ML18075A385

From kanterella
Jump to navigation Jump to search
Presentation
ML18075A385
Person / Time
Issue date: 01/26/2018
From: Chernoff H
NRC/NRR/DIRS/IRGB
To:
Govan T
References
RIS-02-022, Supp 1
Download: ML18075A385 (6)


See also: RIS 2002-22

Text

Public Meeting Regarding Draft Regulatory Issue Summary

2002-22, Supplement 1, Clarification on Endorsement of

Nuclear Energy Institute Guidance in Designing Digital

Upgrades in Instrumentation and Control Systems

January 26, 2018

Harold Chernoff, Chief

ROP Support and Generic Communications Branch

Office of Nuclear Reactor Regulation

U.S. Nuclear Regulatory Commission

1

Agenda

  • Introductions and Opening Remarks
  • Overview of Draft Regulatory Issue Summary (RIS)
  • Stakeholder Feedback on Draft RIS
  • Additional Stakeholder Feedback and Questions

2

Draft RIS Overview

  • Revised discussion of relationship of sufficiently low

likelihood to the criteria of 10 CFR 50.59(c)(2)(i, ii, v,

and vi)

  • Qualitative assessment discussions supporting the 10

CFR 50.59 process separated into Sections 2, 3, and 4

  • Engineering design process discussion consolidated

into Section 5

documentation

3

Draft RIS Overview (continued)

- Expanded process discussion

- Analysis/reanalysis of results in accordance with existing

design and licensing basis methods

  • Removed discussion of process for determining safety

significance

  • Added engineering process discussions that in some

cases introduce approaches not described in NEI 01-01

  • Removed RIS Decision Tree Flowchart

4

Stakeholder Feedback

  • Section by Section
  • General Feedback

5

Questions?

6