Supplements Previous Response to IE Bulletin 79-02,Revision 2.Sys of high-intensity Alarm Lights Will Be Installed in High Noise Areas.Addl Speakers Will Be Added to Outside Areas.Corrective Actions Will Be Completed on 800930 & 1030
ML18082A292
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/02/1980
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-18-R2, NUDOCS 8005050134
Download: ML18082A292 (2)


Text

5~- ~---* /

__..:::, ex

    • ~...........

'\\

80U5050)~

Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place N,ewark, N.J.. 07101

\\

201/430-7373 Production Aypril. 2, 1980 Mr. Boyce H. Grier, Director Off ice of Inspection and Enforcement Region 1 U.S *. Nuclear Regulatory Commission 631.Park Avenue King of Prussia,.PA 19406

Dear Mr. Grier:

NRC IE BULLETIN NO. 79-18 AUDIBILITY PROBLEMS FROM HIGH NOISE AREAS SALEM GENERATING STATION, UNIT NO. 1 The audibility survey under actual. conditions requested by Bulle-tin 79-18 has been completed and the following high noise, poor audibility areas were *identified:

a) containment building; b) outer penetration area; c) all pump rooms, i.e., WW,.RHR, etc.;

d) service water intake pump bays; e) circulating water intake; f) turbine £~ildi~g, elevations 88' and 100'.

Since plant personnel are.required to*wear ear J?rotectors in these high-noise *areas when the "unit is operating, it is possible the audible alarm signal will not always be* 'he:ard..

A visual alarm signal in conjunction with the existing audible alarm system should ensure the *probability of all.personnel being alerted.

Persons thus alerted can proceed to the neare~t* desig-nated location to receive further directions.

Therefore, we will install a system of hi.gh~intensi ty alarm lights in the identified high *noise :areas,-.said lights to be activated simultaneously.with.the *audible alarm system.

(In addition, we *will install additional "he*a:r-he*re 11* booths*.so that instructions can be received by the *personnel* aler.ted by the alarm l~ghts.)

Boyce H., Grier 2 -

4-2'""!80 Also, as a result of this survey, additional speakers will be added to various outside areas within the* station security

.boundaries to assure audibility.

  • All corrective actions will be completed in accessible areas by September 30, 1980; corrective actions in inaccessible areas will be completed by November 30, 1980.

Sincerely, cc. Director, O;ffice of Inspection and* Enforcement

.Division of Reactor Operations Inspection U.S. Nuclear Regulatory Commission Washington, DC 20555