supplement 1

.8/20/79 Ori t.ria tor interim aooeptab111 tJ' vi th le1111 than originu l

,1. *:,.

deeign taotore

-~*

""9 79-02 BeVioion 2 11/6/79 ClarifJ intent or 79...02 and establish N1W p0ai tion11 on minimum sarev taotora, bolt preload and coJ!IPletion dateu SB Letter*

PSE&G NBC.

7/679 Licensee :responee to 79-02 with l!NJlllUU"1 ~t program statue and oonolusion I

I SJ 7/10/79 Letter PSE&G

.:RRC Confirmation of verbal nport to BRO (r$~ldent inspector concerning defioienciee in anchor em~e~nt I

so Liaenaee Event Report 79-49/0lT PSF.&G

. NRC 7/24/79 Anchor bolt embedment defioienoiee SB Letter 8/28/79 NRC PSF.&G Licensee proposed actions oonoerning,lE ~ulletine 79-02 and 79-07 1

1

~

J

I PAGE 2 I I

'lTPIIJ OP DOCUMENT J'R(lf TO D0CtJMENT DATE BRIEi'

SUMMARY

OP CONTENTS EXHIBIT NOa.

SI Letter PSF.&G NBC 9/24/79 Teet Program outline tor testing anchor bolt inetallationa 6A IE Bulletin 79-07 4/14/79 SeiSll.io.Strese Analysis ot Saf'ety-Related Piping 6B Report with covering letter PSE&G NRC S/J/79 Results and licensee proposed actions 6C Minutae ot Telephone Conversation

>>etween PSFAG & BRC 6/18/79 Results ot pipe stress analJ"Bi& calculations & evaluationn 6D Let-toi-11:1.tb data request RRC

  • PSE&G 7/5/79 Request for addi1:ional into:mation to'!: interill opemtion e*

ot Salem I Letter PSF.&G 7/24/79 Discussion or BBC benchmark Teritication pr0blems to be 6E NBC per!omed b7 licenaee 67 Lioeneeo lvent Report 79-53/0l'r PSF.&G BBC I

8/23/79 Baaul ta ot pipe npport atre1u1 calmaations outaide statistical lillita 6G Min\\\\t.1 ot Meeting on 8/17/79 BetVeen PSE&G & RRC 8/27/79 Reeults ot liaenaee'* initial evaluation ot pipe support.

6H Letwi-PSFAG DC 10/11/79 Agreements reached. at aeeting on 10/9/79 :telative to IE Bulletin 79-07 6I Lett.ti PSF.&G BBC 10/18/79 To*amend Pbaee llI prograa u 4eacribect ill 10/11/79 letter

. 6J Lioen*ee B.ent Be~rt 79-53/0lX-1 PSF.&G BBC 3/31/80 IUrtber disouaeion ot datioienoiee..ln pipe support 11tresso 1;

-6E Lioeneee EYent lleport 79-53/0U-2 PSr.&G BBC 5/30/60 Completion ot all require*nt~ ct DC.8Dlletin 79-07 7.l IB Jull*tin 79-13 6/2S/79 Cracking in 7eedvater System PipiDS 7B 79-iJ llevi*ion 1 8/30/79

.lotions to be* taken by deaig1:1Q,ted e,plU.aante !or Operating Licensee (inolude11 Salem 2.

70 79-13 Re-eiaion 2 10/16/79 Reduotion ot scope in examine.tion i/Jt pipe syetem welda1 cracking in Salem I steam pnera.toi-nozzle identified 7D Lioeneee EYent Report 79-46/0lT PSF.&G mtC 6/28/79 Linear indications (era.eke?) in veld areas on feedwate~

nozzles dieoovered i(*

EXH.I.HI'l'.NO, 7E 7F 7G 80

\\

1l'YPE OF.DOCUMENT

.rdnutee of Meeting on 7/12/79 Licensee Event Heport 79-46/0X-l Safety Anal:yeie vi tb covering letter IE lhllle.tin 79-14 79-14, ~eviaion 1

'19-14 Supplement 1 and 2

  • Beport-\\tita.-oovering-let~

Report ~ta oovering letter PAGE

!]Q!i TO -

l3etween PSF.&G & NRC PSF.&G NRC

.NRG PSEaG BBC 3

.i>OCUMl!:N'l' DATE 7/2*7/79 11/10/79 2/25/tjO

'f /2/79 7/17/79

'iJ/15/79

.. H/16/79 9/14/79 BRU!a' sUMMARi o~ CONTENTS Evaluation of veld problem and actions intended by licensee Cause of failure and corrective actions planned are discussed Safety analysis t;>f interim actions.

.Lntegri tn of feedwater piping was okayed until evaluation of recommendations Seismic Analysis for Ae*.ISUilt SafetJ'-Related Piping Systems ularification of applicability of action items in original bulletin Additional guidance and de!ini'U.on of certain action items in original* b'illletin

-Reaponae__o.t_lioonaea.to.L tea-Ill ot... 19... 14 bulletin

..tteeponse of' licensee to Item #2. of 79... 14 bulletin I

~!

I v