Frederick W. Schneider Vice President Production Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 August 22, 1979 Mr. Victor Stello, Jr., Director U.S. Nuclear Regulatory Commission Division of Operating Reactors Office of Nuclear Reactor Regulation Washington, D.C. 20555
Dear Mr. Stello:
NRC IE BULLETINS NO. 79-01 AND 79-0lA NO. 1 UNIT SALEM GENERATING STATION SUPPLEMENTAL RESPONSE Pursuant to our initial response dated March 6, 1979 and our supplemental response of June 15, 1979 on IE Bulletin No. 79-01, the following additional supple-mental information is hereby submitted:
As indicated in our response of June 15, 1979 equipment environmental qualification is being addressed during the Salem Unit #2 reviews.
Accordingly, Table Q7.30, "Inside Containment Safety-Related Equipment" has been updated to include recent tests that have been completed on electrical cable qualification.
Additionally, Table Q7.30 has been expanded to include cable types, manufacturer and associated qualif i9ation documentation for electrical cables.
Attached is a copy of Table Q7.30 incorporating this additional information; additional information, which is applicable to both Salem units.
- '\\.
Mr. Victor Stello, Jr. August 22, 1979 Qualification test reports and analyses are available for staff review.
If you require additional information, we will be pleased to discuss it with you.
Sincerely,
~
Attach.
CC:
Mr. B.H. Grier NRC, King of Prussia, Pa.
Mr. L.J. Norrholm NRC, Hancocks Bridge, N.J.
-1
Table Q7. 30 el'YPE Electrical Power Cables Electrical Power Cables Electrical Power Control Cable Electrical Power Control Cable
~ctrical Power Control Cable Electrical Control t.
Instrumentation Cable cont'd MANUFACTURER Rockbestos Anaconda Okonite Triangle BIW Samuel Moore
& Company FUNCTION -
REQUIRED Electrical power Feeds Electrical Power Feeds Electrical Power & Control Feeds Electrical Power & Control Feeds Electrical Power & Control Feeds Control &
Instrumentation Feeds OPERATION QUALIFICATION LOCA/MSLB
- LOCA
- LOCA
- LOCA
- LOCA
- LOCA
- LOCA
- MSLB DATA REF. DOCUMENTS
-Cert. Test Report - Dated 12/22/76,
-Rockbestos Letter -
Dated 1/24/79
-Test Report No. F-C3341 -
Dated 1/73 & Anaconda Letter Dated 10/18/78
-Test Report No. 141, Dated 2/29/72,
-Okonite Letter -
Dated 7/21/72 & Okonite Letter Dated 2/26/79
-Test Report -
Dated 2/77 and Triangle Letter Dated 8/15/78
-Test Reports No. B910 -
Dated 5/75 & No. 760009 Dated 11/22/76 & BIW Letter Dated 10/19/78
-Test Report No. °F-C3683 Dated 11/73
\\
'J.
I.
Table Q7.30 (Cont'd.)
TYPE MANUFACTURER FUNCTION -
REQUIRED OPERATION QUALIFICATION DATA REF. DOCUMENTS Electrical AIW Power, Control
& Instrumentation Cable NOTE:
COMMENTS Electrical Power Control
& Instrumentation Feeds LOCA/MSLB
- LOCA
- MSLB
-Test Report Dated 9/72
-Test Report Dated 12/75
-Test Report Dated 4/79
- All vital cables inside containment have been qualified to at least 271°F and 2 x 108 rads at 43~2 psig for LOCA environment.
- Thermal analysis have been performed using the same model as VEPCO, which has previously been accepted by the staff.
Results of this analysis show that the peak surface temperature of the worst case cable type is 333°F.
Identical cables, irradiated with a total dosage in excess of that encountered in a MSLB have successfully passed tests at 34QOp for= 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
See response to Sect. 8.4.8(2).
AJG:vlf 08/79 No. F-C3463, No. F-C4197-2, No. F-C5115,