Delays Implementation of RHR HX Outlet Temp Element & Vent Stack Flow Rate Transmitter,Per Reg Guide 1.97,from 920901 to 921030.Delay Caused by Late Delivery by Vendor & Recent Unplanned Outage
ML18058B061
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/31/1992
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9209100067
Download: ML18058B061 (1)


Text

    • ~

consumers Power GB Slade General Manager POWERING MICHIGAN'S PROliRESS Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043 August 31, 1992 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - REGULATORY GUIDE 1.97 OUTSTANDING ITEMS - ADDITIONAL INFORMATION Consumers Power Company letter dated April 30, 1992 informed the NRC that the RHR heat exchanger outlet temperature element and the vent stack flow rate transmitter would be replaced with environmentally qualified instruments by September 1, 1992.

Due to late delivery by a vendor and the recent unplanned outage, we now plan to have the environmentally qualified instruments installed by October 30, 1992. This delay has been discussed with the NRC Palisades Project Manager.

~~

Gerald B Slade General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades

.'~9-20910006 j 920831 PDR ADOCK.05000255 p