MONTHYEARML24270A0652024-09-26026 September 2024 ABWR Design Certification Annual 10 CFR 50.46 Report for 2024 ML23283A0892023-10-10010 October 2023 ESBWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML23277A1702023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ESBWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML22347A2842022-12-0808 December 2022 GE-Hitachi Nuclear Energy Americas, LLC, Accepted Version of NEDO-11209-A Revision 17, GE Hitachi Nuclear Energy Quality Assurance Program Description ML21320A1902021-11-16016 November 2021 Pre-Application Presentation Slides for Amendment to NEDO-11209-A, Rev. 16, GE Hitachi Nuclear Energy Quality Assurance Program Description ML20197A2692020-07-15015 July 2020 Pre-application Presentation Slides for Amendment to NEDO-11209-A Revision 15, GE Hitachi Nuclear Energy Quality Assurance Program Description ML20184A1582020-07-14014 July 2020 Verification of Accepted Version of NEDO-11209 Revision 15, GE Hitachi Nuclear Energy Quality Assurance Program Description ML20093B4532020-04-0202 April 2020 GE-Hitachi Nuclear Energy Americas, LLC - Revision of the GE Model No. 2000 (Docket No. 71-9228) to Clarify Irradiated Hardware Content and Update the Quality Assurance Program References ML19242D0982019-09-19019 September 2019 General Electric Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19242D6962019-09-19019 September 2019 Verification of NEDC-33173P Supplement 6 Revision 1, Licensing Topical Report Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty ML19199A1822019-08-0808 August 2019 Final Safety Evaluation for NEDC-33173P Supplement 6 - Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Raito (SLMCPR) Penalty ML19094A0582019-04-25025 April 2019 Verification of GE Hitachi Topical Report NEDC-33173 Supplement 5p-A, Revision 1, Applicability of General Electric Methods to Expanded Operating Domains - Supplement for GNF3 Fuel ML19094A9182019-04-25025 April 2019 General Electric Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19071A1012019-03-26026 March 2019 Draft Safety Evaluation for NEDC-33173p Supplement 6 - Applicability of General Electric Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio Penalty ML19074A0542019-03-21021 March 2019 Imltr Supplement 5 Final SE Non-Proprietary ML19016A4072019-03-0505 March 2019 GE Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19017A0432019-03-0505 March 2019 GE Hitachi Nuclear Energy Americas, Llc, Request for Withholding Information from Public Disclosure ML19002A3762019-02-0505 February 2019 Draft Safety Evaluation for NEDC-33173p Supplement 5 and Applicability of GE Methods to Expanded Operating Domains and Supplement for GNF3 Fuel ML18155A2102018-06-22022 June 2018 Verification of GE Hitachi Topical Report NEDE-33005P-A, Revision 2 Tracg Application for Emergency Core Cooling Systems/Loss-of Coolant Accident Analysis for BWR/2-6 ML18129A0242018-05-11011 May 2018 Final Safety Evaluation for Licensing Topical Report Nede 33005P-A / NEDO-33005-A, Tracg Application for Emergency Core Cooling Systems / Loss-Of-Coolant-Accident Analysis for BWR/2-6 Satisfaction of Limitation 10.7 ML18117A3112018-04-27027 April 2018 Draft Safety Evaluation for Licensing Topical Report NEDE-33005P-A / NEDO-33005-A, Tracg Application for Emergency Core Cooling Systems / Loss-of-Coolant-Accident Analysis for BWR/2-6 Satisfaction of Limitation 10.7 ML18078A5872018-04-10010 April 2018 Satisfaction of TRACG-LOCA Limitation 10.7 Draft SE Cover Letter ML18046A6392018-03-0606 March 2018 Proprietary Determination Letter for TRACG-LOCA Satisfaction of Limitation 10.7 RAI Response ML18002A4322018-01-10010 January 2018 Final SE for Amendment to NEDO-11209 Revision 13 GE QAPD ML17332A6012018-01-0909 January 2018 Proprietary Determination Letter for NEDC-33840P-A, Prime Model for Transient Analysis ML17342A1012018-01-0909 January 2018 Proprietary Determination Letter for Nsf Annual Experience Summary Report ML17347B1992018-01-0909 January 2018 GNF2 Compliance Report Proprietary Determination Letter ML17332A2962018-01-0505 January 2018 Final Safety Evaluation for Global Nuclear Fuel - Americas, LLC, Proposed Amendment 44 to NEDE-24011-P-A-24 ML17341A9432018-01-0505 January 2018 Verification Letter for the Approved Version of NEDC-33840P (Prime) 2024-09-26
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION April 10, 2018 Mr. Jerald G. Head Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-18 Wilmington, NC 28401-0780
SUBJECT:
DRAFT SAFETY EVALUATION FOR LICENSING TOPICAL REPORT NEDE-33005P-A / NEDO-33005-A, TRACG APPLICATION FOR EMERGENCY CORE COOLING SYSTEMS / LOSS-OF-COOLANT ACCIDENT ANALYSIS FOR BWR/2-6 SATISFACTION OF LIMITATION 10.7 (EPID: L-2017-TOP-0036)
Dear Mr. Head:
By letter dated February 13, 2018 (Agencywide Documents Access and Management System Accession No. ML18044A156), GE Hitachi Nuclear Energy - Americas (GEH) submitted Response to Request for Additional Information Regarding Review of Satisfaction of Limitation 10.7 for NEDE-33005P, Revision 0, Licensing Topical Report TRACG Application for Emergency Core Cooling Systems / Loss-of-Coolant-Accident Analyses for BWR/2-6, to the U.S. Nuclear Regulatory Commission (NRC) staff for review. Enclosed for GEH review and comment is a copy of the NRC staffs draft safety evaluation (SE) for the review of Satisfaction of Limitation 10.7.
We are providing you with the opportunity to comment on any proprietary aspects. If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of Title 10 of the Code of Federal Regulations 2.390. Twenty working days are provided for you to comment on the proprietary aspects and any factual errors or clarity concerns contained in the draft SE. The final SE will be issued after making any necessary changes and, if any proprietary information is identified, a non-proprietary version will be made publicly available. The NRC staffs disposition of your comments on the draft SE will be discussed in the final SE.
NOTICE: The enclosure transmitted herewith contains Proprietary Information.
When separated from the enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION J. Head To facilitate the NRC staffs review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Joseph Golla at 301-415-1002.
Sincerely,
/RA/
Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902024
Enclosure:
Draft SE cc w/o encl: See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
ML18078A587 (Cover Letter); ML18078A636 (Draft SE, Proprietary);
ML18078A668 (Package); *concurrence via e-mail NRR-043 OFFICE PLPB/PM PLPB/LA* SNPB/BC (A) PLPB/BC NAME JGolla DHarrison SAnderson DMorey DATE 4/4/2018 3/29/2018 4/6/2018 4/10/2018 OFFICIAL USE ONLY - PROPRIETARY INFORMATION GE-Hitachi Nuclear Energy Americas Docket No. 99902024 cc:
Dr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel-Americas, LLC P.O. Box 780, M/C A-75 Wilmington, NC 28401-0780 Brian.Moore@gnf.com Mr. James F. Harrison GE-Hitachi Nuclear Energy Americas LLC Vice President - Fuel Licensing P.O. Box 780, M/C A-55 Wilmington, NC 28401-0780 james.harrison@ge.com Ms. Patricia L. Campbell Vice President, Washington Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 1299 Pennsylvania Avenue, NW 9th Floor Washington, DC 20004 patricial.campbell@ge.com OFFICIAL USE ONLY - PROPRIETARY INFORMATION