Notifies of Results of Insp Planning Portion of Mar 1995 PPR for Plant & Forwards semi-annual Insp Plan for Next Several Months
ML18064A802
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/08/1995
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fenench R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9506210022
Download: ML18064A802 (4)


Text

June 8, 1995 Mr. Robert A. Fenech, Vice President Nuclear Operations Palisades Nuclear Generating Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

SEMI-ANNUAL INSPECTION PLAN FOR PALISADES

Dear Mr. Fenech:

The NRC Region III office performs periodic Plant Performance Reviews (PPR) for the purposes of assessing licensee performance and developing facility inspection plans. The purpose of this letter is to notify you of the results of the inspection planning portion of our March 1995 PPR for the Palisades Nuclear Generating Plant. The intent of this effort is to help facilitate your resource planning as it relates to our inspection activities.

In the future, we will make approximate semi-annual notifications of our inspection plans to each Region III holder of a Part 50 power reactor license.

The enclosure to this letter provides the schedule for NRC inspections of the Palisades Nuclear Generating Plant which are planned for the next several months.

The plan is subject to change should circumstances dictate. These could include inspectton in one technical area pointing to a need to perform inspection or followup in another area, or reactive inspections in response to events.

We will inform you of any required changes to the schedule.

We are interested in feedback on this plan, and any concerns you may have about its potential impact.

If you have any questions or concerns regarding this plan, please contact Wayne Kropp at (708) 829-9633.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Docket No. 50-255

Enclosure:

Inspection Plan See Attached Distribution 9506210022 950608 PDR ADOCK 05000255 G

. PDR Sincerely, ts/W. L. AxelsoB W. L. Axel son, i rector Division of Reactor Projects

R. Dis tri byt ion:

cc w/encl:

T. Palmisano, General Manager Kurt M. Haas, Safety and Licensing Director J~mes R. Padgett, Michigan Public Service Conunission Michigan Department of Public Health Department of Attorney General (Ml) bee w/encl: Technical Division Directors DRP Chiefs DRS Chiefs DRSS Chiefs Distribution:

Docket File w/encl PUBLIC IE-01 w/encl OC/LFDCB w/encl SRI Palisades, Big Rock w/encl Project Manager, NRR w/encl (S-AUaclled C:O.C:u........,.)

0oc-11t:

0.. Dt all DRP w/encl RII I PRR w/encl G. E. Grant, Riii w/encl IPAS (E-Mail) w/encl To.-.c:atva

  • cop, of thta doc-..t, tlldtcata t* t~ boa *c*
  • eop, wtthout attach/...,1 *f*
  • eop, wtth attach/eACl
  • N*
  • Noc OFFICE RII I Rill NAME Pirok DATE 95 05 95

Distribution:

cc w/encl: Robert A. Fenech, Vice President, Nuclear Operations Kurt M. Haas, Safety and Licensing Director James R. Padgett, Michigan Public Service Convnission Michigan Department of Public Health Department of Attorney General (Ml) bee w/encl: Technical Division Directors DRP Chiefs DRS Chiefs DRSS Chiefs Distribution:

Docket File w/encl PUBLIC IE-01 w/encl OC/LFDCB w/encl SRI Palisades, Big Rock w/encl Project Manager, NRR w/encl OFFICE RII I NAME DATE 05 Riii Grant 05 95 DRP w/encl RI II PRR w/encl G. E. Grant, Riii w/encl IPAS (E-Mail) w/encl Riii Axelson 05 95

Enclosure INSPECTION PLAN NRC Inspection Program Mandatory Inspections ("core" inspections) are conducted at all plants. The resident inspector staff will conduct the following core inspections at Palisades in the next six months:

IP -

Operational safety areas will be inspected on an ongoing basis pursuant to NRC Inspection Procedure 71707.

Maintenance and testing activities will be inspected on an ongoing basis pursuant to NRC Inspection Procedures 62703, and 61726.

Engineering activities may be inspected at any time pursuant to NRC Inspection Procedure 37551.

Plant support activities (radiation protection, security, emergency planning, fire protection,.... )

may be inspected at any time pursuant to NRC Inspection Procedure 71750.

Periodic inspections by the assigned Project Engineer, Reactor Engineer, Reactor Assessment Representative, or the Lead Engineering Assessment Person may occur at any time in support of the core inspection program.

Planned NRC Regional Initiative (RI) Inspections through October 31, 1995 Procedure OPS -

MAINT -

ENG -

PLTSUP -

NRC Inspection Operations Maintenance Engineering Plant Support IP SALP. DESCRIPTION IP 73753 MAINT Inservice Inspection 2515/109 ENG Safety-Related Motor-Operated Valve Testing and Surveillance IP 73756 ENG Inservice Testing of Pumps and Valves IP 83750 PLTSUP Occupational Radiation Exposure {outage)

IP 37551 ENG Followup on DET issues DATE Refueling Outage Refueling Outage 9/11-15/1995 6/19-23/1995 9/11-15/1995