Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
NRC IE BULLETIN NO. 79-10 NO. 1 UNIT SALEM GENERATING STATION*
May 23, 1979 In response to your letter of May 11, 1979, transmitting NRC IE Bulletin No. 79-10 which was received on May 15, 1979, we have investigated this matter with respect to applicability to Salem No.* 1 Unit.
The following are the results of our investigation:
Table No. 1 of Bulletin No. 79-10 has been filled out as requested and is included as Attachment No. 1 to this letter.
It lists complete data for the three requalif ication exam periods which have transpired since Salem Unit No. 1 received its operating license with the following qualifications:
- 1.
Requalification Exam No. 1 was not applicable to operators because none were licensed at the time the exam was administered.
- 2.
Requalification Exam No. 3 data is incomplete because the Salem annual examination is administered such that one-quarter of the 12 exam sections are given every 3 months.
Only the first quarter of Exam No. 3 has been administered at this point in time.
However, complete data has been entered for the first quarter.
- 3.
Items No. 3C and 3D of Table No. 1 are not applicable because no formal oral examination is given in the Requalification Program at Salem.
Mr. Boyce H. Grier 2
5/23/79 If you require additional information, we will be pleased to discuss it with you.
Sincerely, cc: NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
Mr. L.J. Norrholm NRC, Hancocks Bridge, N.J.
-ttachment No. 1 IE Bulletin No. 79-10 Date:
May 11, 1979 TABLE 1 Utility: Public Service Electric and Gas Company Date:
May 15, 1979 Facility: Salem Unit No. 1 Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1
2 3
4 1
2
.3 4
- 1. Action 1: R~sponses A.
Total number failed NA 0
0 0
0 1
annual examination B.
Percent that failed NA 0
0 0
0 6.3 annual examination
- 2. Action 2:
Responses A.
Percent required to NA 83 10.5 63 100 44 attend additional lectures B.
Number of operators NA 14/22 2/2 10/
16/
7/9 attending specified 17 42 number of lectures (no.
of operators/rio. of lectures)
- 3.
Action 3:
Responses A.. Total number attending NA 0
0 0
0 1
accelerated training because < 70 percent on annual written examination B.
Percent attending NA 0
0 0
0 6.3 accelerated training lesson because < 70 percent on annual written examination