Monthly Operating Rept for Mar 1979
ML18078B190
Person / Time
Site: Salem 
Issue date: 04/10/1979
From: Miller L
Public Service Enterprise Group
To:
Shared Package
ML18078B189 List:
References
NUDOCS 7904170177
Download: ML18078B190 (15)


Text

{{#Wiki_filter:MO NIH March 1979 DAY AVERAGE DAILY POWER LEVEL (}!We-NET) 1 1005 2 1071 3 1092 4 1110 5 1086 6 982 7 797 8 771 9 1009 10 682 11 1100 12 804 13 958 14 946 15 868 16 995 Pg. 2 of 16 8.1-7.Rl AVERAGE DAILY UNIT POh"I:3 LEVEL DJCKET KO. 5 0-27 2 ~~~~~~~~ UNIT Salem #1 D_A.TE April 10, 1979 CO~lPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 17 684 18 945 19 873 20 937 21 925 22 1045 23 1070 24 104 25 67 26 737 27 1100 28 910 29 1072 30 1105 31 1108 7904170 111

A--- w* DXnT ro. :;__-_5.;..o_-.... 2.;..7.,...2 ____ _ DM'E_

  • _Ap~r_i __ l_-..,..1,,.,.0""",* -.,,..1_9_7_9 __

. ~ -- CCMPLETm BY:_L_. _K_._Mi_' _11_e_r __ _ .. ~: 609-365-7000 X507 _ l. O'nit Nane: -____ Sa_l_em..__#_l_----------,..-- Notes:* 2~ P.epcrtinq Period: March 1979

3.

Licensed The:cra.l Power* (?-fit).: __ ..;:3:,;;:3~3~8 ____ _

4. - Naneplate Ra.tinq (Gl:Css. ~) : ---=1,..1:.:;;3""'5 ____ _

s.. Design: El.ect::d.ca.L Ra.t:i.nq: (Net*~) : _-.=lo:;;,0.;;.90~----

6.. Max:i.nult Dependa.bl.e. Capa.c:!:cy (Gz:css. ~) :_..,.1_1_2_4 __ _
7. Max.immn: l:ependable: Capac:it'f' (Net-~): --1~0~7~9 __ _
a. If Changes: Occur.. in Capacity Ra.tings (Items Num:er-3 'Imcur:;h 7) S.inc:e Last Report,. Give Reason:

NONE. NONE-

9.
  • Pc;wer:- Level To Which* Restrl.cted,, If. Arrr (Net..lofiel :. ---------------------------
10.

Bea.sens _For*Rest:ricticn.S,. If Mly,":


,..~~----------------------------------

. -. - - ~- ll. Sours** In. RepJrting Period. l2- ~Of BoUrs Reactor-Was Critical

13. *_ Reacti::ir Reserve Shutdown EbiJ:rs
14. -Hours -- Genera.tor on.,,Line, -

- *lS. - Unit: Reserve-Shutdown Hours '15.. Gl:Css The:tmal Enel:gy" Generated (W411j ' -, 17. Gross-Electrical -Energy Generated a-Hi) lS. Net Electrical_ Energy Generated (?-Nl)

  • l9. Unit Service Factor 20.; Onit.AvaHability FactOr

~ 2J. *. Unit capa.c:ity Factcr (Using MOC Net)

  • 22:.-. Unit *capa.citj' Factor '(Using DER Net)_>*
23. _*. Ori:i.t Forced Outage Rate' 744 2,160,;

721.3 2,115.4 22.7 22.7 . _7_0_8_. 2___ 2' 093. 4 0 0 2~106,946 6,282,396 701,900 2,114,950 _ __..67.._0...,, __ 9 __ 8 __ 5__;, __ --. 2 ' 024 ' 60 5 - .95.2 96.9 95.2 96.9 83.6 86.9 82.7 86.0 4.8 _3.1 24~. Shllt:downs Scheduled over NeXt 6 MaithS *(Type, 0ate, ana. oura.ti.cn of Ea.ch) = Unit #1 Refueling

  • 4/3/79 -

6/27/79 15,361 9,772.3 22.7 9,391.4 0 27,267,132 9,087,760 8, 611, 585 61.l 61.1 -52.0 51.4 31.5

25.

If.Shut.*O:lwri At Ecd of:RepOrt PeriOd! Estimated Date of Startup: -___ N~V_A _______________...._, __ _ -

  • 26. -- O'nits*i In Testc. Sta:tus (Prior to C(::mrerci.a.l-q;leration) :

- INITIAL CRITJ:CALI'!Y INITIAL ErE:'l'RICIT'1' -~ OPERATI~i

  • Forecast

_9/30/76 11/01/76 12/2*0/76 Achieved 12/11/76 12/25/76 6/30/77 I

00.

DATE 79-120 3/6/79 79-121 3/7/79 79-123 3/7/79 79-127 3/7/79 79-128 3/7/79 79-129 3/8/79 79-130 3/8/79 79-132 3/9/79 79-134 3/9/79 79-137 3/10/79 1 F: Forced s: Scheduled Page 4 of 16 8-1-7.Rl TYPEl F F F F F F F F F F 2 UNIT Sl~S AND ro'lER ~IONS mroRr MJlmt March 19 7 9 Mgl'l[)I) OF OORATIOO smnT!m LICENs~ (lams) ~ COIN iMNr. REAC'IDR 0.0 A 4A 0.0 A 4A 0.0 A 4A 0.0 A 4A 0.0 A 4A o.o A 4A o.o A 4A 0.0 A 4A 0.0 A 4A 0.0 A 4A Reason: A-DJui?IEllt Faiiure(El<plain~ B-Maintenance or Test C-Refueling tIBroRT. I (>-Regulatory Restriction E-operator Training & License EKaminatit>n F-1\\dministrative G-{\\>erational Error(El<plain) II-other (El<plain) j SYSTEM cntPOOENl' oooE'I OODE~ HH HTEXCH HH HTEXCH HF FIL'IER HH HTEXCH HH HTEXCH HH HTEXCH HH HTEXCH HH HTEXCH HH HTEXCH HH HTEXCH ~thod: 1-Manual 2-Manual Scram. 3-Autanatic Scram. 4-0ther (El<plain) DOCKET NO. 1 5 0- 2 7 2 ~~--'-~~~~~-

  • UN IT 'NAME:

Salem #1 ~~~..:;,,__~~~~ DATE: April 10, 1979 .COMPLETED BY: L. K. I"'.liller TELEPHONE: 609-365-7000 X507 CAUSE AND a>RRl!rl'IVE ACTION '10 PREVENr RmJRRENCE 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. . 13B Circ., traveling screen problems

  • 13B Cond., cleaned waterbox.

13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. 4 5 Exhibit G - Instructions for Preparation of Data Eiitry Sheets for Licensee Event Report(IER) File (NUR00-0161) Exhibit 1-Sane Source A... IDAD REDUCTION B. CONTINUATION OF. PREVICXJS OUTAGE.

NO. 79-141 79-153 79-154 79-156 79-159 79-161 79-163 79-169 DATE 3/12/79 3/15/79 3/17/79 3/17/79 3/19/79 3/20/79 3/20/79 3/24/79 Page 5 Of 16 8-1-7.Rl TYPEl F F F F F F F F OOR/\\TION RFASOif (HOURS) o.o A 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A 35.8 A UNIT SIR.JTIXMNS 1\\ND PCMER IIBDUCrIONS REPORI' f>'DNT!i March 1979 MIITHOD OF SHUITING LICENSE SYSTEM CilWONENT IJa'IN EVENT CODE4 CODES REAC'IDR REPORT II 4A HF FILTER 4A HH HTEXCH 4A HH FILTER 4A HH FIJ..TER. 4A HH HTEXCH 4A HH HTEXCH 4A HH HTEXCH 3 HA INSTRU DOCKET NO. : -'5--'0_-_2-'-7_2 _____ _ UNIT'Nl\\ME: Salem #1


~

DA.TE: April 10, 1979 COMPLETED BY: L. K. tii... ll~er,.,.__ __ TELEPHONE: 609-365-7000 X507 CAUSE AND CORRECTIVE ACTION 'ID PREVENI' REUJRRENCE 13A Circ., to retrieve screen bucket. 13B Cond., cleaned waterbox. llSGFP, cleaned strainers. llSGFP, cleaned strainers. I ' 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. 13B Cond., cleaned waterbox. Voltage regulator failed on Main Generator.

. MAJOR PLANT MOD.CATIONS REPORT MONTH .. narch 19 7 9

  • DCR NO.

PRINCIPLE SYSTEM lMD-0135 Non-vital Heat Tracing

  • DESIGN CHANGE REQUEST R-l-7 Rl I

CKET NO.: 50-272 IT NAME: Salem. #1 ~~~~-'--'-~~~~- DATE: April 10, 1979 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 X507 SUBJECT Modify Circulating Water Heat Tracing Page 6 of 16

M..~OR PLANT MODIF~ATIONS REPORT MONTH Mall'n 1979

  • DCR NO.

10CFRSO. 59: lMD-0135 This DCR will not affect any DOCKET NO.: -IT. NAME: DATE: 50-272 Salem #1 April 10, 1979 COMPLETED BY: L. K. Miller TELEPHONE: 609-3 65-7000 X507 SAFETY EVALUATION safety function of the system involved. The proposed changes do not involve any of the criteria associtated with an unreviewed safety question per 10 CFR 50.59. "'\\ ___ Page 7 of 16

SUMMARY

OF SAFETY RELA.D MAINTENANCE DEPARTMENT Perfonnance DOCKET NO. : 50-272 m9* NAME :_Sa_l_em--#-1-------- DATE : April 10, 1979 REPORT MONTH March 1979 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO. 900264 N41 Power range High voltage reading low, Replaced CR36 and calibrated. drawer. N:> alarm. 900297 N44 Power range Upper flux signal high. calibrated. drawer. 900309 13 Loop overpower Erratic indication. Replaced module and calibrated. 6T. 902723 FH Pool vac. clean-.Install pressure gauge and Completed. er discharge.* .. tap.: 903202 Pump' 13 Auxiliary Could not trip. Replaced relay contactors. Feed.water. 903519 i'IC0130. Setpoint drifts. Replaced controller. I 904169 1LT0460A/B. Investigate. Replaced electronic parts. 904195 l'IC0431. Trips out of spec. calibra~ed. 904503 1PD1562. Alarm will not clear. Calibrated. I 904538 Valve, 11SW015. N:> position indication. Replaced failed parts. 904539 Annunciator, 14 Alarm will not reset. Adjusted limit switch. Cont. fan cooler. 904542 N41 Power range Channel faile:l. Replaced High Voltage Power drawer. Supply. 904586 12 S/G Feed.water Erratic indication. Tightened loose connection. flow ind. Page 8 of 16

DOCKET N0.:~5~0~~2~7~2~~~~~-------

SUMMARY

OF SAFETY RELA.D MAINTENANCE,-* DEPARTMENT Perfonnance m9* NAME : __ Sa_l_em

  1. _l _______ _

DATE : April 10, 1979 REPORT MONTH March 1979 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO. I 904731 1.XA8740. Reset Limits. calibrate:i. 904776 1FM532C. 1FC0530A/B out of spec. calibrate:i. 904777

  • 1FM522C.

1FC0520A/B out of spec. calibrate:i. 904779 1PC0942. out of spec. calibrate:i. . 904780 1BS0424. Trip point out of spec

  • Calibrate:i.
  • ~...

904782 1BS0434. Trip point out of spec. Calibrate:i. 904784 1TIC0103. out of calibration. calibrate:i. 904785 1LT0931. a.it of calibration. calibrate:i. 904822 1FQ0462. out of Spec. Replace:i Module. Page 9 of 16

DOCKET NO. : 50-272


~

SUMMARY

OF SAFETY RE~D MAINTENANCE DEPARTMENT Maintenance NAME : __ sa_1_em

  1. _1 _______ _

DATE: April 10, 1979 COMPLETED BY: L. K. Miller REPORT MONTH March 1979 TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO. 901269 Airlock, 130' El. Air leakage. Reseated door seals. Containment. 903286 Valve,

  • 11RC027.

Pack.mg gland leaks. Installed split ring and packing. 903351 Pump, 12 Boric acid.Mbtor contactor will not Tightened connection

  • concentrates.

pick up. 903834 Pump, 16 service Investigate vibration. Replaced motor. water. ~.., ' 904592 Pump, 14 service Replace broken shear pin. Replaced wear shoes, shear key. water. 904629 -Compressor, 11.

  • * "Feed breaker. will not close Replaced breaker cranking motor *.

waste gas

  • I

'I

  • I Page 10 of 16

SALEM UNIT I OPERATING

SUMMARY

MARCH 1979 3-1 Unit load increase in progress. 1130 - Unit load was 98% and remained so for the day. 3-2 Unit load was greater than 98%. 3-3 thru 3-5 3-6 1912* - Load was reduced to 94% in preparation for cleaning condenser water boxes. 1405 - Unit load increase was commenced. 1430 - Unit load was greater than 98%. Unit load was greater than.98%. 2115 - Unit load decrease due to high condenser back pressure. 2245 - Reduction was stopped at 68%. 3-7 0400 - Unit load increase started at 3% per hour. 1955 - Started load reduction from 78% due to high condenser back pressure. 2115 - Started load increase at 3% per hour. 3-8 Unit load continuing to increase.at 3% per hour. 1045 - Increase stopped at 92% due to 12B circulator out of service. Page 11 of 16

e 3-8 1400 - Unit load decrease due to 13B condenser cleaning. con't 1800 - Unit load decrease stopped at 73%. 3-9 0300 - Started load increase at 3% per hour; stopped at 92% due to 12B circulator out of service. 1340 - Started load decrease in preparation for 13B condenser cleaning. 2015 - Started load increase; stopped at 90% due to llA circulator out of service. 3-10 0223 - Started load decrease to 79% due to high differential on 13B circulator. 1430 - Started load increase to 100% at 3% per hour. 2134 - 100% power. 3-11 Unit load was 99% for the day. 3-12 Started load decrease to 65% for condenser cleaning. 0850 - Stopped load reduction at 65.5%. 1350 - Started load increase at 3% per hour. 2130 - Stopped load increase at 88% power due to 13B screen out of service for repairs. 3-13 Power level was 88% all day. 3-14 1156 - Load decrease to repair #11 governor valve. Page 12 of 16

3-14 con~t 3-15 3-16 3-:::17 3-18 3-19 1500 - Load decrease stopped at 85% reactor power. 2130 - Load decrease to 75% to clean 13B condenser. 0300 - Started load increase at 3% per hour to 92%. Stopped due to 13A circulator out of service. 1520 - Load decrease to clean condensers. 1930 - Stopped load decrease at 75% reactor power. 2057 - Started load increase. 0255 - Stopped load increase at 92% reactor power. Stayed .at 92% for the rest of the day due to 13A circulator out.of service. 0100 - Load decrease to clean feedwater strainers. 0840 - Stopped load decrease at 54% reactor power. 1315 - Started load increase at 3% per hour. 2230 - Stopped load increase at 92% reactor power due to 13A circulator out of service. 1730 - Load decrease due to 13A & 12B circulators out of service. 0030 - Stopped load decrease. at 64%. 0330 - Load increase started. 1200 - Stopped load increase at 92% power due to 13A circulator out of service. 2330 - Load decrease to clean 13B condenser. Page 13 of 16

3-20 3-21 3-22 3-23 3-24 3-26 3-27 0400 - stopped load decrease at 76% reactor power. 0600 - Started load increase. 1100 - Stopped load increase at 91% reactor power due to 13A circulator out of service. 2100 - Load decrease to clean 13B condenser waterbox. 0133 - Stopped load decrease, reactor power at 76%. 0325 - Load increasing to 92% reactor power. 0900 - Load increase stopped, reactor power at 92%. Remained there rest... of day due to 13A circulator out of service. 0500 - Load increased from 92% to.100% reactor power; remained there all day. Load at 100% reactor power all day. 0256 - Reactor trip from 100% power., 0% power rest of day. 0138 - Reactor taken critical. 1441 - Turbine synch~onized. 1800 - 33.5% reactor power. 2200 - Load increasing at 3% per hour. 1700 - Stopped load increase at 95%; waiting for steady state conditions to take a flux map. 95% reactor power all day; waiting for steady state conditions Page 14 of 16

3-27 con't 3-28 3-29 3-30 3-31 for a __ flux map. 1000 - Flux map taken, increasing power to 100%. 1310 - Load decreased to 86% :;l'.'eactor power due to 13B & 12B circulator. emergency trip due to high 6P. 1400 - Load decrease stopped at 92%. 1600 - Load increase to 100% reactor power. 100% reactor power all day. 100% reactor power all day. Page 15 of 16

March 1979 e* REFUELING INFORMATION DOCKET NO. : 50-272 ~~.-.....------~-- UN IT: Salem #1 DATE: April 10, 1979 COMPLETED BY:. L. K. Miller TELEPHONE: 609-365-7000 X507

1.

Refueling* information has changed from last month: YES X NO

2.

Scheduled date. of next refueling: April 3, 1979 ~--~------------------------------- 3.. Scheduled date* for restart following refueling: June 27, 1979 4.. A.

  • Will Technical Specification changes or other license
  • amendments be required?

YES x NO --- NOT: DETERMINED TO-DATE


~-

B.

  • Has,* the reload fuel design been reviewed by.. the Station Operating Review Committee?

YES x NO --- If no, when is it scheduled? 5 *. *Scheduled date (s) for submitting proposed licensing action: Submitted March 1979 6.. Importan.t licensing considerations. associated with refueling: NONE

7.

Number of Fuel Assemblies: . 8.

9.

A. In-core B. In Spent Fuel Storage

  • Present licensed spent fuel storage *capacity:.

Future spent fuel storage capacity: Date of *last refueling that can be discharged pool* assuming** the present licensed *capacity:.. Page 16 of 16 8-l-7.R4 193 0 264 ~------------------~-- 1,170 to the spent fuel April 1982}}