ML18067A568

From kanterella
Jump to navigation Jump to search
Forwards Revised Valve Relief Request 28 for Approval in Accordance W/Requirements of 10CFR50.55a(a)(3)
ML18067A568
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/03/1997
From: Bordine T
CMS ENERGY CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9706100342
Download: ML18067A568 (6)


Text

j.a 1'

A CMS Energy Company June 3, 1997 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT

. INSERVICE TESTING PROGRAM - VALVE RELIEF REQUEST 28 111oma* t:. BonllDB Manager Licensing On March 5, 1996, Consumers Energy submitted its third 120-month interval inservice testing (IST) program for the Palisades Plant. On August 30, 1996, the NRC responded with their evaluation of the relief requests contained in that program. This evaluation reached the conclusion that valve relief request (VRR) No. 28 was denied.

A revised VRR No. 28 is attached for approval in accordance with the requirements of 10 CFR 50.55a(a)(3). This VRR has been revised to include the information missing in the March 5, 1996, submittal.

Approval of this VRR is requested prior to January 23, 1998, to allow planning for the 1998 refueling outage scheduled to commence in May, 1998.

Palisades Nuclear Plant

  • 27780 Blue Star Memorial Highway
  • Cov111/, Ml 49043
  • Tel: 616 764 2913
  • Fax: 616 764 2490

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment 2

ATTACHMENT CONSUMERS ENERGY COMPANY PALISADES PLANT DOCKET 50-255 INSERVICE TESTING PROGRAM - VALVE RELIEF REQUEST 28 3 Pages 1

RELIEF REQUEST BASIS NUMBER 28 SYSTEM:

Engineering Safeguards M-201-2 Component Cooling M-209-2 & M-221-2 VALVES:

RV-0402, RV-0403, RV-0954, RV-0955, and RV-2109 CATEGORY:

c CLASS:

2 and 3 FUNCTION:

RV-0402 and RV-0403 provide tube side thermal overpressure protection for the Shutdown Cooling Heat Exchangers.

RV-0954 and RV-0955 provide shell side thermal overpressure protection for the Shutdown Cooling Heat Exchangers.

RV-2109 provides shell side thermal overpressure protection for the Spent Fuel Pool Heat Exchangers.

TEST REQUIREMENT:

The scope of OM-1987, Part 1 includes pressure relief devices that are required to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident.

OM-1987, Part 1, Paragraph 1.3.4 requires periodic testing of Class 2 and 3 pressure relief devices.

a.
  • All valves of each type and manufacture shall be tested within each subsequent 1 O year period.
b.

A minimum of 20% of the valves shall be tested within any 48 months.

BASIS FOR RELIEF:

Relief is requested in accordance with 1 OCFR50.55a(a)(3) from testing RV-0402, RV-0403, RV-0954, RV-0955, and RV-2109 on the basis that the proposed alternative will provide an acceptable level of quality.

1

RELIEF REQUEST BASIS NUMBER28

  • Complying with the Code is impractical. RV-0402, RV-0403, RV-0954, RV-0955, and RV-2109 are designed to protect the Shutdown Cooling Heat Exchangers and the Spent Fuel Pool Heat Exchangers from thermal expansion of water when the exchangers are isolated for maintenance or inspection. These thermal relief valves have no safety function when the heat exchangers are in service.

The associated heat exchangers must be isolated to remove these thermal relief valves. However, the Shutdown Cooling Heat Exchangers cannot be isolated during power operations, nor isolated when there is fuel in the Reactor Vessel.

An alternate means of cooling the Spent Fuel Pool would be required to isolate the Spent Fuel Pool Heat Exchangers.

Compliance would result in a hardship without a compensating increase in safety. RV-0402, RV-0403, RV-0954, and RV-0955 are welded in, and are located in a. high radiation area. Removal testing and reinstallation would cause an increase of radiation exposure to plant staff. RV-0402, RV-0403, RV-0954, RV-0955, and RV-2109 do not provide overpressure protection when the associated heat exchanger is in service, nor do they serve a safety function during Plant operation to ensure the reactor can be safely shutdown or to mitigate the consequences of an accident. These relief valves are only needed when the associated heat exchanger is isolated. Therefore; there is no benefit in verifying the set point for these relief valves while the heat exchangers remain in service. In lieu of the 10-year periodic testing required by OM-1987, these relief v~lves will be tested on the basis of need during periods of isolation of the heat exchangers.

ALTERNATIVE TESTING:

Each time Shutdown Cooling Heat Exchanger E-60A is removed from service and isolated for maintenance or inspection, RV-0402 and RV-0954 will be tested in accordance with OM-1987, Part 1, Section 8 unless they have been tested within the last 48 months.

Each time Shutdown Cooling Heat Exchanger E-608 is removed from service and isolated for maintenance or inspection, RV-0403 and RV-0955 will be tested in accordance with OM-1987, Part 1, Section 8 unless they have been tested within the last 48 months.

Each time Spent Fuel Pool Heat Exchangers E-53A and E-538 are removed from service and isolated for maintenance or inspection, RV-2109 will be tested 2

RELIEF REQUEST BASIS NUMBER28

  • in accordance with OM-1987, Part 1, Section 8 unless it has been tested within the last 48 months.

ACCEPTANCE CRITERIA:

Acceptance Criteria for the testing of RV-0402, RV-0403, RV-0954, RV-0955, and RV-21'09 shall be established in accordance with Palisades Nuclear Plant Permanent Maintenance Procedure MSM-M-60, "ASME Safety/Relief Valve Testing for Valves Included in ASME Section XI Scope."

Additional actions for valves that fail "As Found" set point testing are specified per Palisades Nuclear Plant Engineering Manual Procedure EM-09-02, "lnservice Testing of Plant Valves."

STATUS:

This relief request requires prior NRC approval in accordance with the provisions of 1 OCFR50.55a(a)(3).

3