ML18079B052
| ML18079B052 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/22/1979 |
| From: | Wetterhahn M CONNER, MOORE & CORBER |
| To: | Beverly Smith NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| References | |
| NUDOCS 7910050697 | |
| Download: ML18079B052 (4) | |
Text
.. --
- ~ ~*-.I:-2,.t:
- 9 L.AW OFFICES CoxxE&MooRE & CoRBER TROY B; CONYER, '1R*
ARCH.&.. MOORE, JR!'.
ROBERT ol. CORBER MARK ol. WETTERHAHN DO~AL'D ol. BALSLEY. J'R.
ROBERT M. RADER KEITH H. ELLIS
'"yoT ADMl:TTZD JN' DoC*
1747 PE:SXSYLVA:Sl.A.AVE:St:E, :S. w*.
WASHI:SGTO:S. D. C. 20006 August 22, 1979 Barry Smith, Esq.
Of £ice of the Executive Legal Oirector
- u. s. Nuclear Regulatory Commission Washington, D. C.
20555 In the Matter of Public Service Electric & Gas Company, et al.
(Salem Nuclear Generating Station, Unit 1)
Docket No. 50-272
Dear Mr. Smith:
(~02) 833-3:50G.
As we discussed today, I am transmitting to you a copy of the calculations performed by Robert Douglas of Public Service Electric & Gas Company relating to the estimated dose resulting from transfer of spent fuel from Salem Unit 1 to Unit 2.
Sincerely, Mark J. Wetterhahn Counsel for the Licensee Enclosure cc:
Gary L. Milhollin, Esq.
Mr. Frederick J. Shon Dr. James c.* Lamb, III Chairman, Atomic Safety and Licensing Appeal Board Panel Chairman, Atomic Safety and Licensing Board Panel Richard Hluchan, Esq.
Richard Fryling, Jr., Esq.
Keith Onsdorff, Esq.*
Sandra T. Ayres, Esq.
Mr. Alfred C. Coleman, Jr.
Mrs. Eleanor G. Coleman Carl Valore, Esq.
Off ice of the Secretary June D. MacArtor, Esq.
1q/602'6 097
e*
Sl1LEH NO *. l U!~ l ~*
E:s t. ima t.20 f l"O:i! Unit dose
?~o*. l from raovinc and storinq snent
~
in tiie t;nit ?~o. 2 s:r:ic:it fuel l)
- 2)
G operators to gnload spent fuel cask, pl a(:c* in cl econ pit. And wash down, place in trans!er pool and ~emove h~ad.
6 people x 3 hrs. x 3.5 mr/hr.
o operators to load 2 fuel asscmbli~s in a crack (one person to operate bridge, one to c?erate crane, one to operate fuel har.dling lools, l l.iealth physic~ arid 2 to record asseffiblics moved.
6 people x lO minutes/assembly x 2 a~.sc~blies x 3.5 rrir/hr.
=
3 }
4 )
~ I 6 f;co:µlc for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Lo set. cask ?ieaa.
6 people x l h~. x 3.5 mr/hr.
6 operators for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Cl hour to deccn cas%, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to load cask on truck) on av ~~-~~.L'O
~r/~r ~~elA
....... c~\\,.o 6.. p 0 '"'o'e.... 2 ~~s
'"".J..'0
-~*/"*~
.1-~.:.-
n
- H*
,~.. a
~r1*~~ ~~~v~p ai,A
~s-si*s~~~*
- ..~"ro~~~~*~1,.
'°1**
- ""W*'"-
W~~-
,..~***W'--..*J 15 r:drHitcs to drive.from !..."nit l to Unit 2 fuel handling builaing {approx. 5 mr/hr *.
~ cat).
=
2 pco?lc x 15 hr3. x ~.o mr/hr.
=
60
- 6)
~,operators :o i:nJoad, rinse cc,*:.:i, ar:O*
µlace c~sk in ~uel t:anBfe~ pool
(
Z hrs) *
~**~~;
pool.
63 ~-~
2.1 :nr
?
~.,::,........
- 6. pe-ople x 2 hrs. x l 0 mr/hr.
=
120* ;n.r 7 }
6 people to rornovc ca&~ head at transfer pool (ftpp~ox. 1 hr,),
6 people x l hr. x 3.S ~r/hr.
- 8) 6 C?cratOI."S to niove.2 fuel G.SS<?;.":bli'S fro:n c!l.s}: to :-ac};s (SP??'OX. 10 ;;;inutes/
- .. c s c-;.., 1 " \\
"""'a;;
... ~*:I
- 6 people x 20 hrs.
. 170
- i. 0 n:::
. A
r' t--*-****
9* 9 )
G operators for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to set cas}: head.
~ ~o~oi~ v 1
~
-r/~r v
, h-u l' -
V *
- "\\
_, I.,,,.
- ~
j I I
h I
- 10) 6 cp~rators !or 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to decon cask and load c.m t:;uci~ to ~*ctut*n to Unit ?~. l (cask empty, approx. 1 mr/hr.}.
- 6 people x 2 hrs. x l mr/hr.
ll)
True>: driver ano as!:dl:itant for approx:-
- . rnately 15 minutes to return to Unit. No. i*
at
- 5 mr/hr.
=
21 rnr 12 rr.r 2 occole x 15 hl*s. x.s rnr/h?'.
=
~
t.>O
- 15 :rnr
- o t al man-rc-::t for moving enc cC<si~
.(2 fuel asser:";b.lies) frc:n Unit. ?~o. 1 spent_ fuel tool lo Unit No. 2 spent
£ 1.!el pool.
For SG assernblics G 2 assemblies/trip, it requir~s 2a trips, Total rnan-rern !or 28 t~ips (
1/3 core) is
,395 rnan-rcrn/trip x 28.
.395 man-re~
--*-~ -- -*-*- -~----** -- -------- ---- *--- -
_.. ___ - -.. -----*--*:a-*---*-
l)
'r'hc 3.5 !!*r/11r dose-rate us~a jn sc-veral. steps of the esti:natc is bas.ea on the case ratC! a:: the !-..;el
?OOl and transfer pool water sur!ace due to one spent fuel azsembly bcjng moved and the dose rate contribution from raclionuclioe>s expected to be* _:in the water.
2}
'.rhc fuel ship?in9 cask dose rates are based orz 49 CFR l 73 limits o! 10 rnrcm/hr at six feet. :from shipping cask*
It is fe~t Uiat this ~s r:-nr~senta ti\\'c.of average radiation !ield operators* ~*ill be exposed to.