ML18082A425

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Apr 1980
ML18082A425
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/09/1980
From: Miller L
Public Service Enterprise Group
To:
References
NUDOCS 8005200508
Download: ML18082A425 (1)


Text

l. llnitNime: ____

s_a_le_m __

li_~1 ______________ __

Notes:

2.

P.eporting Period:

April 19 8 0

3.

Licensed 'n1eDral. Power (~) : ___

3_.3..... 3_8 ____ _

4.

Nmrepl.ate Rating (Gross ~):

1135

5.

Design Electrical Rating ~

~): _1_09_0 ____ _

6.

Maxim.in rependable Capacity '\\Gross !+ie) : __

11_2_4 __ _

7.

Maxim.D Dependable Capacity (Net K¥e) : __

1_0_7_9 __ _

50-272 IXX::KET N.'.), : _________

CATE : __

M_.a.;_y.__9~,....;1::..:9~8;;:,,:0~-

a::MPIEI'm BY: _....,......L_. _K_. _M_;i:...:* 1:...:1:...:e:...:r:._ __

TEU:PH:NE: __

60_9_-_3_6_5_-,;,_7,;,_0 0.:::...0=----

Ex t. 507 CORRECTED COPY

8. If Ol.anges CccJr in Capacity Ratings (Itl!!!s Nl.lllt:er 3 '1mou;h 7) Since Last Report, Give Rea.sen:

NONE

9.

Power Level To Which ~'"icted, If Aey (Net ?.fie) : ________

N_O_N_E _______________ _

10.

Reasons Far P.estrictions, If Arry: ----'N~O::..:N""'E=----------------------------

'!his M::ln t. "1 Year to Date C\\mllative lblrs In RepJrting Per-Cd 719 2,903 24,864

~-

12.

Nlm:er Of Eours Reac+-..or Was Critical 719 2,812.6 12,900.6

13.

Reac:t:cr Reserve Shuta::iwn Eburs 0

0 22.7

14.

Hours Generator On-Line 719 2,713.3 12' 244.*4

15. Onit.Reserve Shutdown :!blrs 0

0 0

16.

Gross ~Energy Generated(!+m) 2,269,934 812291914 35,766,211

17.

Gross Electrical Energy Generated (MWH) 774,940 2,787,540 11,955,040 l,8.

Net Elec:ttic:al Energy Generated (Mom) 744,437 216671730 11,297,320

19. llnit Service Factor 100.o 93.5 49.2
20.

llnit Availabi1ity Factor 100.0 93.5 49.2

21. Unit Capacity Factor (Using MOC Net) 96.0 85.2 42.l
22.

Unit Capacity Factor (Using DER Net) 95.0 84.3

41. 7
23.

llnit Forced Outage Rate 0

6.5 39.4

24.

Shuttbms Scheduled Over Next 6 ~ths (Type, Date, CIOO Duration of Each):

Refueling 9/20/80 - 12/7/80 N/A

25. If Shut Down At End of Report Perio:i! Estimated Date of Starblp: -----------------

llni ts In Test Stat:lls (Prier tc Cotrrerc:ia.l ~tion) :

8-l-7.R2 Pg.

3 of 17 Forecast 09 /30/7 6 11/01 /76 12/20/76 Achieved 12/11/76 12/25/76 06/20/77 l/OO'l s