.Mr .. Thomas J. Palmisano
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Ill
801 WARREINILLE ROAD
LISLE, ILLINOIS 60532-4351
March 5, 1999
Site Vice President and General Manager
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, Ml 49043-9530
SUBJECT:
PALISADES INSPECTION REPORT 50-255/99001 (DRP)
Dear Mr. Palmisano:
On February 25, 1999, the NRC completed an inspection conducted at your Palisades Nuclear
Generating Plant. The enclosed report presents the results of that inspe~tion.
The inspection coveted a 6-week period. Areas examined during the inspection are identified in
the report. Within these areas, the inspection consisted of a selective examination of
procedures and representative records, interviews with personnel, and observations of activities
in progress. The purpose of the inspection effort was to determine whether activities authorized
~*- ..
.. , .. ':. *~;~~>:!:,\\
. * ..
by the license were conducted safely .and in accordance with NRC requirements.
- *
.
.
- ... *
.
- .
. .
. ..
.
~ . -
' . :* .; *
', .... ' ;**.1 .
During this inspection period; the conduct of operations continued to be professional. Control
room operators were aware of ongoing plant activitie$ and pl a ht equipment configuration J-,:c< .: :: ** * -*
., ** **
Though the overall material condition of the plan*t was adequate, your staff missed severaf
opportunities to identify plant equipment material condition deficiencies. Of particular concern
were the deficiencies identified by the inspectors on the $pent Fuel Pool Cooling. system.
Specifically, the problems were located in a normally accessed area of the plant, butplant staff
failed to identify the problems. Your continued emphasis appears warranted to ensure that
. equipment deficiencies are promptly identified and appropriate corrective actions are initiated to
address the problems.
No violations or deviations of NRC requirements were identified.
.. *----- ------- *-- -
-*- -*-- -- ---*- ------ -
9903160022 990305
ADOCK 05000255
- a
.PDR
\\\\
___ \\
- ,
/
T. Palmisano
-2-
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ Anton Vegel
Anton Vegel, Chief
Reactor Projects Branch 6
. Docket No.: 50-255
License No.: DPR-20
Enclosure:
Inspection Report 50-255/99001 (DRP)
cc.w/encl:
R. Fenech, Senior Vice President, Nuclear
Fossil and Hydro Operations .
N. Haskell, Director, Licensing
R. Whale, Michigan, Public Service Commission
Department of A~orney G~neral (Ml) .
E_mergency Management Division, Ml Department
- * ot state Police.
- '
- * , .. ** * * * :
DOCUMENT NAME: G:\\PALl\\PAL99001.DRP
. To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =
Copy w/attach encl "N" = No co PY
OFFICE
Riii
I
I
I
-NAME
ve1re11ni1--*fr'/-- --------*
-~~---- -
DATE
03/ s /99
OFFICIAL RECORD COPY .
. ~ '* .*' .,
- 1.f
.. -: -~: *--:*~~,;..:. .. ;
.~.-
T. Palmisano
Distribution:
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/encl
J. Caldwell, Riii w/encl
B. Clayton, Riii w/encl
SRI Palisades w/encl
DRP w/encl
DRS (2) w/encl
RJIJRB~_.w/~nc!_.,m;~F
- f!P.a-i'.Jc'JE~b f'w7e'nc1
Docket File w/encl
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)
'
.
(\\ (\\ *\\ -
lGu1...:vJ *
.. ,_ .....
-3-
._ .......
. -~~:.
. '
- .
- f
.
~ -. :=:: :: _.
,_ .. - .. *
-~
-.:
'
.
.