Forwards SE of 900730 Safety Insp of Adequacy of 10CFR50.59 of S/G Replacement Project & Util 900920 Response to Open Items Noted in Insp Rept 50-255/90-17.Final Acceptability Reserved Until Structural Integrity Test Rept Reviewed
ML18057A674
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/20/1990
From: Brian Holian
Office of Nuclear Reactor Regulation
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18057A675 List:
References
PAL-90-39, NUDOCS 9012310002
Download: ML18057A674 (3)


See also: IR 05000255/1990017

Text

Docket No. 50-255

Serial No. PAL 90-39

Mr. Gerald B. Slade

Plant General Manager

Palisades Plant

27780 Blue Star Memorial Highway

Covert, Michigan 49043

Dear Mr. Slade:

November 20, 1990 e

SUBJECT:

PALISADES PLANT - SAFETY EVALUATION RELATED TO THE CONTAINMENT

CONSTRUCTION OPENING AND RELATED OPEN ITEMS FROM lNSPECTION

REPORT 255/90017

A special safety inspection was conducted at the Palisades site the week of

July 30, 1990 to assess the adequacy of your 10 CFR 50 .59 evaluations i.n

support of the Steam Generator Replacement Project (SGRP).

By letter dated

September 20, 1990, Consumers Power Company responded to the open itt:ms

contained in the inspection report.

The re~ults of the staff r~view o~ your

- response to the inspection report open item-s are provided in the enclosed

Safety Evaluation.

Based on our on-site inspection of the updated facility change-packages,

coupled with our review of your response to Inspection Report 255/90017, the

staff has found that you have adequately addressed the SGRP modifications under

10 CFR 50.59.

Hmvever, firial acceptabili.ty of the containment structure by the

staff is reserved until we have completed our review of the Structural Integrity

Test Report.

r=-90i12310002 9gAgg7.0l

\\

~QR

ADOCK 0

~~R[j

\\._ __ -

- --------

Enclosure:

Safety Evaluation

cc w/enclosure _

See next page

DISTRIBUTION/

uUcR!i FILE

NRC & LOCAL

SMEADOR

BHOLIAN

ACRS(lO)

GBAGCHI

PD Rs

Sincerely,

Isl

Brian E. Holian, Project Manager

_Project Directorate III-1

Division of Reactor Projects III/IV/V

Office of Nuclear Reactor Regulation

PD31 R/F

OGC

JZWOLINSKI

EJORDAN

LA/PD31:Dal'~

SMEADOR ~

1 lf'J..0190

,,tfl

~

PM/PD31:DRP~f5

/ESGB

D

r/(}(

BHOLIAN

nJ;rJ

G AGCHI

R

11 lii.P /90

11 M /90

1

PALISADES SAFETY EVALUATION '1 1

AA3

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON. D. C. 20555

rccket No. 50-255

Serial No. PAL 90-39

Mr~ Gerald B. Slade

Plant General Manager

  • Palisadts Plant

27780 Blue .Star Memorial Highway

Covert, Michigan 49043

Dear. Mr. Slade:

November 20, 1990

SUBJECT:

PALISADES PLANT - SAFETY EVALUATION RELATED TO THE CONTAINMENT

CONSl RUCTION OPENING AND RELAl ED OPEN ITEMS FROM lN5PECTION

REPORl 255/90017

.

A spe_cia.l_'satety.-irispectior1 was conducted at tht Palisades *$ite the we.ek of

  • July 30, 1990 tc assess the adequacy of your 10 CFR 50.59 evaluations .in

support of the Steqm Generator R£*placement Project (SGRP).

By let:ter dated

September 20, 19~0 ~ Corisumers Power Con;pany res pended to the open items

.

coritcrfoed* in the inspection report.

The results of the staff review cf your

response -to th~ inspection.teport open items are provided in the enclosed

Safety Eva luat ior1.

Eased 011 our on-site i~spection of the updated facility change packages,

ccupl~d with our revie~ of y-0ur response t~ Inspectlon Report 255/90017, the

staff he. s found that you have adequately addressed th_e SGRP modif it;at io11s under

10 CFR 50.59.

However, firia.l' acceptability of ttie contairin:er1t structure by the

staff is )"e:served unti-1 *~1~ have comple~ed our revie~~ cf. the Structur:*al Integrity

Test Report.

~

Enclosure:

Safety Evaluation

cc w/enclosure

See next page

  • Sincerely,*

Brian*E. Holian, Project Manager

Project Directcrate III~l

Division of Reactor Projects III/IV/V

Office of Nuclear_Reactor Regulation

. -..

  • '

Mr. Gerald B. Slade

Consumers Power Ccmpany

cc:

  • '

M. I. Miller, Esquire.

Sidley g Austfo

54th Floor

Orie First t:atior;al Plaza

Chicago, Illi~ois 60603

Mr. Thomas A. McNish, Secretary

Consu~ers Powe~ Company

212 West Michigan A~eriue .

49201

Judd L. Bacon, Esquire

Cc~sumers Pcwer Cornpar~

Jackson\\ Michigar1

49201

  • -,

Rt.*gfor1al Aci'l=ir1istr'ator_, REgic:r* UI

U.S. Nllch:ar Regu1atc.ry Cornmissjcr1

799 Rccsevelt Road

Glen ,Ellyr,, Illino,is *,60137

... ierry Sarno

Tc0nship Supervisor

Cc1vert To~vr,ship,

36197 M-140' Hig~~ay

CovHt? Mithigan

490.43

  • Offke CJf He Gov*crnor

,, Roor.1 l - _Capitc*l Bui l~ii-19

tansi11g, ~~ich1gar1 48913 *

Mr. revid J. V~nd£walle

,.

. Directer, S~f£ty and Licensjng

Palisades Plant

27780 Blue* Star Memoria 1 H\\o1y.

Covert, Michigan

49043

Resideit Inspector

c/o U.S. Nuclear R~gul_atory Corrnds_SJ(lri

  • Pc.1isacfes P*lant

-

27782 Blue Star.Memorial Hwy.

Co~ert, Michigan 49043

  • '

. '

Palisades. Plant

~Nuclear Facilities and

, Environmental-Monitoring

Section Offic~*

  • Division of Radio.logical

Hea Tth

P.O. Box 30035

Lansing, M{chigari 48909

  • .Gerald Charrioff, P.C.
  • Shaw, .Pittman, Potts &
  • Trowbridge

2300 N.Street,-~.~I.

\\lashirigtor1~ D.C.

20037

Mr.-Dav~d .L.

Brann~n

'Vice PrE-5 ;*dtnt -, *

P~1is~des Gepetati~g Plant.

. .

. t/o Bechte 1_ PcMer Corpor9tJCJr,; * _

...

l5740' *Shady *"Gr:ove Rcac

  • *

.. Gaithcrsbufg; Maryland

20877

  • 'r*"""

~:

,: ,-.

-~ ....

' .

  • ~ .. '

"