Forwards Insp Rept 50-255/96-12 on 961016.No Violations Noted
ML18066A797
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/11/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18066A798 List:
References
NUDOCS 9612270100
Download: ML18066A797 (3)


See also: IR 05000255/1996012

Text

Mr. T. Palmisano

General Manager

Palisades Nuclear Generating Plant

December 11, 1996

  • 27780 Blue Star Memorial Highway

Covert, Ml 49043-9530

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/96012(DRS)

Dear Mr. Palmisano:

On October 16, 1996, the NRC completed an inspection at your Palisades Nuclear *

Generating Plant. The enclosed report presents the results of that inspection. * *

The inspection covered a ten day period. The area examined during the inspection was the .*

effectiveness of your controls in identifying, resolving and preventing issues that degrade

the quality o.f plant operations*or safety problems. The purpo*se of the inspe'.ction*.was to

_determine whether activities authorized by the license were conducted safely and in

accordance with NRC requirements ..

In response to NRC concerns raised in Diagnostic Evaluation Team Inspection Report 50-

255/94014 regarding management's ineffective involvement in plant activities and

inadequate guidance to plant personnel, you initiated a number of improvement initiatives.

The inspectors concluded that progress had been made in establishing effective self-

assessment in the a.reas of operations and engineering. With respect to self-assessments

and audits, the processes arid the performance observed were sound with some

exceptior:is. In most cases, proble_m identification appeared to be satisfactq.ry. We._:**':* . ,

understand* that you are working to further improve the performance of your corrective

action process. You are encouraged to continue your progress in this area and reminded

that your attention to timely and thorough corrective actions must be maintained.

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of tbis letter

and the enclosed inspection report will be placed in the NRC Public Document Room.

Sincerely,

Original signed by Geoffrey E. Grant

Docket No. 50-255

Enclosure:

Inspection Report

No. 50-255/96012(DRS)

See Attached Distribution

Geoffrey E. Grant, Director

Division of Reactor Safety

DOCUMENT NAME: G:\\DRS\\PAL96012.DRS

(SEE PREVIOUS CONCURRENCE)

To receive a copy of this document, Indicate In the box *c* = Copy without attachment/enclosure "E" = Copy with attachment/enclosure

"N" = No copy

OFFICE

Riii

I

Riii

I

Riii

I

Riii

I

Riii

~ I

NAME

RLerch:nh

MRing

RGardner

LMiller

-

HClay4*

~ ~rant

DATE

12/ /96

12/ /96

12/ /96

12/ /96

rn

1 2/l\\ /~ l )

-

. --* ... , - -****--*----- *- .. *- -*--*-- ____ OCClfjlALDECORD COPY

9612270100 961211

.

PDR

ADOCK 05000255

Q

PDR

.:* *.~.*\\" -~ : .

. ,

..

. *-:.

' ' '.

~\\:.*: .,_~ >":;~-~~1

..

  • ,**_: .. }_.:~::*

~

'December 11, 1996

_ .. ___ -*-:

.~-.-~-~*.~:-

Mr. T. Palmisano

General Manager

. -

- ~

.: . -,

' . *_ .. ,,. : : ~-

<<.:;*::::.~: ::.:*~:) '::

    • .' .* .. :;;>*~~;;~~(~.;~;

Palisades Nuclear Generating Plant

  • 27780 Blue Star Memorial Highway

Covert, Ml 49043-9530

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/96012(DRS)

Dear Mr. Palmisano:

On October 16, 1996, the NRC completed an inspection at your Palisades Nuclear ' * .

. Generating Plant. The enclosed report presents the results of that inspection.

-

.

. .

The inspection. covered a ten day period. The area.examined during .the inspection was ttt~ .

effectiveness of your controls in. identifying; resolving* and preventing issues that degrade ::\\,.:

the quality Qf plant operations .. or saf&ty problems. The_ purpose of the inspectiQri w~s :t.o .,.' ~:*

  • determine whether activities authorized by the license were conducted safely aod in":'-:.':'~.:;:': c<

accordance with NRC requirements.

-

  • ** *
  • . * ' : < >,.' * , __ .. , *~ '. .

In response to NRC concerns raised in Diagnostic Evaluation Team Inspection Report 50-

255/94014 regarding management's ineffective involvement in plant activities and .-

inadequate guidance to plant personnel, you initiated a number of improvement initiatives.

The inspectors concluded that significant progress had been made in establishing effective

self-assessment in the areas of operations and engineering. With respect to self-

assessments and audits, the processes and the performance observed were sound. with: .

. some exceptions. In most cases, problem identification appeared to be satisfactory:c *: .. *'* "--. , .

You are encouraged to continue your progress in this area and reminded that your*.**

attention to timely and thorough corrective actions must be maintained.

In accordance with 1 O CFR 2. 790 of the _NRC's "Rules of Practice," a copy of this letter

and the enclosed inspection report will be placed in the NRC Public Document Room~

Docket No. 50-255

Enclosure:

Inspection Report

Sincerely,

Original signed by Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of R~actor Safety *

No. 50-255/96012(DRS)

See Attached Distribution

DOCUMENT NAME: G:\\DRS\\PAL96012.DRS

To receive 11 copy of thl* document, lndle11te In the box *c* = Copy without attachment/enclosure *e* = Copy with attachment/enclosure

"N" = No copy

OFFICE

Riii ~ ~ Riii

,.) Riii

Riii

NAME

RLerch:nh

MRing

RGardner

HClayton/GGrant

DATE

12/ l /96

12/ /96

. -

'1

...

T. Palmisano

-2-

cc w/encl:

R. A. Fenech, Vice President,

Nuclear Operations

  • Distribution:

T. C. Berdine, Manager,

Licensing Department

James R. Padget( Michigan Public

Service Commission

-

Michigan Department of Public Health

Department of Attorney General (Ml)

--- ' Docket Fil& w/encl -

  • Riii PRR'"W/encl

SRls, Palisades,

BRP w/encl

LPM, NRR w/encl

,,, ... .,:"":"W'-.t---*1~\\**'h"\\*Jr_:'"*;..:~'. ;.__~.-

    • -

l£,{?~~.§.~IJ~.d i;-~:Q 1~Y\\' /~f.i~I ~

OC/LFDCB w/encl

DRP w/encl

DRS w/encl

  • -

- .*.'

... .::.: . .._

_: ._:

-* .. :- *\\*

,:

.,--:**r:-

.*

-.. ::=: .--...:;_, ,~~; .. r:* , ..

. ..

.. .-::.-

,.,

~-':; - - .. ,.-.

--

-

-

-

- .. * '. ~ :"'...
_

-* ...

-- *:' * :. _,:_;**-.;**;:..:'.!:

  • '~~;~r~-~.~~;_f_~f:,_:~~~!:t~):~k~~~,:~

. . . -

~-

-~

  • ";.
  • ..
        • ..

- .

Enf. Coordinator, *Aili w/en~i-. --

CAA 1. w/encl (E-mail)_

  • ,

' *

W. L. Axelson, Riii w/encl

- A. B. Beach, Riii w/encl

.

.

.* .

. .. * ...

  • . **.
  • -.: ...
  • .. -.

.......

.

. ., . ,~ :