Text
'
/
r 1~.
~
Mr. T. Palmisano General Manager December 10, 1996 Palisades Nuclear Generating Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530
Dear Mr. Palmisano:
In a telephone conversation on between Mr. R. Frigo and Mr. J. Lennarts, arrangements were made for the administration of licensing examinations at the Palisades Nuclear Plant.
The written and operating examinations are scheduled for the weeks of April 7 and 14, 199 7. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of March 24, 1997.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by January 6, 1997. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.
- Your staff should submit preiiminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying 9612160021 961210 PDR ADOCK 05000255 V
- 1
f *.
~
December 10, 1996 that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30, 1997. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.
Thank you for your consideration in this matter. Mr. R. Frige has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements, please contact Mr. J. Lennartz at (630) 829-9721.
Sincerely, Isl Dell R. McNeil (for)
Melvyn N. Leach, Chief Operator Licensing Branch Docket No. 50-255 cc:
R. A. Fenech, Vice President, Nuclear Operations Thomas C. Bordine, Manager, Licensing James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Department of Attorney General (Ml)
K. M. Haas, Training Manager Distribution:
Docket File PUBLIC IE-42 R. G. Schaaf, LPM, NRR Riii PRR DRS L. F. Miller, DRP DOCUMENT NAME:G:\\DRS\\PAL 12106.0L OCILFDCB SRI, Palisades S. A. Richards, NRRIHOLB To receive a copy of this docunent, indicate in the box *c* = Copy without attach/encl *E* = Copy with attach/encl
- N 11 = No c OFFICE RIII RIII NAME JLennartz:j MLeach DATE 12/ I0/96 12/ /() /96 OFFICIAL RECORD COPY