Forwards Insp Rept 50-255/98-19 on 981008-1125.No Violations Noted.Noted That Weakness in Equipment Status Control Contributed to Incident That Inadvertently Drained Hydrazine Addition Tank to Turbine Building Sump
ML18066A347
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/14/1998
From: Anton Vegel
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18066A348 List:
References
50-255-98-19, NUDOCS 9812210148
Download: ML18066A347 (3)


See also: IR 05000255/1998019

Text

Mr. Thomas J. Palmisano

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351

December 14, 1998

Site Vice President and General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Me.morial Highway

Covert, Ml 49043-9530

SUBJECT:

PALISADES INSPECTION REPORT 50-255/98019(DRP)

Dear Mr. Palmisano:

On November 25, 1998, the NRC completed an inspection conducted at your Palisades Nuclear

Generating Plant. The enclosed report presents the results of that inspection.

The inspection covered a 7-week period. Areas examined during the inspection are identified in

the report. Within these areas, the inspection consisted of a selective examination of

procedures and representative records, interviews with personnel, and observations of activities

in progress. The purpose of the inspection effort was to determine whether activities authorized

. by the license were conducted safely and in accordance with NRC requirements.

During this inspection period, the conduct of operations continued to be professional with the

control room environment free of unnecessary distractions. The safety-related battery charger

and instrument inverter modification project proceeded without any significant problems.

Assigning licensed operators as permanent members of the modification work group was a

positive action, in that it fostered a strong tie between operations and the modification team.

The status of new and existing equipment was continuously displayed in the control room and

was also considered a positive action, in that it effectively identified equipment status to the

control room operators. While the battery charger and instrument inverter modification project

appears to have effective equipment status control, a weakness in equipment status control

contributed to an incident that inadvertently drained the hydrazine addition tank to the turbine

building sump. Also, weaknesses in this area have been identified during recent in$pections ..

The incident during this inspection period, combined with the past identified weaknesses

regarding equipment status control, highlights the need for continued effort in this area.

No violations or deviations of NRC requirements were identified.

I)


*--*--- j/__ __

-

-

---~ - -

-

- - --- -- -- - - - --- ---

-- -- -----


~---------------------

9812210148 981214

PDR

ADOCK 05000255

G

PDR

T. Palmisano

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Charles J. Phillips for

Anton Vegel, Chief

Reactor Projects Branch 6

Docket No.: 50-255

License No.: DPR-20

Enclosure:

Inspection Report 50-255/98019(DRP)

cc w/encl:

R. Fenech, Senior Vice President, Nuclear

Fossil and Hydro Operations

N. Haskell, Director, Licensing

R. Whale, Michigan, Public Service Commission

Michigan Department of Environmental Quality

Department of Attorney General (Ml)

Emergency Management Division, Ml Department

of State Police

DOCUMENT NAME: G:\\PALl\\PAL98019.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =

Co

w/attach encl "N" = No co

~~;;::;;;;;;==:;;;;;,;,,:========~~;============r==:=;2_~

__ ~_=--~-====;====r==============r====;i------~-


- --------OFFICE

11-~~~~~--+~----l~~__J~-+wd'll~~~..,.L---+~~~~--1..~+-~~~~-'----il

NAME

DATE

12/ 9 /98

12/ \\ "\\ /98

OFFICIAL RECORD COPY

T. Palmisano

Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/encl

J. Caldwell, Riii w/encl

C. Pederson, Riii w/encl

B. Clayton, Riii w/encl

SRI Palisades w/encl

DRP w/encl

TSS w/encl

DRS (2) w/encl

Riii PRR w/encl

PUBLIC IE-01 w/encl

Docket File w/encl

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

210104

-2-