ML18066A538
| ML18066A538 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/08/1999 |
| From: | Anton Vegel NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Thomas J. Palmisano CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18066A540 | List: |
| References | |
| 50-255-99-08, 50-255-99-8, NUDOCS 9907130177 | |
| Download: ML18066A538 (2) | |
See also: IR 05000255/1999008
Text
July 8, 1999
Mr. Thomas J. Palmisano
Site Vice President and General Manager
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, Ml 49043-9530
SUBJECT:
PALISADES INSPECTION REPORT 50-255/99008(DRP)
Dear Mr. Palmisano:
On June 30, 1999, the NRC completed an inspection con.ducted at your Palisades Nuclear
Generating Plant. The enclosed report presents the results of that inspection.
- The inspection covered a 6-week period. Areas examined during the inspection are identified in
the report. Within these areas, the inspection consisted of a selective examination of
procedures and representative re.cords, interviews with personnel, and observations of activities
in progress. The purpose of the inspection effort was to determine whether activities authorized
by the license were conducted safely and in accordance with NRC requirements.
During this inspection period, we observed that the plant was operated in a safe and
conservative manner. Emergent repairs to an Emergency Diesel Generator were completed .in
a timely and skillful manner to prevent a challenge to plant operation. System engin.eering *
support during the emergent maintenance was thorough and pro-active. Also, use of risk
assessment information. by oper~tions personnel demonstrated a positive focus on safety.
No violations or deviations of NRC requirements were identifie_d.
In accordance with 1 O CFR 2. 790 of the NRC's "Rules of Practice," .a copy of this letter and the
enclo~ure will pe placed in the NRC Public Document Room.
Sincerely, *
Original signed by
9907130177'990708
ADQCK 05000255
Q
. .
Anton yegel, Chief
,
Reactor Projects Branch 6
Docket No. 50:-255
License No. DPR-:20
-- ---------Enclosure:-lnspection-R~port-so:.255199ooa(DRPr--- * -~
~---- -------:
See Attached Distribution
DOCUMENT NAME: G:\\PALl\\PAL99008.DRP
wlo attach/encl "E" = Co
w/attach/encl "N" = No co
To receive a co
OFFICE
NAME
DATE
OFFICIAL RECORD COPY
T. Palmisano
-2-
cc w/encl:
R. Fenech, Senior Vice President, Nuclear
Distribution:
CAC {E-Mail)
RPC (E-Mail)
Fossil *and Hydro Operations
N. Haskell, Director, Licensing
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
Department of Attorney General (Ml)
Emergency Management Divi~ion, Ml Department
of State Police
Project Mgr., NRR w/encl
J. Caldwell, Riii w/encl
- B. Clayton, Riii w/encl
SRI Palisades w/encl
DRPw/encl
DRS w/encl
Riii PRR w/encl
PUBLIC IE-01 w/encl
Docket File w/encl
GREENS
IEO (E-Mail)
DOCDESK (E-Mail) .
-*-- -----------
130026