Forwards Insp Rept 50-255/93-17 on 930629-0812.No Violations Noted
ML18059A340
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/27/1993
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18059A341 List:
References
NUDOCS 9309080038
Download: ML18059A340 (4)


See also: IR 05000255/1993017

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

Docket No. 50-255

Consumers Power Co~pany

ATTN:

Gerald B. Slade

General Manager

Palisades ~uclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr. Slade:

AUG 2 7 1993

SUBJECT:

ROUTINE RESIDENT INSPECTION AT PALISADES NUCLEAR PLANT

This refers to the inspection conducted by Messrs. M. E. Parker, D. G.

Passehl, T. Tella, and T. Markley of this office, and M. K. Gamberoni of the

Office of Nuclear Reactor Regulation, from June 29 through August 12,

1993~

The inspection inc~ude~ a review of authorized acti~ities for your Palisades -

Nuclear Generating Facility.

At the conclusion of-the in~pection, the

findings were discussed with *those members of your staff identified in th~

enclosed report .

Areas examined during the inspection are i~entified in the report.

Withiri

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

During this inspection, an event _occurred during fuel handling in which a-

single fuel rod slipped off the handling tool,*but the involved parties did

not inform the co~trol rocim/~hift supervisor in a timely manner.

This is of

concern as the shift* supervisor: must be kept appraised of pl ant activities to

-be effective in performing his site emergency functions.

We will continue to

evaluate your actions in regard to this issue.*

No violations of NRC -requirements were identif1ed during the- course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report ~ill be placed in the NRC

Public Document

Roo~ .

9309080038 zggg~~55

~DR

ADOCK

PD~_

~,

Consumers Power Company

2

AUG 2 7 1993

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-255/93017(DRP)

cc w/enclosure:

David P. Hoffman, Vice President

Nuclear Operations

David W. Rogers, Safety

and Licensing Director

OC/LFDCB

Resident Inspector, Rill

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Palisades, LPM, NRR

M.-Gamberoni, NRR

SRI, Big Rock Point

~

Or\\fr1i

. RIII

~~

Sincerely,

&J~°t'~ ~~

k~:

B. L. Jorgensen, Chief

Reactor Projects Section 2A

RI II

RII I

Pirok

J~

'I

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

711 AOOSEVEL T ROAD

GLEN ELLYN, ILLINOIS 50137

Docket No. 50-255

Consumers Power Company

ATTN:

Gerald B. Slade

General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, Ml

49043-9530

Dear Hr. Slade:

AUG 2 71993

SUBJECT:

ROUTINE RESIDENT INSPECTION AT PALISADES NUCLEAR PLANT

This refers to the inspection conducted by Messrs. M. E. Parker, D. G.

Passehl, T. Tella, and T. Markley of this office, and M. K. Gamberoni of the

Office of Nuclear Reactor Regulation, from June 29 through August 12, 1993.

The inspection included a review of authorized activities for your Palisades

Nuclear Generating Facility. At the conclusion of the tnspecti-0n, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

During this inspection, an event occurred during fuel handling in which a

single fuel rod slipped off the handling tool, but the involved parties did

not inform the control room/shift supervisor in a timely manner.

This is of

concern as the shift supervisor must be kept appraised of plant activities to

be effective in performing his site emergency functions.

We will continue to

evaluate your actions in regard to this issue.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

Consumers Power Company

2

AUG 2 7 1993

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-255/93017(DRP)

cc w/enclosure:

David P. Hoffman, Vice President

Nuclear Operations

David ~. Rogers, Safety

and Licensing Director

OC/LFDCB

Resident Inspector, Riii

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Palisades, LPM, NRR

H. *Gamberoni, NRR

SRI, Big Rock Point .

Sincerely,