ML18058B055

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Rev 11 to Suitability & Training Qualification Plan.Changes Consistent W/ Provisions of 10CFR50.54(p) & Acceptable
ML18058B055
Person / Time
Site: Palisades 
Issue date: 08/28/1992
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9209090344
Download: ML18058B055 (1)


Text

AUG 2 8 \\99Z Docket No. 50-255 Consumers Power Company ATTN:

Gerald B. Slade General Manager Palisades Nuclear Generating Plant 27780 Blue Star Memorial Highway Covert, MI 49043

Dear Mr. Slade:

This acknowledges receipt of your letter dated August IO, I992, which transmitted changes identified as Revision II to the Palisades Suitability and Training Qualification Plan submitted under the provisions of IO CFR 50.54(p).

We have reviewed the submitted changes and have determined that they are consistent with the provisions of IO CFR 50.54(p) and are therefore acceptable.

In accordance with IO CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Sincerely, ynthia D. Pederson, Chief Reactor Support Programs Branch cc: See Attached List bee:

NRR/DRIS/RSGB SG Case File:

0500025539WA SG Inspector File:

G. Christoffer SG Correspondence Fi]..e-:

G. Pirtle NRR Docket File: v

~le/jp 08/.:zB/92 R~

_p~hri staffer Riii

~ ~/~

- J~~sen r;derson ~

~ff}-

'\\

~