consumers Power POW ERi Nii MICHlliAN"S PROliRESS Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET 50-255 - LICENSE DPR PALISADES PLANT - COMPLETION OF THE INSERVICE INSPECTION OF STEAM GENERATOR TUBES.

Palisades Technical Specification 4.14.6a requires that within fifteen days following the completion of the inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the NRC.

On March 20, 1992 the inservice inspection of the Palisades steam generators was completed. Approximately 20% of the tubes in each steam generator were tested.

None of the tubes tested exhibited through wall indications equal to or greater than the plugging criteria of 40%.

Therefore, no tubes were plugged in either steam generator.

/~d~~/

Gerald B Slade ~-

Pl ant General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades flo'f7 n

~.., !\\ Q (' '::'l t;; ( u * /' 0***

  • v
--92o408026092o4-o8 ___ -~

PDR ADOCK 05000255 G

PDR

'/ ~