ML18065B140
| ML18065B140 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 01/12/1998 |
| From: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Thomas J. Palmisano CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18065B141 | List: |
| References | |
| 50-255-97-17, NUDOCS 9801200148 | |
| Download: ML18065B140 (2) | |
See also: IR 05000255/1997017
Text
Mr. Thomas J. Palmisano
Site Vice President
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Cove.rt, Ml 49043-9530
January 12, 1998
SUBJECT:
NRC INSPECTION REPORT 50-255/97017(DRS)
Dear Mr. Palmisano:
On December 11, 1997, the NRC completed a follow-up inspection of your implementation of
1 O CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear
Power Plants," (the maintenance rule) at the Palisades Nuclear Generating Plant. The
enclosed report presents the results of that inspection.
No violations of NRC requirements were identified. We concluded that actions you
implemented properly addressed all open items from our Maintenance Rule Baseline
Inspection, and that your maintenance rule program continued to meet all requirements .
. In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely
Original Signed By J. A. Grobe
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
Enclosure:
cc w/encl:
Distribution
Inspection Report No. 50-255/97017(DRS)
Robert A. Fenech, Senior Vice President,
Nuclear, Fossil and Hydro Operations
Thomas C. Berdine, Licensing Manager
Richard Whale, Michigan Public
Service Commission
Michigan Department of Environmental Quality
Department of Attorney General (Ml)
Docket File w/encl
PUBLIC IE-01 w/encl
LPM, NRR-w/encl--*- *
DRP w/encl
RI 11 PRR w/encl
SRI, Palisades w/encl
J. L. Caldwell, Riii w/encl
A. B. Beach, Riii w/encl
DRS w/encl
DOCUMENT NAME: G:/DRS/PAL97017.DRS
Riii Enf. Coordinator w/encl
TSS w/encl
DOCDESK w/encl
CAA1 w/encl
I llllll 111111111111111111111111111111111
- 2829*
To receive a cop or this document, indicate in the box: *c* = Cop without attachmenvenclosure "E" = Cop with attachmenVenclosure "N" = No cop
OFFICE
Riii/DRS
Riii/DRS
Rlll/DRP
NAME
Farber
Gavula
BBurgess
DATE
01/
/98
01/
/98
01/
/98
9801200148 980112
"CFJCIAL RECORD COPY
reo l
A DOCK 05000255
G
Mr. Thomas J. Palmisano
Site Vice President
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, Ml.49043-9530
SUBJECT:
NRC INSPECTION REPORT 50-255/97017(DRS)
Dear Mr. Palmisano:
On December 11, 1997, the NRC completed a follow-up inspection of your implementation of
1 O CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear
Power Plants," (the maintenance rule} at the Palisades Nuclear Generating Plant. The
enclosed report presents the results of that inspection.
- No violations of NRC requirements were identified. We concluded that your corrective actions
were acceptable and were properly implemented.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
Enclosure:
cc w/encl:
Distribution
Inspection Report No. 50-255/97017(DRS)
Robert A. Fenech, Senior Vice President,
Nuclear, Fossil and Hydro Operations
Thomas C. Berdine, Licensing Manager
Richard Whale, Michigan Public
Service Commission
Michigan Department of Environmental Quality
Department of Attorney General (Ml)
Docket File w/encl
PUBLIC IE-01 w/encl
LPM, NRR w/encl
DRP w/encl
RI 11 PRR w/encl
SRI, Palisades w/encl
J. L. Caldwell, Riii w/encl
A. B. Beach, Riii w/encl
DRS w/encl
DOCUMENT NAME: G:/DRS/PAL97017.DRS
OFFICE
Riii/DRS
NAME
DATE
Riii Enf. Coordinator w/encl
TSS w/encl
DOCDESK w/encl
CAA1 w/encl