ML18057B311

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-255/91-15 on 910813-0923.No Violations Noted
ML18057B311
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/03/1991
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18057B312 List:
References
NUDOCS 9110140083
Download: ML18057B311 (4)


See also: IR 05000255/1991015

Text

Docket No. 50-255

Consumers Power Company

ATTN:

Gerald B. Slade

General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043

Dear Mr. Slade:

This refers to the routine safety inspection, conducted by Messrs.

J. K. Heller, J. R. Roton, Z. Falevits, and C. H. Brown of this office

during the period of August 13 through September 23, 1991, of activities

at the Palisades Nuclear Generating Plant authorized by NRC Facility

Operating License No.

DPR~20 and to the discussion of our findings with

Mr. T. J. Palmisano and others of your staff at the conclusion of the

inspection. This refers also to the routine Management Meeting which

was conducted by our respective staffs in the NRC Region III offices on

August 20, 1991.

The enclosed copy of our inspection report identifies areas examined during

the inspection and matters discussed at the meeting.

Within these areas, the

inspection consisted of a selective examination of procedures and representative

records, observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission

1 s regulations, a copy of

this .letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

tit~!~,'! (,?-/ ,c_,

Brent fiayfon, Chiep-c

Projects Branch 2

Enclosure:

Inspection Report

No. 50-255/91015(DRP)

See Attached Distribution

RII I

Fa~its

(para 6.b)

RII I

J~sen

lo!i/91

  • )

.J

-.

t'~

.. ~, **-

1 , L;. ,

  • .

-

_;_

' '-- . -* ...._;

0110140083 911003

~DR

ADOCK 05000255

O

PDR

RII I

~'{\\(

Gardner

(para 6.b) ~~

~Cla ton

10 >Y5' t

Consumers Power Company

Distribution

cc w/enclosure:

David P. Hoffman, Vice President

Nuclear Operations

P. M. Donnelly, Safety and

Licensing Director

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Palisades, LPM, .NRR

SRI, Big Rock Point

2

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

799 ROO:;EVEL T ROAD

GLEN ELLYN, ILLINOIS 60137

Docket No. 50-255

Consumers Power Company

ATTN:

Gerald B. Slade

General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043

Dear Mr. Slade:

This refers to the routine safety inspection, conducted by Messrs.

J. K. Heller, J. R. Roton, Z. Falevits, and C. H. Brown of this office

during the period of August 13 through September 23, 1991, of activities

at the Palisades Nuclear Generating Plant authorized by NRC Facility

Operating License No. DPR-20 and to the discussion of our findings with

Mr. T. J. Palmisano and others of your staff at the conclusion of the

inspection.

This refers also to the routine Management Meeting which

was conducted by our respective staffs in the NRC Region III offices on

August 20, 1991.

The enclosed copy of our inspection report identifies areas examined during

the inspection and matters discussed at the meeting.

Within these areas, the

inspection consisted of a selective examination of procedures and representative

records, observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's ~egulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-255/91015(DRP)

See Attached Distribution

Sincerely,

.\\cf~~

Projects Branch 2

Consum*ers Power Company

Distribution

cc w/enclosure:

David P. Hoffman, Vice President

Nuclear Operations

P. M. Donnelly, Safety and

Licensing Director

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Palisades, LPM, NRR

SRI, Big Rock Point

OCT o 0 1~m

2