See also: IR 05000255/1994006
Text
- *
- *
Docket No. 50-255
License No. DPR-20
Consumers Power Company
ATTN:
T. Palmisano
General Manager
Palisades Nuclear Gen~rating Plant
27780 Blue Star Memorial Highway
Covert, MI
49043-9530
Dear Mr. Palmisano:
SUBJECT:
NRC INSPECTION REPORT NO. 50-255/94006
This refers to the routine safety inspection conducted by Messrs. M. E.
Parker, D. G. Passehl, K. Salehi, J. F. Schapker, and C. N. Orsini of this
office from March 15 through May 9, 1994.
The inspection included a review of
activities at your Palisades Nuclear Generating Facility. At the conclusion
of the inspection, the findings were discussed with those members of your
staff identified in the enclosed report .
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of a selective examination of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
No violations of NRC requirements were identified during the course of this
inspection. However, some concerns were identified when a spent fuel assembly
became stuck in its spent fuel pool rack location during withdrawal for
ultrasonic testing on March 11, 1994. Although the spent fuel assembly was
successfully recovered without incident, there were inadequate procedures to
ensure continuous manned coverage and monitoring of spent fuel pool water
level.
We noted that you had implemented appropriate procedural changes to
prevent similar occurrences in the future, and will continue to observe spent
fuel pool activities during future inspections.
9406010040 940525
ADOCK 05000255
O
- *
- *
)
Consumers Power Company
2
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Report
No. 50-255/94006(DRP)
Distribution
cc w/enclosure:
Robert A. Fenech, Vice President,
Nuclear Operations
David W. Rogers, Safety
and Licensing Director
OC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Palisades, LPM, NRR
SRI, Big Rock Point
G. E. Grant, Riii
S. Stein, SRS
b . /I /J
/ I.-_ ti
£..<.:~
ru~v
Rlll
...... -*,
~-
Sincerely,
ie~f1-d ( ~~&
1 ~5
W. J. Kropp, Chief
Reactor Projects Branch 2A
Rlll
' \\
R~
r
~
RI~
J 'f
p#~, 1"\\
lµl
1-r.,
Orsini
B'u*rgess
bsen
Kropp~ ~.
£'/~tf'i'f
(para 8)
(p a 7,,)
/\\'
~vi
\\.(pat~ 2" ) / .r;f
) J). \\
\\
'* I
- z, ~'VI
-'/,"
v
?
I
'.th\\-*
-~1--
/'
L., \\?"* . '..
_,
,..... "
~*
- *
)
Docket No. 50-255
License No. DPR-20
Consumers Power Company
ATTN:
T. Palmisano
General Manager
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Ill
801 WARRENVILLE ROAD
LISLE. ILUNOIS 60532-4351
MP.Y 2 5 1994
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, MI
49043-9530
Dear Mr. Palmisano:
SUBJECT:
NRC INSPECTION REPORT NO. 50-255/94006
This refers to the routine safety inspection conducted by Messrs. M. E.
Parker, D. G. Passehl, K. Salehi, J. F. Schapker, and C. N. Orsirii of this
office from March 15 through May 9, 1994.
The inspection included a review of
activities at your Palisades Nuclear Generating Facility. At the conclusion
of the inspection, the findings were discussed with those members of your
staff identified in the enclosed report .
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of a selective examination of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
No violations of NRC requirements were identified during the course of this
inspection.
However, some concerns were identified when a spent fuel assembly
became stuck in its spent fuel pool rack location during withdrawal for
ultrasonic testing on March 11, 1994.
Although the spent fuel assembly was
successfully recovered without incident, there were inadequate procedures to
ensure continuous manned coverage and monitoring of spent fuel pool water
level.
We noted that you had implemented appropriate procedural changes to
prevent similar occurrences in the future, and will continue to observe spent
fuel pool activities during future inspections .
- *
- *
1
Consumers Power Company
2
In accordance with 10 CFR 2.790 of the Commission's regulations; a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Report
No. 50-255/94006(DRP}
Distribution
cc w/enclosure:
Robert A. Fenech, Vice President,
Nuclear Operations
David W. Rogers, Safety
and Licensing Director
OC/LFDCB
Resident Inspector, Riii
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Palisades, LPM, NRR
SRI, Big Rock Point
G. E. Grant, RIII
S. Stein, SRS
Sincere11*
)~.' ~b:hief
Reactor Projects Branch 2A