ML18065A299

From kanterella
Jump to navigation Jump to search
Forwards 1995 ISI Rept 2-9. Rept Summarizes Results of ISIs Completed During 1995 Refueling Outage
ML18065A299
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/20/1995
From: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18065A301 List:
References
NUDOCS 9511280255
Download: ML18065A299 (1)


Text

consumers Power POW ERIN&

/llllCHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 20, 1995 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT PALISADES PLANT - REPORT OF 1995 INSERVICE INSPECTION Attached is a report of lnservice Inspection results for the Palisades Plant. This report summarizes the results of inservice inspections completed during the 1995 refueling outage. The report is submitted in accordance with Article IWA-6230 of the ASME B&PV Code,Section XI. Also attached are the NIS-2 forms for the examinations completed during the refueling outage.

No NRC response is required.

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Michigan Department of Labor, Boiler Division Nuclear Mutual Limited Insurance Co.

A CMS' ENERGY COMPANY