Forwards Insp Rept 50-255/96-05 on 960614.No Violations Noted.Concerns Expressed W/Issues Relating to safety-related Sys Operability
ML18065A838
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/30/1996
From: Polich T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18065A840 List:
References
NUDOCS 9608090221
Download: ML18065A838 (4)


See also: IR 05000255/1996005

Text

t,. *. ~

/

July 30, 1996

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-255/96005{DRP)

Dear Mr. Palmisano:

  • ,

' .

\\I

,'

"\\*

On June 14, 1996, the NRC completed an inspection at your Palisades Nuclear

Generating Plant.

The enclosed report presents the results of that

inspection.

Operation of the facility during the 7-week inspection period was generally

viewed as safety conscious.

However, the inspectors expressed concern with an

issue relating to safety related system operability. Specifically, during the

evolution of sampling safety injection tanks, the tanks are cross connected by

non-safety related nitrogen piping system.

We understand that your staff is

currently evaluating this issue. Weaknesses in your program to review design

basis documents were discussed in Report 50-255/96003. This report indicates

that an incomplete evaluations was performed with regards to testing of a

design basis requirement for the control room environment.

Your continued

attention in this area appears to be warranted.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter, and the enclosed inspection report will be placed in the NRC

Public Document Room {PDR).

Docket No. 50-255

License No. DPR-20

Sincerely,

/s/T. J. Polich, Acting Chief

  • T. J~ Polich, Acting Chief

Reactor Projects Branch 3

Enclosures:

Inspection Report

N9 .* 50-255/96005{DRP)

\\

,.. .. \\

See Attached Distribution

9608090221 960730

PDR

ADOCK 05000255

G

PDR

/"

~

'*

to

/\\ \\,. '-'

'*

... '.

'

T. Palmisano

Distribution:

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

-2-

R. W. Smedley, Manager, Licensing Dept.

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (Ml)

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI Palisades, Big Rock w/encl

Project Manager, NRR w/encl

A. B. Beach, w/encl

R:\\insprpts\\powers\\pali\\pal96005.drp

DRP w/encl

RII I PRR w/encl

G. E. Grant, Riii w/encl

IPAS (E-Mail) w/encl

RMB/FEES w/o encl

B. L. Burgess, w/encl

~ :;-et- a capy of Uita ~t.

h1~tcata ta Ula boa -c* * CopJ' wttllooMt attaclo/...:1 *[* * CopJ' wttll attacll/....:1

"ti" *

OFFICE

Riii

NAME

DATE

OFFICIAL RECORD COPY

... '

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351

July 30, 1996

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, HI

49043-9530

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-255/96005(DRP}

Dear Hr. Palmisano:

On June 14, 1996, the NRC completed an inspection at your Palisades Nuclear

Generating Plant.

The enclosed report presents the results of that

inspection.

Operation of the facility during the 7-week inspection period was generally

viewed as safety conscious.

However, the inspectors expressed concern with an

issue relating to safety related system operability. Specifically, during the

evolution of sampling safety injection tanks, the tanks are cross connected by

non-safety related nitrogen piping system.

We understand that your staff is

currently evaluating this issue. Weaknesses* in your program to review design

basis documents were discussed in Report 50-255/96003.

This report indicates

that an incomplete evaluations was performed with regards to testing of a

design basis requirement for the control room environment.

Your continued

attention in this area appears to be warranted.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter, and the enclosed inspection report will be placed in the NRC

Public Document Room (PDR).

Docket No. 50-255

license No. DPR-20

Enclosures:

Inspection Report

No. 50-255/96005(0RP}

See Attached Distrib~tion

Sincerely,

  • ~dJ~

T. J. Polich, Acting Chief

Reactor Projects Branch 3

  • ... '

T. Palmisano

-2-

Distribution:

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

R. W. Smedley, Manager, Licensing Dept.

James R. Padgett, Michigan Public

Service Conunission

Michigan Department of

Public Health

Department of Attorney General (MI)