Forwards Insp Rept 50-255/94-16 on 940820-1012.Noncited Violations Identified
ML18064A432
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/21/1994
From: Kropp W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18064A433 List:
References
NUDOCS 9411010127
Download: ML18064A432 (4)


See also: IR 05000255/1994016

Text

  • ..
  • .

...

...... .

I:

Consumers Power Company

ATTN:

T. Palmisano

General Manager

October 21, * 1994 .*

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr.

Palmisan~:

SUBJECT:

NRC INSPECTION RE*PORT NO. 50-255/94016

This refers to the routine safety inspection conducted by Messrs. M: E.

Parker, D. G. Passehl, ahd others of this office and fro~. the Offices of

Nuclear Reactor Regulation and Nucle~r Material Safety and Safeguards, from

August 20 through October 12, 1994.

The inspection included a review of

activities at your Palisades Nuclear Generating Facility. At the conclusion*

of the inspection, the findings were discussed with those m~mbers of your .

staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these area~, the inspection consisted of a selective examination of procedures *

and repr~sentative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine.

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, certain of your activities, as

documented in Li~erisee, Event Reports involving inadvertent engineered safety

feature actuations ~nd a loss of containment integrity during refueling and a

dilution event that occurred during-this inspection period, appeared to be in

violation of NRC requirements.

However, because the violations meet the

criteria of 10 CFR 2, Appendix C, Section VII.B(2), the violations will not be

cited.

In accordance with. 10 CFR 2.790 of the* Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

9411010127 941021.

PDR

ADOCK 05000255

Q

PDR

"(

Consumers Power Company

ATTN:

T. Palmisano

General Manager

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION 111

801 WARRENVILLE ROAD

LISLE. ILLINOl.S 60532-4351

October 21, 1994

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr. Palmisano: *

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/94016

This refers to the routine safety inspection conducted by Messrs. M. E.

Parker, D. G. Passehl, and others of this office and from the Offices of

Nutlear Reactor Regulation and Nuclear Material Safety and Safeguards, from

August 20 through October 12, 1994.

The inspection included a review of

activities at your Palisades Nuclear Generating Facility. At the conclusion

of the inspection, the findings were discussed with those members of your

staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

. and representative records, interviews with personnel, and observation of

activities in progress.

The purpos~ of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, certain of your activities, as

documented in Licensee Event Reports involving inadvertent engineered safety

feature actuations and a loss of contai~ment integrity during refueling and a

dilution event that occurred during this inspection period, appeared to be in

viol~tion of NRC requirements.* However, because the violations meet the

criteria of 10 CFR 2, Appendix C, Section VIl.B(2), the violations will not be

cited.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document.Room.

Consumers Power Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. J. Kropp, Chief

Reactor Projects Secti-0n 2A

~nclosure:

Inspectiori Report

No. 50-255/94016{DRP)

Docket No. 50-255

License No. DPR-20

cc w/encl: Robert A. Fenech, Vice President,

Nuclear Operations

Kurt M. Haas, Safety

and Licensing Director

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General {Ml)

Distribution:

Docket File w/encl

PUBLIC IE~Ol w/encl

. OC/LFDCB w/encl

SRI, Palisades, Big Rock w/encl

Project Manager, NRR w/encl

R:\\

DRP w/encl

Riii * PRR w/encl

G. E. Grant, Riii w/encl

To receive a copy of this doc-nt. fndfcate fn the boa *c* * Copy wftloout attach/encl *[* * Copy wfth attach/encl

  • N* *

No co

.

OFFICE

Riii

tJ

RIII

Riii .

NAME

o~

Bur<fi

Pirok '!

Kropp wL

ara 2.a .fr-i.

DATE

10 .lo 94

10 ~ 94

10/ v 94

10 1° 94

r. -* f} n /!. ,.....,

.,._..

.:..~ *v . *.._.:

':~: '.~}

  • '

.

\\

I

Consumers Power Company

2

We.will gladly discuss any questions you have concerning this inspection.

Sincerty, /

w~Jt[chief

Reactor Projects Section 2A

Enclosure:

Inspection Report

No. 50-255/94016(DRP)

Docket No. 50-255

License No. DPR-20

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

Kurt M. Haas, Safety

and Licensing Director

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (MI)