ML18079A474

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-10, Requalification Training Program Statistics. Forwards Util Requalification Training Program Statistics
ML18079A474
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/23/1979
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7906290774
Download: ML18079A474 (3)


Text

Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC IE BULLETIN NO. 79-10 NO. 1 UNIT SALEM GENERATING STATION*

May 23, 1979 In response to your letter of May 11, 1979, transmitting NRC IE Bulletin No. 79-10 which was received on May 15, 1979, we have investigated this matter with respect to applicability to Salem No.* 1 Unit.

The following are the results of our investigation:

Table No. 1 of Bulletin No. 79-10 has been filled out as requested and is included as Attachment No. 1 to this letter.

It lists complete data for the three requalif ication exam periods which have transpired since Salem Unit No. 1 received its operating license with the following qualifications:

1.

Requalification Exam No. 1 was not applicable to operators because none were licensed at the time the exam was administered.

2.

Requalification Exam No. 3 data is incomplete because the Salem annual examination is administered such that one-quarter of the 12 exam sections are given every 3 months.

Only the first quarter of Exam No. 3 has been administered at this point in time.

However, complete data has been entered for the first quarter.

3.

Items No. 3C and 3D of Table No. 1 are not applicable because no formal oral examination is given in the Requalification Program at Salem.

Mr. Boyce H. Grier 2

5/23/79 If you require additional information, we will be pleased to discuss it with you.

Sincerely, cc: NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.

Mr. L.J. Norrholm NRC, Hancocks Bridge, N.J.

-ttachment No. 1 IE Bulletin No. 79-10 Date:

May 11, 1979 TABLE 1 Utility: Public Service Electric and Gas Company Date:

May 15, 1979 Facility: Salem Unit No. 1 Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1

2 3

4 1

2

.3 4

1. Action 1: R~sponses A.

Total number failed NA 0

0 0

0 1

annual examination B.

Percent that failed NA 0

0 0

0 6.3 annual examination

2. Action 2:

Responses A.

Percent required to NA 83 10.5 63 100 44 attend additional lectures B.

Number of operators NA 14/22 2/2 10/

16/

7/9 attending specified 17 42 number of lectures (no.

of operators/rio. of lectures)

3.

Action 3:

Responses A.. Total number attending NA 0

0 0

0 1

accelerated training because < 70 percent on annual written examination B.

Percent attending NA 0

0 0

0 6.3 accelerated training lesson because < 70 percent on annual written examination