Forwards SE Accepting Util 920921 Response to Suppl 1 to Generic Ltr 87-02 on Condition That SQUG Commitments & Implementation Guidance Implemented
ML18058B252
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/23/1992
From: Masciantonio A
Office of Nuclear Reactor Regulation
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18058B253 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, TAC-M69468, NUDOCS 9212040330
Download: ML18058B252 (3)


Text

(

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-255 Mr. Gerald B. Slade Plant General Manager Palisades Plant Consumers Power Company 27780 Blue Star Memorial Highway Covert, Michigan 49043

Dear Mr. Slade:

November 23, 1992

SUBJECT:

SAFETY EVALUATION OF THE PALISADES PLANT 120-DAY RESPONSE TO GENERIC LETTER 87-02, SUPPLEMENT 1 (TAC NO. M69468} provides the Nuclear Regulatory Commission staff's evaluation of Consumers Power Company's (CPCo} response to Supplement No. 1 to Generic Letter (GL} 87-02 for the Palisades Plant, which was submitted to the staff in a letter dated September 21, 1992.

Supplement No. 1 to GL 87-02 required that all addressees provide, within 120 days of the issue date of the supplement, either a commitment to use both the Seismic Qualification Utility Group (SQUG} commitments and the implementation guidance described in the Generic Implementation Procedure, Revision 2 (GIP-2}, as corrected on February 14, 1992, and as supplemented by the staff's Supplemental Safety Evaluation Report No. 2 (SSER No. 2} on GIP-2, or else provide an alternative method for responding to GL 87-02.

The supplement also required that those addressees committing to implement GIP-2 provide an implementation schedule, and provide the detailed information as to what procedures and criteria were used to generate the in-structure response spectra to be used for USI A-46.

In addition, the staff requested in SSER No. 2, that the licensees inform the staff in the 120-day response* if they intend to change their licensing basis to reflect a commitment to the USI A-46 (GIP-2} methodology for verifying the seismic adequacy of mechanical and electrical equipment, prior to receipt of the staff's plant-specific safety evaluation (SE} resolving USI A-46.

Your response is. unclear as to whether or not CPCo intends to implement both the SQUG commitments and the implementation guidance.

The staff interprets your response as a commitment to the entire GIP-2 including both the SQUG commitments and the implementation guidance and, therefore, considers it acceptable. If the staff's interpretation is incorrect, then in accordance with Supplement ~o. 1 to-GL 87-02 you shoul~ provide fo~ staff review, as soon as practicable prior to implementation, the alternative criteria and procedures for responding to GL 87-02. Additionally, you should not merely follow the August 21, 1992, SQUG letter for implementing GIP-2 as stated in your submittal, but should refer to Enclosure 2 to this letter which provides the staff's response to the SQUG letter. The implementation schedule proposed ~

by CPCo is within the three-year response period requested by the staff in

~/

Supplement No. I to GL 87-02 and is therefore, acceptable.

(\\(!} \\

'V-9212040330 ~~R!

21 NRC RU ~Bllfm &iflif ~t *~(

PDR ADOCK 05000255 l p

PDR

~

. ")

J -;: ' ~

~...

1, ~,;-*

1 *.;.

,* :-.~ *. r i,.,

t r*

1'

  • <Mr. Gerald B.

~.

~

~.:... '/

Slade 2

  • November 23,., 1992 * *.;- *

'~ -..

  • c;
  • J'

~.,

  • 1.:_ *

\\

I

  • .,. *-~ ;.,;. Consumers Powers Company_ indicated that it intends to change.its ~licensing :.:"

... * ~':... ~basis methodology, *via 10 CFR 50.59, for verifying the seismic adequacy.of.:

  • ':' "*:new, replacement, and existing electrical and mechanical equipment prior to*-.

receipt of a final plant-specific SE resolving USI A-46.

The staff recognizes

'that CPCo may revise its licensing basis in accordance with 10 CFR 50.59 to*.. *.':

reflect the acceptability of the USI A-46 (GIP) methodology for verifying the,*

seismic adequacy of electrical and mechanical equipment covered by the GIP.,.*

a i

However, if.CPCo does not commit to implement both the SQUG commitments and. <

.~

the implementation guidance, and has not committed to any acceptable alternative criteria and procedures, then the staff dcies not believe that* it*

is-feasible,.* at thls time, for CPCo to chang~ its licensing basis in the manner described.

The staff has reviewed your response regarding in-structure response spectra and finds the response adequate and acceptable.

  • If you have questions regarding these items, please contact me on

. (301) 504-1337..

Enclosures:

1.~ Safetj Evaluation

2.

Staff's SQUG Respqnse cc w/enclosu~e~: *

  • See next page DISTRIBUTION:

CD~:l~i;1:e3

pp31 Reading File JZwolinski

.AMasc i ant on i o

,J. Norberg Palisade Plant File PC hen**

JMa Sincerely, Original. signed by_

  • Ar~and6 Ma~ciantoni6, Project Man~ger
  • .. P~oject Directorate III-1
  • Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Reg~lation PD Rs
  • .*JRoe LMarsh OGC *

. ACRS(lO)

WShafer, RI Il GBagchi

. PSears

  • c MMcBr-earty.~--~ -..... -* ---...

OFF I CE LA:. PD I I I -1

  • PM: POI II-1 EMEB*

. NAME*

MShuttl eworth AMasci antoni o: vb JNorberg LMarsh I/

Z3 92 11 20 92 II".zi 92.

DATE 11 20 92 OFFICIAL RECORD COPY FILENAME: PAL69468.LTR

.,\\.

  • I.

'r

.1

.-(&-*.*

~

Mr. Gerald B. Slade Consumers Power Company cc:

M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 60603 Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Mr. Patrick M. Donnelly, Director Safety and Licensing Palisades Plant 27780 Blue Star Memorial Highway Covert, Michiga~.* 49043 U.S. Nuclear Regulatory Commission Resident Inspect,or Office Pali sades Pl ant::._

27782 Blue Star Memorial Highway Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office Division of Radiol~gical Health Department of Public Health 3423 N. Logan Street P. O. Box 30195 Lansing, Michigan 48909 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington DC 20037 Mr. David L. Brannen, Vice President Palisades Generating Company c/o Bechtel Power Corporation P. 0.

Box 2166 Houston, Texas, 77252-2166 Roy W. Jones, Manager Strategic Program Development Westinghouse Electric Corporation 4350 Northern Pike Monroeville, Pennsylvania 15146 Alora Davis

. Committment Tracking System Coordinator Palisades Plant 27780 Blue Star Memorial Hwy.

Covert, Michigan 49043-9530