ML18082A007

From kanterella
Jump to navigation Jump to search
Organization Table for Facility.Plant Operations Review & Audit Responsibilities Encl
ML18082A007
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/25/1980
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML18082A005 List:
References
NUDOCS 8001310271
Download: ML18082A007 (1)


Text

, .6-. 2 REVIF" -\ND AUDIT Organi:r,ational units for the review and audit of plant operations shall be constituted and have the re-sponsibilities and authorities outlined below:

A. Plant Operations Review Committee

1. Members hi£
a. Chairman: Plant Superintendent
b. Vice-Chairman: Assistant Plant Superintendent
c. Engineering Support Supervisor
d. Operations Supervisor
e. Maintenance Supervisor
f. Reactor and Computer Supervisor
g. Chemistry and Health Physics Supervisor
h. Instrument and Control Supervisor
i. ][(~;11th Phys:lcist
2. Qual if ica tio1:!.£ CO. *The qualifications of the regular members of the Plant Safety Conunittee with regard to the 0 combined experience and technical specialties of the individual member shall be maintained at a level at least equal to or higher than as described in Specification 6.1.
3. Meeting freLl1:_lency: Monthly, and as required, on call of the Chairman.
4. Quoru~1_:_ Chuirman or Vice-Chairman plus four*members or their designated alternates.

NOTE: For purposes of satisfying a quorum, the Vice-Chairman may be considered a member providing that the Vice-Chairman is not presiding over the meeting.

194