ML18059A857

From kanterella
Jump to navigation Jump to search
Forwards LER-92-031-01 Re Inadvertent ESF Actuation Caused by Inadequate Test Procedures.Original Corrective Action to Revise Test Connection Drawings No Longer Required Because Plant Procedures Revised in Such Detail to Eliminate Need
Date released: 10/31/2018 Download: ML18059A857


LER 92-031-01:on 920402,left Channel DBA Sequencer Inadvertently Activated by Technician Preparing to Test Left Normal Shutdown Sequencer Due to Inadequate Test Procedures. Procedures RT-13A & B & RT-8C & D Revised
ML18059A858
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/18/1994
From: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18059A858 (4)
Forwards LER-92-031-01 Re Inadvertent ESF Actuation Caused by Inadequate Test Procedures.Original Corrective Action to Revise Test Connection Drawings No Longer Required Because Plant Procedures Revised in Such Detail to Eliminate Need
ML18059A856
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/18/1994
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18059A856 (1)