Summary of 921217 Meeting W/Util Re Initial Discussions of Plant IPE Program.List of Attendees & Meeting Handouts Encl. W/O Encl
ML18058B675
Person / Time
Site: Palisades 
Issue date: 02/19/1993
From: Masciantonio A
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9302260310
Download: ML18058B675 (3)


Text

Docket No. 5,0-255 February 19, 1993 LICENSEE:

Consumer Power Company FACILITY:

Palisades Nuclear Generating Plant

SUBJECT:

MEETING

SUMMARY

- INITIAL IPE RESULTS This meeting summary provides clarification of the information in the meeting summary on this subject dated January 6, 1993.

The NRC staff met with representatives of (on$4mers Power Company (CPCo) on December 17, 1992, for

.initial di'scussions* of the results of the Palisades Individual Plant Examination (IPE)-program.

The CPCo representatives provided a brief history

_ of,Probabflistic Risk Assessment (PRA) at Palisades, and an overview of the IPE process* *a.nd the~lev,e_l 1 and Level 2 analysis. A list of attendees and a copy of the mate~ial presented by the licensee was provided in the meeting summary of:*Janua_ry,-'6, 1993.

The results of the IPE have provided some containment performance insights.

Because of the -location of the containment sump, there is a possibility that if the reactor Jessel fails at low pressure and if debris begins to flow through cavity drains, calculations indicate that a path exists for molten debris to drain into th_e auxiliary building safeguards room.

It should be noted, however, that other unique features, namely; the reactor ve.ssel flooding system and integral vessel lower head, will act to mitigate this po~sibility. The licensee is examining the implications of this finding and is looking at possible plant modifi~ations or accident management schemes.

The meeting allowed the staff to gain some initial kriowledge of the

  • forthcoming IPE submittal-and to provide some feedback to the licensee.

An agreement was reached that the IPE report would be submitted at the end of January 1993.

cc:

See next page OFFICE LA:PDlll-1 NAME MShuttlewo

(

9~0226031Q~30219*

1 PDR ADOCK 050002'55 P

PDR Original signed by Armando Masciantonio, Project Manager Project Directorate 111-1 Division of Reactor Projects-111/IV/V Office of Nuclear Reactor Regulation PM:PDlll-1 ~

AMasciantonio LMarsh

\\

I

9

/

Mr. Gerald B. Slade Consumers Power Company cc:

M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 60603 Mr. Thomas A.* McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township.

36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Mr. Patrick M. Donnelly, Director Safety and Licensing Palisades Plant 27780 Blue Star Memorial Highway Covert, Michigan 49043 U.S. Nuclear Regulatory Commission Resident Inspector Office Palisades Plant 27782 Blue Star Memorial Highway Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3423 N. Logan Street P. 0. Box 30195 Lansing, Michigan 48909 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington DC 20037 Mr. David L. Brannen, Vice President Palisades Generating Company c/o Bechtel Power Corporation P. 0.

Box 2166 Houston, Texas, 77252-2166 Roy W. Jones, Manager Strategic Program Development Westinghouse Electric Corporation 4350 Northern Pike Monroeville, Pennsylvania 15146 Alora Davis Committment Tracking System Coordinator Palisades Plant Consumers Power Company 27780 Blue Star Memorial Hwy.

Covert, Michigan 49043-9530

.,/, r.

.~

Meeting Summary, Memoranda for Trip Reports or Site Visits DISTRIBUTION:

Docket File {50-255)

NRC & Local PORs PDIII-1 Reading File T. Murley/F. Miraglia J. Partlow J. Roe J. Zwolinski L. Marsh A. Masciantonio M. Shuttleworth OGC L. Wheel er C. Ader, RES J. Flack, RES W. Beckner R. Lobel'*

R.

Langstaff,.~RIII R. Hernan E. Jordan ACRS'*{lO)

w.

~hafer, Regi?n III

......