ML18067A487

From kanterella
Jump to navigation Jump to search
Submits Personnel & Organizational Changes at Plant.Revised Mailing Lists as Indicated
ML18067A487
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/15/1997
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9704220241
Download: ML18067A487 (3)


Text

.., ; ! ;.. :*

'* ~.

A CMS Energy Company

.., -,,,.,u,. t:. Bonllae' Manager

*.,... 1 -..
  • r....,

.1..*.

.\\ ~*.: : : :_.
  • uc~nsirig ;.~ )'.';
  • w

'1"1 :.

  • /' ****

I April 15, 1997 U.S. Nuclear 'Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 _

I DOCKET 50-255 - LICENSE DPR PALISADES PLANT PERSONNEL AND ORGANIZATIONAL CHANGES Consumers Energy Company is pleased to announce several organization changes which affect senior management responsible for operation of the Palisad~.s Plant.

Robert A. Fenech has been named Senior Vice President, Nuclear, Fo~sil and Hydro Operations. Mr Fenech was previously the Vice President, Nuclear Operations. In his new role, he will continue as the Chief Nuclear Officer for Consumers Energy, and will continue to report to David W. Joos, Executive Vice President and Chief Operating Officer - Electric. Reporting directly to Mr Fenech will be the Site Vice President -

Palisades; the Manager, Nuclear Performance Assessment; and the General Manager, Big Rock Point.

Thomas J. Palmisano has been named the Site Vice President - Palisades. Mr Palmisano was previously the Palisades Plant General Manager.

A number of changes have also been made to the Palisades site organization reporting to Mr. Palmisano. The positions that affect plant operations, modifications and maintenance are as follows:

David W. Rogers has been named General Manager - Plant Operations. Mr Rogers was previously the Plant Operations Manager. Reporting to Mr Rogers will be the Shift Operations Supervisor, the Chemistry and Radiological Services

~

Manager, and the Training Manager.

I

(--9-70--4-2-20_2_4_i-,-9-. 704;;15.* LJ l

MOD~ 0

-l -

~DR ADOC~ ~05000255 t

1111m11m1imp1n.m~~m11111111

( - I

_____________ PDR 1

Palisades Nuclear Plant

  • 27180 Blue Star Memorial Highway
  • CovtHI, Ml 49043
  • Tel: 616 764 2913
  • Fax: 616 764 2490

(

Daniel P. Fadel has been named Director of Engineering. Mr Fadel was previously the System Engineering Manager. Reporting to Mr Fadel will be the System Engineering Manager, the Design Engineering Manager, the Engineering Programs Manager, and the Nuclear Engineering Manager.

Steven T. Wawro has been named Director of Maintenance & Planning. Mr.

Wawro was previously the Planning & Scheduling Manager. Among those reporting to Mr Wawro is the Maintenance Manager.

Jackson L. Hanson has been named Director, Strategic Business Issues.

Among those reporting to Mr. Hanson are the Licensing Manager and the Projects and Construction Manager.

Carolyn R. Ritt has been named the Director of Plant Support. The plant security organization is among those functions reporting to Ms. Ritt.

To reflect these changes, NRC Headquarters and Region Ill are requested to revise mailing lists as follows:

Corporate Address Mr. Robert A. Fenech Senior Vice President Nuclear, Fossil and Hydro Operations Consumers Energy Company 212 West Michigan Avenue Jackson, Michigan 49201 Palisades Plant Addresses Please address all plant-specific and generic Headquarters and Region Ill correspondence to:

Thomas C. Berdine Licensing Manager Palisades Plant 27780 Blue Star Memorial Highway Covert, Michigan 49043 cc:

Thomas J. Palmisano Site Vice President Palisades Plant 27780 Blue Star Memorial Highway Covert, Michigan 49043 2

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

Thomas C. Berdine Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades 3