ML18061A070
| ML18061A070 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar (NPF-090, NPF-091) |
| Issue date: | 03/02/2018 |
| From: | Simmons P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18061A070 (2) | |
Text
Watts Bar Nuclear PIant, Post Office Box 2000 Spring City, iennessee 37381 March 2, 2018 EPIP Revision 4
0041 5
0048 Title Site Area Emergency General Emergency 10 CFR 50, Appendix E,Section V 10 CFR 50 54(qX5) 10 cFR 72.44(f)
Effective Date 02t15t2018 02t14t2018 ATTN. Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Subject.
Watts Bar Nuclear Plant, Unit 1& Unit 2 Facility operating License No. NpF-go, NpF-96 NRC Docket No. 50-390, 50-391 Emergency Plan lmplementing Procedures Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E,Section V, 10 CFR 50'5a(q)(5), and 10 CFR 72.44(f), the following Emergency Plan tmplementing procedures (EPIP) have been revised with administrative and editorial changes:
The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plan. The revisions were admlnistrative in nature including changing references from "peer check" to "peer review" and revising the dial in number fir the ftait puOtic address system.
There arerlo regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.
Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant
U.S. Regulatory Commission March 2, 2018 Page 2 cc:
NRC Regional Administrator - Region ll NRC Senior Resident lnspector - Watts Bar Nuclear plant NRC Project Manager - Watts Bar Nuclear Plant