ML18082A146

From kanterella
Jump to navigation Jump to search
Notifies That Util Will Establish Onsite Safety Review Group,Independent of Station Staff,To Perform Independent Reviews of Plant Operational Activities.Training Program for Offsite Technical Personnel Will Be Instituted by Aug 1980
ML18082A146
Person / Time
Site: Salem 
Issue date: 04/03/1980
From: Mittl R
Public Service Enterprise Group
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 8004110468
Download: ML18082A146 (2)


Text

Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201/430-7000 April 3, 1980 Director of Nuclear Reactor Regulation

u. s. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Olan D. Parr, Chief Gentlemen:

Light Water Reactors Branch 3 Division of Project Management MANAGEMENT FOR OPERATIONS NO. 2 UNIT SALEM NUCLEAR GENERATING STATION DOCKET NO. 50-311 PSE&G hereby submits the following information as a result of a meeting with representatives of your staff held on March 5, 6 and 7, 1980.

PSE&G will establish a Safety Review Group, independent of the station staff, but assigned on-site, to perform inde-pendent reviews of station operational activities.

The Safety Review Group will be composed of five persons; one supervisor and four additional persons with collective ex-pertise in the areas of nuclear engineering, heat transfer, mechanical engineering and instrumentation and controls.

It is our intent to have the supervisor of this group report off-site.

The group will be functioning by initial fuel loading.

The Emergency Plan Implementation Procedures Manual will be revised to reflect specific engineering and management sup-port and staffing requirements for adequately manning the Technical Support Center within two hours following declara-tion of an emergency.

It is our intent to make these re-vised procedures available prior to initial fuel loading.

A training program for off-site technical support personnel will be instituted by August, 1980.

Accident mitigation and recovery procedures will also be completed by August, 1980.

The Energy People

  • 4/3/80 It is our intent to provide PSE&G's public information man-ager with two months of specialized training in the areas of nuclear plant systems and radiation technology.

It is ex-pected that this training will include, as a minimum, a PWR systems course and on-site training.

This training is ex-pected to be completed by August, 1980.

Should you have any questions, please do not hesitate to contact us.

BC03/l 1/2 R. L. Mittl General Manager -

Licensing and Environment Engineering and Construction