UNITED STATES
- NUCLEAR REGULATORY COMMISSION REGION Ill 801 WARRENVILLE ROAD LISLE. IWNOIS 60532-4351 January 9, 1998 Mr. Thomas J. Palmisano Site Vice President and General Manager Palisades Nuclear Generating Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - PALISADES
Dear Mr. Palmisano:
On October 23, 1997, NRC Region Ill management and staff completed the semiannual Plant Performance Review (PPR) of Palisades. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for Palisades involved the participation of all Region Ill technical.divisions as well as responsible NRR staff, in *evaluating inspection results and safety performance information for the period from March through September 1997. PP Rs provide regional managemen,t. With, a* **.
- current surQmary of licensee performance and s~rve as inputs to the, NRG System~tic;:.. : **'.. **:,.. *.*. *
- * * * ':: Assessment of licensee Perform*ance *($ALP) and *senioimanagementnieeting:{SMMfreviews': : ~-*",
- No changes in inspection focus were identified as a result of the PPR.
This letter advises you of our planned. inspection effort resulting from the* Palisades PPR review:
The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately* *
- the next 6 months. The rationale or basis for each inspection outside the. cc>re *inspection program is provided so that you ar~ aware of the reason for emphasis in these program areas.
- Resi~ent inspections are not listed due to their ongoing and continuous nature.
~ :* ':.-
~ *-. *-'. --* -..
9801210265 980109 PDR ADOCK 05000255 G
PDR 111111111111111111111111111111111 Ill llll
- ll8454C*
-.*. '~ ~
- :'L; * ::: * '. :
-- '(:
- We Will infonn you of any changes to the inspection plan. If you have any questions -or *
- comments, please contact me at (630) 829-9629.
Sincerely,
~r?-~
Bruce L. B"'rgess, Chief fc*-
Reactor Projects Branch 6 Docket No. 50-255 License No. DPR-20
Enclosure:
ccw/encl:
~,:.._.
T ** ~....
Inspection Plan Robert A. Fenech, Senior Vice President, Nuclear, Fossil
- and Hydro Operations
- Thomas c. Bordioe, M~n~ger
. *. Licens_ing Department :.
- ~ Riehard Whale,)Jlit:higan, =,. *
- Public Service Commission Michigan Department of Environmental Quality Department of Attorney General (Ml)
.. *.~ :
. *..... :~ ~
.~.
IP - Inspection Procedure Tl - Temporary Instruction PALISADES
- {"~
INSPECTION 'PLAN Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/~ROGRAM AREA NUMBER OF,_.
PLANNED INSPECTORS:
INSPECTION DATES IP 84750 Radwaste Treatment/ Effluent Monitoring 2
12/15-19/97 IP 84750 Radwaste Treatment/ Effluent Monitoring 2
I 1/12-16/98 I
NUREG 1021 Licensed Operator ReQual Exam 2
3/23-27/98 IP 60851 I
1-2 To Be Determined When IP 60853 Spent Fuel Dry Cask Storage Cask Loading Resumes IP 60854 IP 60855
- *. d IP 83750 Occupational Radiation Exoosure 2
4/27198-5/1 /98 IP 37550 Engineering and.Technical 7/6-10/98 IP 40500 Support/SA/QV _.
3 7120-24/98 Tl 2515/137 Circuit Breaker Inspection 2
J..
.l :-.*'
TYPE OF INSPECTION -
COMMENTS Core Inspection Core Inspection ReQual Exam Routine inspection of all aspects of an independent spent fuel storage installation Core Inspection Core Inspection Temporary lnstruction(TI) 1
. i
. i*
- i
- l l
., (.
I
- 'j
. :.. ~
.* t
-~ -.
- ... -* ___.,_ *-... -~-. --*.
. -~..
We will inform you of any changes to the inspection plan. If you have any qu.estions or > * ',>;.,:,;/~::;:~::
comments, please contact me at (630) 829-9629.
Docket No. 50-255 License No. DPR-20
Enclosure:
Inspection Plan Sincerely,
/s/ Edward R.Schweibinz for Bruce L. Burgess, Chief Reactor Projects Branch 6 cc w/encl:
Robert A. Fenech, Senior Vice President, Nuclear, Fossil..
- and Hydro Operations Thomas c. Bordine, Manager
~
.., Li~nsing Department.,...
Richard Whale, Michigan**
- Public Service Commission Michigan Department of. *
- Environmental Quality*
'-*.*..,*.. (
Department of Attorney General (Ml)
Distribution:
Docket File w/encl DRP w/encl Project Manager, NRR w/encl Riii
- Enf.. Coordinator. w/encl
. CAA 1. w/encl (E::mail)
D.RS (2) w/enel.
- TSS w/encl
-...eveuc iE:~fw1eiicC,,..:... * * -:_ -
SRI Palisades w/eriel A. B. Beach w/encl Deputy RA. w/encl.
Riii PRR w/enCI DOCDESK (E-mail)
', '.-..:*: '........ ~
.e
~.-. **.:
- ", \\. *...... -*-* ~*:.
' J' DOCUMENT NAME: G:\\PALl\\INSPPLN5.PAL*
To rec*eive a* copy of this document~ indicate in the box: "C" = Copy without attachmentienclosure "E" =.
--.----**-~-~-~--*--------*--** **---
-+*--*-
Co with attachment/enclosure "N" = No co OFFICE Riii t: Riii
/!
Riii.
£ Riii
- t;:
NAME
-ESchweibinz:nh
- rt~*
DATE 01 /Cf /98 L RECORD COPY